Saturday, December 20, 2025
ADVT 
National

City Shares Proposed Design For Granville Bridge Connector, Seeks Public Input In Final Phase Of Engagement

22 Jan, 2020 08:44 PM

    After receiving almost 8,000 survey responses from the public, City staff are recommending the “West Side Plus” design option for the Granville Bridge Connector.

     

    Starting January 24, the public will have the opportunity to share final feedback before a proposed design is presented to City Council for decision.


    “West Side Plus was by far the most popular option with the public during two previous rounds of engagement,” said Paul Storer, Manager of Transportation Design. “People also shared ideas, many of which we’ve been able to incorporate, for improving the design to ensure it offers the best possible experience for users.”


    West Side Plus features


    The proposed design for the West Side Plus option includes wide, accessible sidewalks on both sides of the main span of the bridge, and a two-way bike lane on the west side. It also includes safety improvements at ramp crossings, and improvements at each end of the bridge to link the Connector to the rest of the area’s walking and cycling network. The design leaves the bridge with enough capacity to accommodate transit vehicles and motorists.


    “As the City’s population grows and climate-change concerns intensify, the need to offer sustainable travel options has never been more important,” says Storer. “This project will give people more travel options to and from downtown that don’t contribute to congestion or pollution.”


    In 2016, 18,000 residents and 17,000 jobs were within a five-minute walk of Granville Bridge and 90,000 residents and 125,000 jobs were within a five-minute bike ride. Despite being a direct route to and from downtown, few people bike or use the bridge’s sidewalks because they feel unsafe and uncomfortable or because it’s not accessible.


    As the City grows, even more people will live and work within easy walking and cycling distance of the bridge. Once the Granville Bridge Connector is completed, all three False Creek bridges will offer safe and accessible options for walking, rolling, and biking to and from downtown.


    The proposed design represents a vision for the long-term configuration of the bridge and will cost $30-40 million, excluding means prevention fencing. Like many capital projects, the project would likely be delivered in phases and through partnerships.


    The City’s current capital budget includes $25 million for the Granville Bridge Connector. This spring, staff will present to Council a conceptual, phased budget for the project that will include the first phase of work that falls within the 2019-2022 capital budget.

    MORE National ARTICLES

    Thousands Of Dollars In Cash, Jewelry Seized In Port Coquitlam Bust

    Suspect Faces Charges Related To Break And Enter To West Vancouver Home, More Charges Could Be Laid

    Thousands Of Dollars In Cash, Jewelry Seized In Port Coquitlam Bust

    VPD Seizes Stolen Property Valued Close To $130,000

    VPD Seizes Stolen Property Valued Close To $130,000
    Vancouver Police seized close to a $130,000 worth of stolen property late last month after executing a search warrant at a home in the city’s eastside.

    VPD Seizes Stolen Property Valued Close To $130,000

    Power 5 Program Launches In North Vancouver Elementary Schools

    North Vancouver RCMP are launching a new initiative throughout district’s elementary schools. Power 5 promotes a simple but powerful concept

    Power 5 Program Launches In North Vancouver Elementary Schools

    Holiday Win Brings Burnaby Couple $500,000 ‘Extra’ Reasons to Celebrate

    Terry Lynne and Renato Vincelli have a few ‘Extra’ reasons to celebrate this holiday season after matching all four Extra numbers to win a merry $500,000 in the November 6, Lotto 6/49 draw. 

    Holiday Win Brings Burnaby Couple $500,000 ‘Extra’ Reasons to Celebrate

    IHIT Plead For Help To Solve Suspicious Death of 26-Yr-Old Bradley Kline In Surrey

    Man found killed inside a Surrey home, at 7055 144A St, last year has been publicly identified as 26-yr-old Bradley Steven Kline, and investigators say they may know who's behind his murder.  

    IHIT Plead For Help To Solve Suspicious Death of 26-Yr-Old Bradley Kline In Surrey

    SkyTrain Sexual Assault: Wanted Suspect Arrested By Metro Vancouver Transit Police For A Second Alleged Incident

    SkyTrain Sexual Assault: Wanted Suspect Arrested By Metro Vancouver Transit Police For A Second Alleged Incident
    The Arrest Comes Just Weeks After Police Launched A Public Awareness Campaign That Groping Is Sexual Assault.

    SkyTrain Sexual Assault: Wanted Suspect Arrested By Metro Vancouver Transit Police For A Second Alleged Incident