Sunday, July 5, 2026
ADVT 
National

Construction Starts At Halifax Shipyard On First Arctic Patrol Ship

Darpan News Desk The Canadian Press, 02 Sep, 2015 12:11 PM
  • Construction Starts At Halifax Shipyard On First Arctic Patrol Ship
HALIFAX — Irving Shipbuilding has started building Canada's first Arctic offshore patrol ship at the company's massive shipyard in Halifax.
 
Hundreds of employees gathered Tuesday in the new assembly hall as a huge sheet of cut steel was hoisted into place and a special ceremony was held to mark the occasion.
 
Kevin McCoy, president of Irving Shipbuilding, says welders, pipefitters, marine fabricators and ironworkers are involved in the project, which is on schedule.
 
"Today is a milestone we have all been anticipating,"  McCoy said in a statement. "It is a great day to be a shipbuilder in Nova Scotia as we mark the beginning of this generational opportunity."
 
The company says the ship will the first of up to 21 vessels that will renew Canada's fleet of warships over the next 30 years.
 
About 900 Irving employees are working on the project at two locations in the Halifax area, but that number is expected to jump to 1,600 over the next two years.
 
The federal government's $35-billion national shipbuilding strategy saw shipyards chosen to do the work in 2011.
 
Last September, Prime Minister Stephen Harper announced that the first patrol vessel would be named after Vice-Admiral Harry DeWolf, a Nova Scotia native who was one of Canada's most distinguished sailors during the Second World War.  DeWolf's lengthy naval career included command of HMCS St. Laurent and HMCS Haida from 1939 until 1944.
 
In January, federal officials formally announced that Irving Shipbuilding had been awarded a $2.3-billion build contract for a total six Arctic patrol vessels.
 
The first patrol ship is expected to be completed in 2018. McCoy has said the final patrol ship will be delivered in 2022.
 
Irving Shipbuilding says employment at the company is expected to grow to 2,500 when peak production is reached with construction of the larger surface combatant vessels, which will replace Canada's current fleet of Halifax-class frigates and Iroquois-class destroyers.
 
Irving Shipbuilding, under the name Saint John Shipbuilding, was the lead contractor on the construction of the existing frigates in the late 1980s and throughout the 1990s.

MORE National ARTICLES

Phase 1 Cleanup Done At Site Of B.C.'s Mount Polley Mine Disaster: Ministry

VANCOUVER — British Columbia's Ministry of Environment says the first stage of a massive recovery operation at the collapse of a tailings dam at the Mount Polley mine site has been complete.

Phase 1 Cleanup Done At Site Of B.C.'s Mount Polley Mine Disaster: Ministry

Jason Boyachek, Alberta Man Pleads Guilty In Iowa To Role In Pot Smuggling Ring

Jason Boyachek, Alberta Man Pleads Guilty In Iowa To Role In Pot Smuggling Ring
The Waterloo-Cedar Falls Courier reports that 42-year-old Jason Boyachek, of Edmonton, on Monday pleaded guilty in U.S. District Court in Cedar Rapids to conspiracy to distribute marijuana.

Jason Boyachek, Alberta Man Pleads Guilty In Iowa To Role In Pot Smuggling Ring

Batman Says He Has Batmobile Trouble, Leaves Traffic Chaos On Ontario Highway

Batman Says He Has Batmobile Trouble, Leaves Traffic Chaos On Ontario Highway
Drivers returning from Ontario's cottage country clogged Highway 401 near Napanee on Sunday evening as they watched Batman, in his Batsuit, working on his Batmobile.

Batman Says He Has Batmobile Trouble, Leaves Traffic Chaos On Ontario Highway

Drug Users In Coquitlam Warned After Lab Tests Find Dangerous Fentanyl

COQUITLAM, B.C. — A powerful pain killer that has killed more than 75 people in British Columbia last year has shown up on the streets of Coquitlam.

Drug Users In Coquitlam Warned After Lab Tests Find Dangerous Fentanyl

'No Locals' Policy Disputed By Prince George Hotel That Turfed Mom, Kids

'No Locals' Policy Disputed By Prince George Hotel That Turfed Mom, Kids
PRINCE GEORGE, B.C. — A hotel in Prince George, B.C., says its employee was "misinformed" when he told a Prince George mother she was not welcome at the establishment.

'No Locals' Policy Disputed By Prince George Hotel That Turfed Mom, Kids

Squamish Nation Continues Talks, Postpones Vote On Woodfibre LNG Facility

Squamish Nation Continues Talks, Postpones Vote On Woodfibre LNG Facility
SQUAMISH, B.C. — The Squamish First Nation has delayed a vote on a proposed $1.6 billion liquefied natural gas plant in its traditional territory while it negotiates with the project's backers during an unprecedented environmental review. 

Squamish Nation Continues Talks, Postpones Vote On Woodfibre LNG Facility