Friday, July 3, 2026
ADVT 
National

Construction Starts At Halifax Shipyard On First Arctic Patrol Ship

Darpan News Desk The Canadian Press, 02 Sep, 2015 12:11 PM
  • Construction Starts At Halifax Shipyard On First Arctic Patrol Ship
HALIFAX — Irving Shipbuilding has started building Canada's first Arctic offshore patrol ship at the company's massive shipyard in Halifax.
 
Hundreds of employees gathered Tuesday in the new assembly hall as a huge sheet of cut steel was hoisted into place and a special ceremony was held to mark the occasion.
 
Kevin McCoy, president of Irving Shipbuilding, says welders, pipefitters, marine fabricators and ironworkers are involved in the project, which is on schedule.
 
"Today is a milestone we have all been anticipating,"  McCoy said in a statement. "It is a great day to be a shipbuilder in Nova Scotia as we mark the beginning of this generational opportunity."
 
The company says the ship will the first of up to 21 vessels that will renew Canada's fleet of warships over the next 30 years.
 
About 900 Irving employees are working on the project at two locations in the Halifax area, but that number is expected to jump to 1,600 over the next two years.
 
The federal government's $35-billion national shipbuilding strategy saw shipyards chosen to do the work in 2011.
 
Last September, Prime Minister Stephen Harper announced that the first patrol vessel would be named after Vice-Admiral Harry DeWolf, a Nova Scotia native who was one of Canada's most distinguished sailors during the Second World War.  DeWolf's lengthy naval career included command of HMCS St. Laurent and HMCS Haida from 1939 until 1944.
 
In January, federal officials formally announced that Irving Shipbuilding had been awarded a $2.3-billion build contract for a total six Arctic patrol vessels.
 
The first patrol ship is expected to be completed in 2018. McCoy has said the final patrol ship will be delivered in 2022.
 
Irving Shipbuilding says employment at the company is expected to grow to 2,500 when peak production is reached with construction of the larger surface combatant vessels, which will replace Canada's current fleet of Halifax-class frigates and Iroquois-class destroyers.
 
Irving Shipbuilding, under the name Saint John Shipbuilding, was the lead contractor on the construction of the existing frigates in the late 1980s and throughout the 1990s.

MORE National ARTICLES

Harper Ratchets Up Powerful Anti-terror Rhetoric; Just Posturing, Trudeau Says

OTTAWA — Stephen Harper ramped up the anti-terror talk Monday, defending Canada's role in the fight against insurgents in the Middle East and slamming his two main rivals for what he considers their misguided opposition to military action.

Harper Ratchets Up Powerful Anti-terror Rhetoric; Just Posturing, Trudeau Says

Candid Photos Of Prince Charles And Princess Diana's Wedding Reception On The Auction Block

Candid Photos Of Prince Charles And Princess Diana's Wedding Reception On The Auction Block
A dozen candid and unpublished photos of Prince Charles and Princess Diana's wedding reception are the featured items at a Boston-area auction scheduled for next month.

Candid Photos Of Prince Charles And Princess Diana's Wedding Reception On The Auction Block

Diet Pepsi Gets Rid Of Aspartame In U.S., But No Change In Store In Canada

Diet Pepsi Gets Rid Of Aspartame In U.S., But No Change In Store In Canada
NEW YORK — A revamped Diet Pepsi without aspartame is popping up on store shelves in the U.S. So will people start flocking back to the soda?

Diet Pepsi Gets Rid Of Aspartame In U.S., But No Change In Store In Canada

U.S. Senator Plans Legislation Dealing With Proposed OPG Nuclear Waste Dump

U.S. Senator Plans Legislation Dealing With Proposed OPG Nuclear Waste Dump
DETROIT — A U.S. senator plans to introduce legislation related to a planned Canadian nuclear waste disposal facility near Lake Huron.

U.S. Senator Plans Legislation Dealing With Proposed OPG Nuclear Waste Dump

Alliance Pipeline: Could Take Several Days To Burn Off Hydrogen Sulphide Gas

Alliance Pipeline: Could Take Several Days To Burn Off Hydrogen Sulphide Gas
The operator of a major Canada-U.S. natural gas pipeline that has been shut down since Friday says it could take several days to burn off hazardous gas that mistakenly got into its system.

Alliance Pipeline: Could Take Several Days To Burn Off Hydrogen Sulphide Gas

Telus Hands CEO's Job Back To Entwistle, Says Natale Leaving By Year-End

The sudden change in leadership announced early Monday is being attributed to Natale's reluctance to move his family to Western Canada, where Telus has its headquarters and the core of its business.

Telus Hands CEO's Job Back To Entwistle, Says Natale Leaving By Year-End