Wednesday, December 31, 2025
ADVT 
National

Coquihalla Highway to reopen tomorrow

Darpan News Desk BC Government, 18 Jan, 2022 01:29 PM
  • Coquihalla Highway to reopen tomorrow

On Wednesday, Jan. 19, 2022, the Coquihalla Highway (Highway 5) will reopen to regular vehicle traffic between Hope and Merritt.

This will be a much more convenient route for people who need to travel between the Lower Mainland and the Interior, and is another significant milestone in the province’s recovery from the devastating storms.

Temporary repairs to the Coquihalla are in place while the ministry plans permanent repairs to the damaged sections. This means travel-pattern changes and reduced speed limits, with the trip between Hope and Merritt taking about 45 minutes longer than normal. This is a high-mountain route that can experience adverse weather and rapidly changing conditions that could require closure with minimal notice.

Electric-vehicle (EV) charging stations at Britton Creek are still out of operation. The nearest EV charging stations are in Hope and Merritt. There will continue to be increased enforcement on this route to ensure drivers are obeying the traffic laws and driving according to conditions.

On Wednesday, Jan. 19, weight restrictions will be lifted from Highway 99 between Pemberton and Lillooet. However, drivers of large commercial vehicles are discouraged from using this route because of the challenging terrain. It is recommended that only experienced winter drivers travel this route. There is an increased avalanche risk through this corridor, so drivers should be prepared for delays and before travelling should check: DriveBC.ca

In the Fraser Canyon, Highway 1 has partially reopened from Kanaka Bar south of Lytton to Spences Bridge. Drivers can expect delays on this section of Highway 1.

Highway 1 between Kanaka Bar and Hope remains closed. Record snowfalls and recent avalanche risks had delayed work around Jackass Mountain. However, crews are back on site and it is expected the highway will reopen to all vehicle traffic before the end of January.

When Highway 1 in the Fraser Canyon reopens, drivers can expect lengthy delays with additional travel times as long as two hours or longer, depending on the destination. Delays are a result of ongoing repairs, an at-grade train crossing, avalanche control and sections of single-lane alternating traffic, which includes a temporary single-lane bridge at the Jackass Mountain and Nicomen River crossing.

The highway will be open to legal width and weight loading, but loads will be limited to 25 metres in length until the rehabilitation of the highway bridge at Nicomen River is completed.

Drivers are reminded that B.C.’s winter-tire and chain-up regulations are in effect. Other safety tips for winter driving include travelling with a full tank of gas, food and water, and warm clothes. 

MORE National ARTICLES

243 COVID19 cases for Friday

243 COVID19 cases for Friday
Data from the B.C. Centre for Disease Control show that's the highest daily case count since late May. More than half of the latest cases as well as overall active infections are in the Interior Health region, where an outbreak was declared in the central Okanagan.

243 COVID19 cases for Friday

Two travellers fined $20K each for fake vax docs

Two travellers fined $20K each for fake vax docs
The Public Health Agency of Canada says the travellers also didn't comply with requirements to stay at a government-authorized hotel or to get tested upon arrival.

Two travellers fined $20K each for fake vax docs

Feds run $24B deficit over April and May

Feds run $24B deficit over April and May
The Finance Department's regular fiscal monitor says the budgetary deficit over April and May was $23.8 billion, down from the $86.8 billion recorded over the same months in 2020.    

Feds run $24B deficit over April and May

Feds extend business, worker aid to end of October

Feds extend business, worker aid to end of October
The decision means that wage and rent subsidies for businesses, and income support for workers out of a job or who need to take time off to care for family or stay home sick, will last until Oct. 23.

Feds extend business, worker aid to end of October

Federal data warns of risk of fourth COVID wave

Federal data warns of risk of fourth COVID wave
Canada's chief public health officer says long-term forecasts indicate that a hasty approach to reopening could portend a sharp resurgence of the virus by the end of the summer.

Federal data warns of risk of fourth COVID wave

Top doctors weigh in on Alberta's COVID plan

Top doctors weigh in on Alberta's COVID plan
Chief public health officer Theresa Tam is urging people to continue isolating, get tested for COVID-19 and inform their close contacts even if it is no longer mandated.

Top doctors weigh in on Alberta's COVID plan