Thursday, January 1, 2026
ADVT 
National

Coquihalla Highway to reopen tomorrow

Darpan News Desk BC Government, 18 Jan, 2022 01:29 PM
  • Coquihalla Highway to reopen tomorrow

On Wednesday, Jan. 19, 2022, the Coquihalla Highway (Highway 5) will reopen to regular vehicle traffic between Hope and Merritt.

This will be a much more convenient route for people who need to travel between the Lower Mainland and the Interior, and is another significant milestone in the province’s recovery from the devastating storms.

Temporary repairs to the Coquihalla are in place while the ministry plans permanent repairs to the damaged sections. This means travel-pattern changes and reduced speed limits, with the trip between Hope and Merritt taking about 45 minutes longer than normal. This is a high-mountain route that can experience adverse weather and rapidly changing conditions that could require closure with minimal notice.

Electric-vehicle (EV) charging stations at Britton Creek are still out of operation. The nearest EV charging stations are in Hope and Merritt. There will continue to be increased enforcement on this route to ensure drivers are obeying the traffic laws and driving according to conditions.

On Wednesday, Jan. 19, weight restrictions will be lifted from Highway 99 between Pemberton and Lillooet. However, drivers of large commercial vehicles are discouraged from using this route because of the challenging terrain. It is recommended that only experienced winter drivers travel this route. There is an increased avalanche risk through this corridor, so drivers should be prepared for delays and before travelling should check: DriveBC.ca

In the Fraser Canyon, Highway 1 has partially reopened from Kanaka Bar south of Lytton to Spences Bridge. Drivers can expect delays on this section of Highway 1.

Highway 1 between Kanaka Bar and Hope remains closed. Record snowfalls and recent avalanche risks had delayed work around Jackass Mountain. However, crews are back on site and it is expected the highway will reopen to all vehicle traffic before the end of January.

When Highway 1 in the Fraser Canyon reopens, drivers can expect lengthy delays with additional travel times as long as two hours or longer, depending on the destination. Delays are a result of ongoing repairs, an at-grade train crossing, avalanche control and sections of single-lane alternating traffic, which includes a temporary single-lane bridge at the Jackass Mountain and Nicomen River crossing.

The highway will be open to legal width and weight loading, but loads will be limited to 25 metres in length until the rehabilitation of the highway bridge at Nicomen River is completed.

Drivers are reminded that B.C.’s winter-tire and chain-up regulations are in effect. Other safety tips for winter driving include travelling with a full tank of gas, food and water, and warm clothes. 

MORE National ARTICLES

Full steam ahead for expanded Richmond Hospital

Full steam ahead for expanded Richmond Hospital
The cost is approximately $860.8 million and will be shared by the provincial government through Vancouver Coastal Health and the Richmond Hospital Foundation.

Full steam ahead for expanded Richmond Hospital

Makeshift COVID hospital to close in Vancouver

Makeshift COVID hospital to close in Vancouver
The makeshift hospital at the Vancouver Convention Centre, which was repurposed with COVID-19 overflow beds, is being shut down without ever taking patients.

Makeshift COVID hospital to close in Vancouver

Burrard Skytrain station in Downtown Vancouver to remain closed for 2 years as of early 2022

Burrard Skytrain station in Downtown Vancouver to remain closed for 2 years as of early 2022
TransLink today announced that it will be proceeding with a major upgrade to Burrard SkyTrain Station beginning in early 2022. The project will take approximately two years to complete and will require the closure of the station to allow the work to be done safely and more efficiently than were it to remain partially open during construction.

Burrard Skytrain station in Downtown Vancouver to remain closed for 2 years as of early 2022

33 COVID19 cases for Tuesday

33 COVID19 cases for Tuesday
In addition, 80.2% (3,470,198) of all eligible adults in B.C. have received their first dose and 49.1% (2,125,179) have received their second dose.

33 COVID19 cases for Tuesday

Documents detail BoC's bond buying on federal debt

Documents detail BoC's bond buying on federal debt
The briefing note from late last year appears to gloss over the bond-buying program despite the extraordinary effect it was having on debt yields.

Documents detail BoC's bond buying on federal debt

Pandemic response system could be better: Trudeau

Pandemic response system could be better: Trudeau
Prime Minister Justin Trudeau says there are ways to improve Canada's early pandemic alert and response systems, but insists Canada's top public health officials did start building a national response to COVID-19 very early on.    

Pandemic response system could be better: Trudeau