Sunday, July 5, 2026
ADVT 
National

Coquihalla Highway to reopen tomorrow

Darpan News Desk BC Government, 18 Jan, 2022 01:29 PM
  • Coquihalla Highway to reopen tomorrow

On Wednesday, Jan. 19, 2022, the Coquihalla Highway (Highway 5) will reopen to regular vehicle traffic between Hope and Merritt.

This will be a much more convenient route for people who need to travel between the Lower Mainland and the Interior, and is another significant milestone in the province’s recovery from the devastating storms.

Temporary repairs to the Coquihalla are in place while the ministry plans permanent repairs to the damaged sections. This means travel-pattern changes and reduced speed limits, with the trip between Hope and Merritt taking about 45 minutes longer than normal. This is a high-mountain route that can experience adverse weather and rapidly changing conditions that could require closure with minimal notice.

Electric-vehicle (EV) charging stations at Britton Creek are still out of operation. The nearest EV charging stations are in Hope and Merritt. There will continue to be increased enforcement on this route to ensure drivers are obeying the traffic laws and driving according to conditions.

On Wednesday, Jan. 19, weight restrictions will be lifted from Highway 99 between Pemberton and Lillooet. However, drivers of large commercial vehicles are discouraged from using this route because of the challenging terrain. It is recommended that only experienced winter drivers travel this route. There is an increased avalanche risk through this corridor, so drivers should be prepared for delays and before travelling should check: DriveBC.ca

In the Fraser Canyon, Highway 1 has partially reopened from Kanaka Bar south of Lytton to Spences Bridge. Drivers can expect delays on this section of Highway 1.

Highway 1 between Kanaka Bar and Hope remains closed. Record snowfalls and recent avalanche risks had delayed work around Jackass Mountain. However, crews are back on site and it is expected the highway will reopen to all vehicle traffic before the end of January.

When Highway 1 in the Fraser Canyon reopens, drivers can expect lengthy delays with additional travel times as long as two hours or longer, depending on the destination. Delays are a result of ongoing repairs, an at-grade train crossing, avalanche control and sections of single-lane alternating traffic, which includes a temporary single-lane bridge at the Jackass Mountain and Nicomen River crossing.

The highway will be open to legal width and weight loading, but loads will be limited to 25 metres in length until the rehabilitation of the highway bridge at Nicomen River is completed.

Drivers are reminded that B.C.’s winter-tire and chain-up regulations are in effect. Other safety tips for winter driving include travelling with a full tank of gas, food and water, and warm clothes. 

MORE National ARTICLES

Cdns must be savvy in navigating COVID expertise

Cdns must be savvy in navigating COVID expertise
The recent government guidance on mixing and matching mRNA vaccines amid delivery delays is one of the latest issues to stir up public debate, including within the scientific community.

Cdns must be savvy in navigating COVID expertise

751 unmarked graves at residential school site

751 unmarked graves at residential school site
A Saskatchewan First Nation says it has found 751 unmarked graves at the site of a former residential school. The Cowessess First Nation says ground-penetrating radar recently discovered the graves at the Marieval Indian Residential School.

751 unmarked graves at residential school site

Iran's 'reckless acts' caused Flight 752 crash

Iran's 'reckless acts' caused Flight 752 crash
The summary of a forensic report from the Canadian government says a "series of reckless acts and omissions" by Iranian authorities resulted in the fatal downing of a passenger jet in January 2020.

Iran's 'reckless acts' caused Flight 752 crash

Hussen: Flexibility on costs for housing projects

Hussen: Flexibility on costs for housing projects
The federal minister in charge of boosting the stock of affordable housing says the government can loosen its usually strict rules to help groups manage rising costs for construction materials.

Hussen: Flexibility on costs for housing projects

Heat 'dome' to bring sizzling temperatures to B.C.

Heat 'dome' to bring sizzling temperatures to B.C.
The weather office says an exceptionally strong ridge of high pressure will stall over the province raising temperatures in parts of the Fraser Valley, Fraser Canyon and southern Interior to 40 C, or higher, by Sunday or Monday.

Heat 'dome' to bring sizzling temperatures to B.C.

Heatwave danger: Burnaby RCMP urging caution after toddler falls from second-storey window

Heatwave danger: Burnaby RCMP urging caution after toddler falls from second-storey window
Burnaby RCMP is urging families to secure the windows in their homes this summer after a toddler fell from an apartment window on Sunday night. Police were called to Arcola Street near Sperling Avenue around 9:30 p.m. after witnesses saw the child fall from a window on the second floor.

Heatwave danger: Burnaby RCMP urging caution after toddler falls from second-storey window