Wednesday, July 8, 2026
ADVT 
National

Coquihalla Highway to reopen tomorrow

Darpan News Desk BC Government, 18 Jan, 2022 01:29 PM
  • Coquihalla Highway to reopen tomorrow

On Wednesday, Jan. 19, 2022, the Coquihalla Highway (Highway 5) will reopen to regular vehicle traffic between Hope and Merritt.

This will be a much more convenient route for people who need to travel between the Lower Mainland and the Interior, and is another significant milestone in the province’s recovery from the devastating storms.

Temporary repairs to the Coquihalla are in place while the ministry plans permanent repairs to the damaged sections. This means travel-pattern changes and reduced speed limits, with the trip between Hope and Merritt taking about 45 minutes longer than normal. This is a high-mountain route that can experience adverse weather and rapidly changing conditions that could require closure with minimal notice.

Electric-vehicle (EV) charging stations at Britton Creek are still out of operation. The nearest EV charging stations are in Hope and Merritt. There will continue to be increased enforcement on this route to ensure drivers are obeying the traffic laws and driving according to conditions.

On Wednesday, Jan. 19, weight restrictions will be lifted from Highway 99 between Pemberton and Lillooet. However, drivers of large commercial vehicles are discouraged from using this route because of the challenging terrain. It is recommended that only experienced winter drivers travel this route. There is an increased avalanche risk through this corridor, so drivers should be prepared for delays and before travelling should check: DriveBC.ca

In the Fraser Canyon, Highway 1 has partially reopened from Kanaka Bar south of Lytton to Spences Bridge. Drivers can expect delays on this section of Highway 1.

Highway 1 between Kanaka Bar and Hope remains closed. Record snowfalls and recent avalanche risks had delayed work around Jackass Mountain. However, crews are back on site and it is expected the highway will reopen to all vehicle traffic before the end of January.

When Highway 1 in the Fraser Canyon reopens, drivers can expect lengthy delays with additional travel times as long as two hours or longer, depending on the destination. Delays are a result of ongoing repairs, an at-grade train crossing, avalanche control and sections of single-lane alternating traffic, which includes a temporary single-lane bridge at the Jackass Mountain and Nicomen River crossing.

The highway will be open to legal width and weight loading, but loads will be limited to 25 metres in length until the rehabilitation of the highway bridge at Nicomen River is completed.

Drivers are reminded that B.C.’s winter-tire and chain-up regulations are in effect. Other safety tips for winter driving include travelling with a full tank of gas, food and water, and warm clothes. 

MORE National ARTICLES

Shootdown of Flight 752 was terrorist act: court

Shootdown of Flight 752 was terrorist act: court
An Ontario court has ruled that the Iranian military's downing of a passenger jet early last year was an intentional act of terrorism, paving the way for relatives of those killed to seek compensation from the country.

Shootdown of Flight 752 was terrorist act: court

Vaccination clinics better than schools: doctor

Vaccination clinics better than schools: doctor
Dr. Bonnie Henry says an estimated 310,000 children in that age group of 12-17 are eligible to be vaccinated, and clinic hours could be extended to remove some barriers to immunization as more vaccines are shipped to the province.

Vaccination clinics better than schools: doctor

Burnaby RCMP looking for a maskless man who assaulted a worker

Burnaby RCMP looking for a maskless man who assaulted a worker
The suspect attacked the employee and continued punching him in the head and back when he fell to the ground. When another employee interrupted the assault, the suspect threatened to kill the employee with a knife.

Burnaby RCMP looking for a maskless man who assaulted a worker

Overnight closure of George Massey Tunnel on May 28, 29

Overnight closure of George Massey Tunnel on May 28, 29
On both nights Friday and Saturday, the George Massey Tunnel will be closed in both directions from 10 p.m. to 4 a.m. The closure is necessary to safely allow testing of the tunnel’s fire suppression system and overhead lane control signals.

Overnight closure of George Massey Tunnel on May 28, 29

Too early to predict looser travel rules: Alghabra

Too early to predict looser travel rules: Alghabra
Speaking at a virtual news conference Thursday, Alghabra said decisions around hotel quarantines for air passengers and the eventual reopening of the border will hinge on expert advice and unspecified criteria tied to the pandemic.

Too early to predict looser travel rules: Alghabra

Mortgage tests tighten amid central bank warning

Mortgage tests tighten amid central bank warning
In its latest financial system review, the Bank of Canada said many households have taken on large mortgages compared with their income, limiting their flexibility to deal with an unforeseen financial shock like the loss of a job.    

Mortgage tests tighten amid central bank warning