Saturday, December 6, 2025
ADVT 
National

Court Hearings To Begin This Week Into Enbridge Cross-border Oil Pipelines

Darpan News Desk The Canadian Press, 07 Sep, 2015 11:59 AM
    CALGARY — A U.S. court begins hearing arguments this week in a lawsuit that claims increased volumes of oilsands crude have been allowed to flow from Canada into the United States without adequate public input or environmental review.
     
    Indigenous and environmental groups filed a lawsuit late last year against the U.S. State Department and Secretary of State John Kerry in federal district court. Hearings start in Minneapolis on Thursday.
     
    "Plaintiffs' members face increased risk of harm to their health, recreational, economic, spiritual and aesthetic interests as a result of the State Department's decision to allow projects with significant environmental impacts to proceed without fully analyzing and considering the impacts," the groups said in a complaint filed in February.
     
    At issue are a pair of Enbridge (TSX:ENB) oil pipelines between Hardisty, Alta., and Superior, Wisc.: Line 3 and Line 67, also known as Alberta Clipper.
     
    Both pipelines have presidential permits, the same crucial approval for cross-border infrastructure that TransCanada Corp. (TSX:TRP) has been painstakingly trying to obtain for its Keystone XL project since 2008.
     
    The two sides disagree over whether it's necessary to go through that process again if more crude is to flow through those lines.
     
    "Enbridge is operating its pipelines consistent with the presidential permits and other permits that it holds for Lines 3 and 67, while meeting its responsibility and obligations to serve its shippers' needs," said Enbridge spokesman Graham White in an email.
     
    In court documents, the defendants say the claims "lack merit" and ask the court to "dismiss the complaint in its entirety with prejudice."
     
    In early 2014, Enbridge announced it would be replacing Line 3 in its entirety and idling the old pipe, deeming that was a better option than fixing the whole 47-year-old line. At $7.5 billion, it would be the biggest project in Enbridge history.  
     
    In court filings, the defendants describe the Line 3 replacement as a "maintenance-driven" project, while the plaintiffs say Enbridge is aiming to build a whole new pipeline that should be subject to a full State Department review.
     
    The upgrade will enable the line to pump a maximum of 760,000 barrels per day, up from the current 390,000, according to Enbridge's own engineering analysis.
     
    Meanwhile, Enbridge is aiming to expand Line 67 from 450,000 barrels a day to 800,000 barrels a day. The plan does not entail laying down any new pipe; rather, capacity is to be boosted by adding pumping horsepower.
     
    Enbridge obtained a presidential permit in 2009 before starting up the first 450,000-barrel-per-day phase of the line, but the State Department says it needs to amend its environmental review before allowing the expansion to go ahead. That process is taking longer than Enbridge anticipated.
     
    In the interim, Enbridge has conceived a workaround that opponents have derided as a "switcheroo." It involves moving oil from Line 67 to Line 3 and back again through interconnections on either side of the border.
     
    The plaintiffs include the White Earth Nation, an Ojibwe reservation in northern Minnesota; Honor the Earth, an environmental group based on the White Earth Nation; Indigenous Environmental Network; Minnesota Conservation Federation; MN350; Center for Biololgical Diversity; Sierra Club and National Wildlife Federation.  
     
    Winona LaDuke, executive director of Honor the Earth, said opponents resorted to court action because "Enbridge and the State Department haven't listened to anything else."
     
    "If Enbridge would (obey) the laws of this country and the laws of our tribe, then we would not be in court."

    MORE National ARTICLES

    Court Awards Montreal-Based Indo-Canadian Activist Jaggi Singh $15,000 For Unlawful Arrest

    Court Awards Montreal-Based Indo-Canadian Activist Jaggi Singh $15,000 For Unlawful Arrest
    Montreal-based activist Jaggi Singh had filed a lawsuit against officers Frederic Mercier and George Lamirande for arresting and detaining him during an International Women's Day rally in March 2007

    Court Awards Montreal-Based Indo-Canadian Activist Jaggi Singh $15,000 For Unlawful Arrest

    Rain Dampens B.C. Coast, But Wildfires Still A Concern In Southern Interior

    Rain Dampens B.C. Coast, But Wildfires Still A Concern In Southern Interior
    KAMLOOPS, B.C. — A cooler trend across British Columbia hasn't dramatically reduced the number of wildfires.  

    Rain Dampens B.C. Coast, But Wildfires Still A Concern In Southern Interior

    North Vancouver High School Teacher, 39, Charged With Sexual Assault, Suspended Without Pay

    North Vancouver High School Teacher, 39, Charged With Sexual Assault, Suspended Without Pay
    A 39-year-old high school teacher has been charged with sexually exploiting one of his female students in North Vancouver

    North Vancouver High School Teacher, 39, Charged With Sexual Assault, Suspended Without Pay

    Air Miles For Active B.C. Residents Before Program Goes National: B.C. Minister Terry Lake

    Health Minister Terry Lake confirms B.C. and the Public Health Agency of Canada will roll out a rewards program this fall.

    Air Miles For Active B.C. Residents Before Program Goes National: B.C. Minister Terry Lake

    Canada's 'Technical Recession' Will Be Short-Lived, Economists Say

    Economists say data out this week is likely to show that Canada slipped into a technical recession in the second quarter, but the contraction should be short-lived. 

    Canada's 'Technical Recession' Will Be Short-Lived, Economists Say

    Death Of Red Panda Named Rakesh At B.C. Zoo Sparks Calls For Change From Animal Activists

    Death Of Red Panda Named Rakesh At B.C. Zoo Sparks Calls For Change From Animal Activists
    A male red panda named Rakesh died of a fungal infection at the Greater Vancouver Zoo on Aug. 17, two months after being transferred from Winnipeg as part of a program to preserve endangered species.

    Death Of Red Panda Named Rakesh At B.C. Zoo Sparks Calls For Change From Animal Activists