Sunday, March 8, 2026
ADVT 
National

Federal energy minister hails 'one project, one review' approval for B.C. LNG plant

Darpan News Desk The Canadian Press, 16 Sep, 2025 10:06 AM
  • Federal energy minister hails 'one project, one review' approval for B.C. LNG plant

Federal Energy Minister Tim Hodgson is hailing streamlined approval of a massive floating liquefied natural gas export facility off British Columbia's coast, saying it represents one of the largest private sector investments in Canadian history.

Hodgson says the Ksi Lisims LNG project that received a B.C. environmental certificate on Monday, followed by federal approval, is an example of the "one project, one review" system in which the Canadian government relied on the province for an assessment.

He says the project that is being developed in partnership between the Nisga'a Nation, Rockies LNG Limited Partnership and Western LNG represents the "culmination of years of advocacy" by Nisga'a president Eva Clayton.

However, four out of six other First Nations asked to provide consent did not grant it, and the project is also opposed by numerous environmental groups.

The project to build two floating facilities off Pearse Island in northwest B.C. is huge, designed to process two-billion cubic feet of gas per day and export 12-million tonnes of LNG per year.

Hodgson says the world "is relying on Canada for clean energy," and he looks forward to the project being built.

A group of environmental organizations said in a news release that the plan is a "failure of environmental leadership and a direct contradiction" of provincial and federal commitments to climate action. 

Lawyer Imalka Nilmalgoda from the group Ecojustice said it "is fundamentally at odds with B.C.’s claims to be a climate leader," while Isabel Siu-Zmuidzinas of the Wilderness Committee said the province was "green-lighting LNG projects that trample over communities and torch our climate goals." 

While the facility is being developed by the Nisga'a, Rockies LNG and Western LNG, documents show the project's assets will be constructed, owned and operated by wholly owned subsidiaries of Western LNG, based in Houston, Texas.

It will be supplied by the Prince Rupert Gas Transmission pipeline that is being built in northern B.C.

Picture Courtesy: THE CANADIAN PRESS/Darryl Dyck

MORE National ARTICLES

Trudeau aiming to secure extension to 2031 for signature $10-a-day child-care program

Trudeau aiming to secure extension to 2031 for signature $10-a-day child-care program
The federal government is trying to secure extensions through to 2031 for its national $10-a-day child-care program ahead of an expected election. Prime Minister Justin Trudeau announced today that 11 provinces and territories have agreed to extend the deals that give those jurisdictions billions of dollars to cut child-care fees for families.

Trudeau aiming to secure extension to 2031 for signature $10-a-day child-care program

Truckers scramble for new routes as tariffs bring shipments to a halt

Truckers scramble for new routes as tariffs bring shipments to a halt
Trucking companies are halting shipments, mulling layoffs and scrambling for new routes as tariffs wreak havoc on cross-border trade. The lead-up to U.S. President Donald Trump's sweeping 25 per cent tariff on Canadian imports as well as retaliatory duties from Canada that took effect Tuesday prompted a surge in deliveries over the past two months as shippers raced to beat the deadline.

Truckers scramble for new routes as tariffs bring shipments to a halt

Here's the latest as the U.S. imposes tariffs on goods from Canada and Mexico

Here's the latest as the U.S. imposes tariffs on goods from Canada and Mexico
U.S. President Donald Trump has imposed tariffs on imports from Canada and Mexico — a 25 per cent across-the-board levy, with a lower 10 per cent charge on Canadian energy — triggering a continental trade war. Here is the latest news (all times eastern):

Here's the latest as the U.S. imposes tariffs on goods from Canada and Mexico

Trump announces one-month pause on Mexican tariffs, no move on Canada

Trump announces one-month pause on Mexican tariffs, no move on Canada
U.S. President Donald Trump says Mexico will get a one-month pause on tariffs for imports under the Canada-U.S.-Mexico Agreement on trade. In a social media post, Trump says he made the decision after speaking with Mexican President Claudia Sheinbaum today, adding Mexico has worked with the U.S. on border security.

Trump announces one-month pause on Mexican tariffs, no move on Canada

B.C. signs $670-million pharmacare agreement with federal government

B.C. signs $670-million pharmacare agreement with federal government
The British Columbia and federal governments have signed a four-year, $670-million pharmacare agreement, giving universal access to contraceptive and diabetes medications. The plan will support nearly 550,000 B.C. residents with diabetes and provide 1.3 million people with a range of contraceptives.

B.C. signs $670-million pharmacare agreement with federal government

Another earthquake felt on B.C.'s south coast, third in two weeks

Another earthquake felt on B.C.'s south coast, third in two weeks
Another earthquake has shaken Victoria, becoming at least the third felt in British Columbia's capital in less than two weeks. Earthquakes Canada says the magnitude 3.9 earthquake occurred about 58 kilometres south of Victoria, at 4:18 p.m. on Wednesday.

Another earthquake felt on B.C.'s south coast, third in two weeks