Wednesday, March 11, 2026
ADVT 
National

Federal energy minister hails 'one project, one review' approval for B.C. LNG plant

Darpan News Desk The Canadian Press, 16 Sep, 2025 10:06 AM
  • Federal energy minister hails 'one project, one review' approval for B.C. LNG plant

Federal Energy Minister Tim Hodgson is hailing streamlined approval of a massive floating liquefied natural gas export facility off British Columbia's coast, saying it represents one of the largest private sector investments in Canadian history.

Hodgson says the Ksi Lisims LNG project that received a B.C. environmental certificate on Monday, followed by federal approval, is an example of the "one project, one review" system in which the Canadian government relied on the province for an assessment.

He says the project that is being developed in partnership between the Nisga'a Nation, Rockies LNG Limited Partnership and Western LNG represents the "culmination of years of advocacy" by Nisga'a president Eva Clayton.

However, four out of six other First Nations asked to provide consent did not grant it, and the project is also opposed by numerous environmental groups.

The project to build two floating facilities off Pearse Island in northwest B.C. is huge, designed to process two-billion cubic feet of gas per day and export 12-million tonnes of LNG per year.

Hodgson says the world "is relying on Canada for clean energy," and he looks forward to the project being built.

A group of environmental organizations said in a news release that the plan is a "failure of environmental leadership and a direct contradiction" of provincial and federal commitments to climate action. 

Lawyer Imalka Nilmalgoda from the group Ecojustice said it "is fundamentally at odds with B.C.’s claims to be a climate leader," while Isabel Siu-Zmuidzinas of the Wilderness Committee said the province was "green-lighting LNG projects that trample over communities and torch our climate goals." 

While the facility is being developed by the Nisga'a, Rockies LNG and Western LNG, documents show the project's assets will be constructed, owned and operated by wholly owned subsidiaries of Western LNG, based in Houston, Texas.

It will be supplied by the Prince Rupert Gas Transmission pipeline that is being built in northern B.C.

Picture Courtesy: THE CANADIAN PRESS/Darryl Dyck

MORE National ARTICLES

B.C. farmers challenge government order to cull ostrich herd over avian flu outbreak

B.C. farmers challenge government order to cull ostrich herd over avian flu outbreak
British Columbia ostrich farmers ordered to cull a herd of 400 due to an avian flu outbreak are holding onto hope that the Canadian Food Inspection Agency will change its mind before their kill date in just over two weeks.  The federal agency sent Universal Ostrich Farms Inc. a notice on Dec. 31 instructing their ostriches to be destroyed and disposed of by Feb. 1, but the owners are asking for more time to prove their farm should be spared. 

B.C. farmers challenge government order to cull ostrich herd over avian flu outbreak

First half of 5 lane Steveston interchange complete

First half of 5 lane Steveston interchange complete
B-C's Transportation Ministry says the first half of the new five-lane Steveston Interchange is now complete. Kelly Greene, M-L-A for Richmond-Steveston, says this marks a "major step" in improving transportation in the region, adding that once complete, it will improve connections between Highway 99 and the Steveston Highway.

First half of 5 lane Steveston interchange complete

Snowfall warning for Fort Nelson region

Snowfall warning for Fort Nelson region
Environment Canada has issued a snowfall warning for the Fort Nelson region. It says a Pacific frontal system will bring about 10 centimetres of snow starting this afternoon. The weather office says the snow will persist until tomorrow morning.

Snowfall warning for Fort Nelson region

Trudeau and the premiers meet to discuss a response to Trump's threatened tariffs

Trudeau and the premiers meet to discuss a response to Trump's threatened tariffs
Canada's premiers are set to meet with Prime Minister Justin Trudeau and members of his cabinet today to talk about U.S. president-elect Donald Trump's vow to impose steep tariffs. Trump has promised to impose 25 per cent tariffs on all Canadian and Mexican imports — one of several measures he says he'll enact on day one of his presidency through an executive order. He assumes that office on Monday.

Trudeau and the premiers meet to discuss a response to Trump's threatened tariffs

Ultrasound technician accused of sexually assaulting woman at Edmonton clinic

Ultrasound technician accused of sexually assaulting woman at Edmonton clinic
An ultrasound technician has been charged with sexually assaulting a patient at his southeast Edmonton clinic last year.  Edmonton police say 53-year-old Aasim Syed Ahmed was charged in August 2024 with one count of sexual assault.

Ultrasound technician accused of sexually assaulting woman at Edmonton clinic

As fruit buds swell, B.C. farmers hit by 2024 deep freeze hope for better harvest

As fruit buds swell, B.C. farmers hit by 2024 deep freeze hope for better harvest
Peter Simonsen says buds on the peach trees at his farm in Naramata, B.C., are already starting to swell early. With plants already budding because of the previous warmth, a year's worth of crops, including peaches and nectarines, were wiped out, along with the vast majority of cherries, and grapes used in B.C. wines. The loss cost hundreds of millions of dollars and left many farmers scrambling to stay afloat.

As fruit buds swell, B.C. farmers hit by 2024 deep freeze hope for better harvest