Tuesday, December 23, 2025
ADVT 
National

Federal energy minister hails 'one project, one review' approval for B.C. LNG plant

Darpan News Desk The Canadian Press, 16 Sep, 2025 10:06 AM
  • Federal energy minister hails 'one project, one review' approval for B.C. LNG plant

Federal Energy Minister Tim Hodgson is hailing streamlined approval of a massive floating liquefied natural gas export facility off British Columbia's coast, saying it represents one of the largest private sector investments in Canadian history.

Hodgson says the Ksi Lisims LNG project that received a B.C. environmental certificate on Monday, followed by federal approval, is an example of the "one project, one review" system in which the Canadian government relied on the province for an assessment.

He says the project that is being developed in partnership between the Nisga'a Nation, Rockies LNG Limited Partnership and Western LNG represents the "culmination of years of advocacy" by Nisga'a president Eva Clayton.

However, four out of six other First Nations asked to provide consent did not grant it, and the project is also opposed by numerous environmental groups.

The project to build two floating facilities off Pearse Island in northwest B.C. is huge, designed to process two-billion cubic feet of gas per day and export 12-million tonnes of LNG per year.

Hodgson says the world "is relying on Canada for clean energy," and he looks forward to the project being built.

A group of environmental organizations said in a news release that the plan is a "failure of environmental leadership and a direct contradiction" of provincial and federal commitments to climate action. 

Lawyer Imalka Nilmalgoda from the group Ecojustice said it "is fundamentally at odds with B.C.’s claims to be a climate leader," while Isabel Siu-Zmuidzinas of the Wilderness Committee said the province was "green-lighting LNG projects that trample over communities and torch our climate goals." 

While the facility is being developed by the Nisga'a, Rockies LNG and Western LNG, documents show the project's assets will be constructed, owned and operated by wholly owned subsidiaries of Western LNG, based in Houston, Texas.

It will be supplied by the Prince Rupert Gas Transmission pipeline that is being built in northern B.C.

Picture Courtesy: THE CANADIAN PRESS/Darryl Dyck

MORE National ARTICLES

Ontario First Nation asks for halt to Ring of Fire mining development

Ontario First Nation asks for halt to Ring of Fire mining development
Marten Falls First Nation, located about 400 kilometres northeast of Thunder Bay, has filed a statement of claim asking for interim and permanent injunctions preventing Ontario and Canada from funding or participating in mining-related activities in the Ring of Fire.

Ontario First Nation asks for halt to Ring of Fire mining development

Climate change major driver of surging algae levels in Canada's lakes: study

Climate change major driver of surging algae levels in Canada's lakes: study
Average algae levels have spiked seven-fold since around the 1960s compared to the previous century, according to a study of 80 lakes across Canada. 

Climate change major driver of surging algae levels in Canada's lakes: study

Family 'heartbroken' after B.C. mother and baby killed by falling tree

Family 'heartbroken' after B.C. mother and baby killed by falling tree
In a statement provided through the Comox Valley RCMP, the family thanks emergency responders and others on the beach at Cumberland Lake Park Campground who tried to save the pair on July 31.

Family 'heartbroken' after B.C. mother and baby killed by falling tree

Carney calls on Métis groups to help change Canada's 'economic trajectory'

Carney calls on Métis groups to help change Canada's 'economic trajectory'
"We have the opportunity to work together on transformative projects that can help change the economic trajectory of our country to the benefit of all," Carney said to Métis leaders from Ontario, Alberta, Saskatchewan and the N.W.T. who gathered in Ottawa for the meeting.

Carney calls on Métis groups to help change Canada's 'economic trajectory'

Two climbers, one of them injured, plucked off sheer mountain face in B.C.

Two climbers, one of them injured, plucked off sheer mountain face in B.C.
North Shore Search and Rescue says in a social media statement that they went in late Tuesday, but weather was rapidly deteriorating and the climbers were hanging mid-face on the 2,100-metre peak. 

Two climbers, one of them injured, plucked off sheer mountain face in B.C.

First Nation disappointed as B.C. court rejects challenge to Mount Polley dam level

First Nation disappointed as B.C. court rejects challenge to Mount Polley dam level
The Xatsull First Nation claimed the province's approval of the plan to raise the level of the dam in B.C.'s Interior by four metres was improper and done without "meaningful" consultation with the nation. 

First Nation disappointed as B.C. court rejects challenge to Mount Polley dam level