Monday, June 8, 2026
ADVT 
National

Flood-damaged B.C. highway reopens to trucks

Darpan News Desk The Canadian Press, 21 Dec, 2021 03:41 PM
  • Flood-damaged B.C. highway reopens to trucks

VANCOUVER - British Columbia's "hobbled" supply chains received a major boost with the reopening of the primary transport route for goods heading to and from Metro Vancouver, a spokesman for the trucking industry said.

The Coquihalla Highway between Hope and Merritt reopened ahead of schedule Monday to commercial traffic and intercity buses.

It had been closed since mid-November after severe washouts and floods damaged the four-lane route in numerous areas.

"The uncertainty we've had for the past month is what's really hobbled the industry," said Dave Earle, B.C. Trucking Association president, who travelled to Hope to participate in a reopening event.

"They're telling us it's about 45 minutes to one hour extra," he said of travel time on the route.

"The road is reopened for limited movements, and to be sure, it is not like the Coquihalla was. There are stretches where it's one lane of traffic in each direction, with speed limits of 60 (kilometres per hour)."

But the route is safe and the repair job that was done over the past month is "nothing short of absolutely spectacular," Earle said.

The Coquihalla, also known as Highway 5, opened ahead of schedule after it was closed to all traffic on Nov. 14, Transportation Minister Rob Fleming said.

Crews repaired and patched about 20 stretches of the highway over 130 kilometres, including seven collapsed or washed-out bridges, he said in a statement.

Atmospheric rivers brought record rainfall that caused flooding and debris slides throughout the Fraser Valley and southern Interior, closing highways, swamping farms and forcing thousands to evacuate their homes and communities.

"The people who build and maintain roads in B.C. have a reputation second to none, and their response to the recent disaster has been remarkable," said Fleming.

"Ministry teams, maintenance contractors and hundreds of workers going flat out in challenging conditions have allowed us to reopen the Coquihalla Highway today, giving B.C.'s commercial drivers a safe, efficient route between the coast and Interior."

Fleming had originally forecast the highway would not reopen until late January at the earliest.

More than 300 workers using 200 pieces of equipment moved over 400,000 cubic metres of gravel, rock, and other material to repair and reopen the highway in 35 days, the ministry said.

Earle said having the use of the Coquihalla Highway brings more predictability to the movement of goods through B.C.

"It's a game changer," he said. "If companies can reliably move loads in a reliable time frame they can plan better. We can get those efficiencies back into the supply chain."

With most commercial vehicles now moving to the Coquihalla Highway, Fleming said travel restrictions will be lifted from Highway 3 on Tuesday, allowing the route between Hope and Princeton to be used for non-essential travel.

Restrictions have also been lifted on Highway 99 from Pemberton to Lillooet, but large commercial vehicles are still not permitted on that section of the route, he said.

Fleming said the repairs to the Coquihalla Highway are temporary and commercial drivers should be prepared for reduced speed limits and pattern changes.

He also cautioned that highways 3 and 99 are mountainous routes where weather can change quickly and drivers should be prepared for winter conditions.

The Trans-Canada Highway in parts of the Fraser Canyon near Boston Bar remains closed due to flood damage and Highway 8 between Spences Bridge and Merritt is completely closed due to the impacts of flooding.

 

MORE National ARTICLES

Prime minister announces $1.3 billion for SkyTrain spur in Surrey and Langley, B.C.

Prime minister announces $1.3 billion for SkyTrain spur in Surrey and Langley, B.C.
The federal government is providing up to $1.3 billion to extend Metro Vancouver's SkyTrain line through Surrey and Langley. Prime Minister Justin Trudeau made the announcement in Surrey today with the SkyTrain line in the background and several protesters yelling in the plaza behind him.

Prime minister announces $1.3 billion for SkyTrain spur in Surrey and Langley, B.C.

VPD appealing for Tesla driver to come forward

VPD appealing for Tesla driver to come forward
Vancouver Police are looking to speak to the driver of a white Tesla, as investigators believe there is video on the vehicle’s camera that may have captured evidence related to the fatal collision that claimed the life of a 23-month old girl on Tuesday.

VPD appealing for Tesla driver to come forward

Canadian economy added 230,700 jobs in June

Canadian economy added 230,700 jobs in June
Statistics Canada says the economy added 230,700 jobs in June as restrictions put in place to slow the pandemic were rolled back across the country.

Canadian economy added 230,700 jobs in June

Border agency bracing for big travel weekend

Border agency bracing for big travel weekend
The Canada Border Services Agency says incoming traffic has increased about 25 per cent since Monday, when quarantine rules were waived for fully vaccinated Canadians and permanent residents.

Border agency bracing for big travel weekend

Transport minister halts trains near Lytton, B.C.

Alghabra says the Canadian National and Canadian Pacific railways must cease movement for 48 hours, except for emergency fire response and maintenance and repair work, on stretches of track spanning parts of the British Columbia interior.

Transport minister halts trains near Lytton, B.C.

Canada's top doctor worried as first doses slow

Canada's top doctor worried as first doses slow
Chief public health officer Dr. Theresa Tam says she is concerned that vaccination rates among younger Canadians aren't high enough.

Canada's top doctor worried as first doses slow