Wednesday, July 1, 2026
ADVT 
National

Letter demands halt to Site C construction

Darpan News Desk The Canadian Press, 28 Sep, 2020 06:07 PM
  • Letter demands halt to Site C construction

A former president of BC Hydro and a former federal fisheries minister are among 18 prominent Canadians urging the provincial government to halt work on a huge hydroelectric project in northeastern B.C.

The letter signed by former Hydro president Marc Eliesen, former fisheries minister David Anderson, Grand Chief Stewart Phillip of the Union of B.C. Indian Chiefs and others says construction of the Site C dam must stop while geotechnical problems are explored.

They say an independent team of experts should determine if the problems can be resolved and at what cost.

Further construction of the dam across the Peace River near Fort St. John requires diversion of the waterway, which the letter argues could be a "costly and potentially catastrophic mistake."

Those signing the letter urge Premier John Horgan to appoint an independent panel to assess geotechnical issues at Site C and to release those findings before making a decision about the future of the dam.

At a provincial election campaign event, Horgan said diversion of the river was needed to meet the project's timelines and to stay on budget.

"BC Hydro has been working hard to make sure that we get the project in place as quickly as possible in a cost-effective way," he added.

The utility could not immediately be reached for comment.

In the letter, the group also says a panel should look at all construction costs so far, as well as the final price to complete the megaproject.

It's estimated the dam could cost $12 billion, almost double the original estimate, and the letter warns geotechnical issues "will add immeasurably to the project's ballooning costs."

Others who have signed the open letter to Horgan include broadcaster and environmentalist David Suzuki, Chief Roland Willson of the West Moberly First Nations, economists, academics, engineers and politicians.

BC Hydro reported to the B.C. Utilities Commission in July that geological problems found late last year had created a "project risk," requiring stability measures to be taken on the right bank of the dam.

Horgan previously called that report "profoundly disappointing." A former B.C. deputy finance minister was appointed in early August and he is due to release a report in the coming weeks.

The letter says work on Site C must cease, in part because of the strain on provincial finances imposed by the COVID-19 pandemic.

"Now is not the time to be digging an even deeper financial hole on a costly project that may, given proper independent scrutiny, be found to be so structurally unsound as to be too risky to complete," the letter states.

MORE National ARTICLES

RCMP Looking For Suspect In Mischief To North Vancouver Detachment Building

North Vancouver RCMP are looking for a suspect who vandalized the Detachment building this morning and are pleading with the responsible party to turn themselves in.

RCMP Looking For Suspect In Mischief To North Vancouver Detachment Building

Serious Crash Leads To South Okanagan Power Outage

Penticton – Emergency crews respond to single vehicle collision into a power pole.

Serious Crash Leads To South Okanagan Power Outage

Ability To Fight Flu Depends On Which Virus Strain Dominated In Childhood: Study

Ability To Fight Flu Depends On Which Virus Strain Dominated In Childhood: Study
VANCOUVER - Researchers at two Canadian universities say the first type of influenza virus people are exposed to in early childhood dictates their ability to fight the flu for the rest of their lives.    

Ability To Fight Flu Depends On Which Virus Strain Dominated In Childhood: Study

New Talks Planned Over Disputed Gas Pipeline In Northern British Columbia

New Talks Planned Over Disputed Gas Pipeline In Northern British Columbia
Leaders of a First Nation in northern British Columbia who say they'll never consent to a natural gas pipeline through their traditional territory have agreed to seven days of meetings with the province.

New Talks Planned Over Disputed Gas Pipeline In Northern British Columbia

B.C. Launches Talks With Taxi Industry About Fees To Aid Disability Services

B.C. Launches Talks With Taxi Industry About Fees To Aid Disability Services
VICTORIA - Taxi drivers in B.C. will soon be able to purchase the same kind of insurance available to the ride-hailing industry, the transportation minister said Thursday.    

B.C. Launches Talks With Taxi Industry About Fees To Aid Disability Services

19-Yr-Old Brampton Man Dilkirat Dhaliwal Arrested And Charged for Attempted Murder

19-Yr-Old Brampton Man Dilkirat Dhaliwal Arrested And Charged for Attempted Murder
Investigators from the 21 Division Criminal Investigation Bureau have charged a 19-year-old Brampton man in relation to a stabbing investigation.    

19-Yr-Old Brampton Man Dilkirat Dhaliwal Arrested And Charged for Attempted Murder