Monday, December 22, 2025
ADVT 
National

Nearly 390 Kilometres Of Highway Improvements In Northern B.C.

Darpan News Desk , 22 Jul, 2019 08:19 PM

    Crews are starting work on a highway resurfacing project on Highway 37 between Stewart and Dease Lake, making the drive safer and smoother for travellers.


    This is one of nine major highway projects in northern B.C. that cover nearly 390 kilometres of highways and side roads.


    “We are hard at work in northern B.C. this summer, paving roadways and building essential infrastructure,” said Claire Trevena, Minister of Transportation and Infrastructure. “These important projects will make a big difference to local people and those travelling through the region.”


    This $7.9-million project includes approximately 27 kilometres of resurfacing along Highway 37, starting about 60 kilometres north of the Meziadin Junction and continuing north to Burrage Air Strip.


    The contractor, Pittman Asphalt of Prince George, will work to minimize traffic disruptions for people who live and work in this area.


    There are eight other major resurfacing projects taking place in northern B.C. this summer:


    Highway 97 (near Fort St. John): hot-in-place recycling for 45 kilometres of Highway 97, 10 kilometres of Beatton Airport Road and seven kilometres of 271 Road.


    Highway 97 (near Taylor): overlay asphalt resurfacing for 6.5 kilometres of Highway 97 from North Taylor Hill to the intersection of Swanson Road and Lumber Road, as well as a total of seven kilometres on various Peace District side roads.


    Highway 97 (near Dawson Creek): hot-in-place resurfacing for 52.8 kilometres of Highway 97 from East Pine Road to Road 247.


    Highway 52 (near Tumbler Ridge): sealcoating for 58.9 kilometres of Highway 52, from Junction 29 to Rat Lake Road.


    Highways 16 and 97 (near Prince George): mill and fill asphalt resurfacing for 34.2 kilometres of Highway 16 from Hooper Road to Jutland Road and Highway 97 from 5th Avenue to North Kelly Road.


    Highway 16 (near Burns Lake): mill and fill asphalt resurfacing for 36.4 kilometres of Highway 16 from Endako to Fort Fraser and Burns Lake Arterial.


    Highway 16 (near Telkwa): sealcoating for 34.7 kilometres of Highway 16 from Tower Road to Wakefield Road and on Babine Lake Road.


    Highway 16 (near Hazelton): sealcoating for 68.5 kilometres of Highway 16 from Boulder Creek West to New Hazelton and along the Kispiox Valley Road.
    Highway resurfacing improves the safety and efficiency of the roadway, provides safer driving conditions for the travelling public and improves the movement of goods and services.


    In total, there are 20 major highway and related infrastructure projects underway in northern B.C., representing an investment of nearly $154 million.

    MORE National ARTICLES

    Canada Files North Pole Competing Claim With Russia, Denmark

    Canada Files North Pole Competing Claim With Russia, Denmark
    Canada is heading for negotiations over who owns the North Pole.

    Canada Files North Pole Competing Claim With Russia, Denmark

    Weather Network Forecasts Starkly Different Summer Conditions Across Canada

    Weather Network Forecasts Starkly Different Summer Conditions Across Canada
    The weather this summer could be starkly different across the country, according to the latest long range forecast from The Weather Network.    

    Weather Network Forecasts Starkly Different Summer Conditions Across Canada

    Could This 20-Year-Old Montreal Polyglot Be Canada's Most Multilingual Student?

    MONTREAL — Georges Awaad answers the phone with a polite "Hello," but he could just as easily answer in Arabic, French, Japanese, or any of the other 15 languages he speaks.

    Could This 20-Year-Old Montreal Polyglot Be Canada's Most Multilingual Student?

    Three More Confirmed Measles Cases Brings Total To Eight In New Brunswick

    SAINT JOHN, N.B. — Health officials in New Brunswick have three more confirmed cases of measles — bringing the total to eight cases in the Saint John area.    

    Three More Confirmed Measles Cases Brings Total To Eight In New Brunswick

    As They Turn 85, Dionne Sisters Caution About The Perils Of Childhood Celebrity

    Within hours of their improbable birth on May 28, 1934, the Dionne quintuplets were thrust into the spotlight as reporters staked outside their family's isolated farmhouse in northern Ontario to see if any of the premature infants would make it through their first few days.

    As They Turn 85, Dionne Sisters Caution About The Perils Of Childhood Celebrity

    B.C.'s Drug Plan To Save Millions With The Use Of Biosimilar Drugs: Adrian Dix

    British Columbia says it will save more than $96 million in its prescription drug program by expanding the use of so-called biosimilar drugs to treat diabetes, arthritis and Crohn’s disease.

    B.C.'s Drug Plan To Save Millions With The Use Of Biosimilar Drugs: Adrian Dix