Tuesday, December 23, 2025
ADVT 
National

Nearly 390 Kilometres Of Highway Improvements In Northern B.C.

Darpan News Desk , 22 Jul, 2019 08:19 PM

    Crews are starting work on a highway resurfacing project on Highway 37 between Stewart and Dease Lake, making the drive safer and smoother for travellers.


    This is one of nine major highway projects in northern B.C. that cover nearly 390 kilometres of highways and side roads.


    “We are hard at work in northern B.C. this summer, paving roadways and building essential infrastructure,” said Claire Trevena, Minister of Transportation and Infrastructure. “These important projects will make a big difference to local people and those travelling through the region.”


    This $7.9-million project includes approximately 27 kilometres of resurfacing along Highway 37, starting about 60 kilometres north of the Meziadin Junction and continuing north to Burrage Air Strip.


    The contractor, Pittman Asphalt of Prince George, will work to minimize traffic disruptions for people who live and work in this area.


    There are eight other major resurfacing projects taking place in northern B.C. this summer:


    Highway 97 (near Fort St. John): hot-in-place recycling for 45 kilometres of Highway 97, 10 kilometres of Beatton Airport Road and seven kilometres of 271 Road.


    Highway 97 (near Taylor): overlay asphalt resurfacing for 6.5 kilometres of Highway 97 from North Taylor Hill to the intersection of Swanson Road and Lumber Road, as well as a total of seven kilometres on various Peace District side roads.


    Highway 97 (near Dawson Creek): hot-in-place resurfacing for 52.8 kilometres of Highway 97 from East Pine Road to Road 247.


    Highway 52 (near Tumbler Ridge): sealcoating for 58.9 kilometres of Highway 52, from Junction 29 to Rat Lake Road.


    Highways 16 and 97 (near Prince George): mill and fill asphalt resurfacing for 34.2 kilometres of Highway 16 from Hooper Road to Jutland Road and Highway 97 from 5th Avenue to North Kelly Road.


    Highway 16 (near Burns Lake): mill and fill asphalt resurfacing for 36.4 kilometres of Highway 16 from Endako to Fort Fraser and Burns Lake Arterial.


    Highway 16 (near Telkwa): sealcoating for 34.7 kilometres of Highway 16 from Tower Road to Wakefield Road and on Babine Lake Road.


    Highway 16 (near Hazelton): sealcoating for 68.5 kilometres of Highway 16 from Boulder Creek West to New Hazelton and along the Kispiox Valley Road.
    Highway resurfacing improves the safety and efficiency of the roadway, provides safer driving conditions for the travelling public and improves the movement of goods and services.


    In total, there are 20 major highway and related infrastructure projects underway in northern B.C., representing an investment of nearly $154 million.

    MORE National ARTICLES

    Quebec Court Of Appeal Rejects Class Action Against Loto-Quebec By Ticket Buyer

    The decision announced today upholds a previous Quebec Superior Court judgment that also rejected the request.

    Quebec Court Of Appeal Rejects Class Action Against Loto-Quebec By Ticket Buyer

    Former Senator Links Hijab And Mutilation At Quebec Secularism Hearings

    Hearings into Quebec's secularism bill veered off track Thursday when a former senator drew a connection between the Muslim head scarf, female genital mutilation and forced marriage.  

    Former Senator Links Hijab And Mutilation At Quebec Secularism Hearings

    Tom Cheung, Pastor, Father Of 3 From Richmond, Identified As Victim In Fiery Peace Arch Border Crossing

    SURREY, B.C. — A man who was killed in a fiery crash near the Peace Arch border crossing in British Columbia last week was a pastor and father of three from Richmond.

    Tom Cheung, Pastor, Father Of 3 From Richmond, Identified As Victim In Fiery Peace Arch Border Crossing

    Calgary Police Looking To Identify Good Samaritan In Turban Who Helped Young Child In Medical Distress

    Calgary Police Looking To Identify Good Samaritan In Turban Who Assisted Young Child In Medical Distress    

    Calgary Police Looking To Identify Good Samaritan In Turban Who Helped Young Child In Medical Distress

    Funeral Underway For 7-Year-Old Quebec Girl Whose Death Sparked Outrage

    Funeral Underway For 7-Year-Old Quebec Girl Whose Death Sparked Outrage
    The ceremony began at around 11 a.m. as several dozen family and friends accompanied a child-sized wooden coffin into the packed St-Eugene Church.

    Funeral Underway For 7-Year-Old Quebec Girl Whose Death Sparked Outrage

    Toronto Neurosurgeon Mohammed Shamji Who Killed His Wife Gets Life Sentence With No Parole For 14 Years

    Ana Fric says Mohammed Shamji had physically and sexually assaulted her daughter, Elana Fric Shamji, and also had extra marital affairs.

    Toronto Neurosurgeon Mohammed Shamji Who Killed His Wife Gets Life Sentence With No Parole For 14 Years