Sunday, December 21, 2025
ADVT 
National

New 8 lane tunnel to replace George Massey Tunnel by 2030

Darpan News Desk The Canadian Press, 18 Aug, 2021 02:09 PM
  • New 8 lane tunnel to replace George Massey Tunnel by 2030

An eight-lane tunnel under the Fraser River will replace an obsolete crossing that has frustrated Metro Vancouver drivers for decades.

The B.C. government announced the new tunnel connecting the cities of Delta and Richmond on Highway 99 will cost $4.15 billion, with an estimated completion date of 2030.

Construction of the replacement for the George Massey Tunnel is set to start in 2025,Transportation Minister Rob Fleming told a news conference Wednesday.

The new tunnel will improve traffic flow, save travel time and make travel easier for those taking transit, cycling or walking, he said, adding it will not be tolled.

Two of the eight lanes, one in each direction, will be dedicated to rapid bus transit and there will be separated pathways for cyclists and pedestrians.

"We're developing a tunnel that will not only significantly improve travel along (the) Highway 99 corridor but will also give people real options to leave their cars at home in favour of efficient public transit or active transportation," Fleming said.

Asked whether the planned tunnel will really reduce travel time for commuters during rush hour given two lanes will be reserved for buses, Fleming said the current four-lane tunnel uses a counter-flow system that leads to congestion.

"When it's in a counter-flow peak period, it goes down to one lane in one direction, so you get congestion throughout the (tunnel)" wherever you're heading, he said.

The tunnel option was chosen instead of an eight-lane bridge because it was endorsed by the regional district, causes the least harm to the surrounding area, including the river, and allows for work to start right away, the province said.

Former premier Christy Clark promised a 10-lane bridge during the 2013 election, but the work was put on hold when the NDP took power in 2017.

The bridge project had a completion date set for 2022 and in defence of the delay, Fleming pointed to "strenuous objections" to that plan from local governments.

An environmental assessment certificate had been issued for the previously planned bridge and Fleming said the province will move ahead immediately with improvements to the surrounding infrastructure while it works through the procurement and environmental assessment processes for the new tunnel.

"We're going to have a robust environmental assessment on this project, we're going to continue to work with Indigenous rights holders," he said.

The province is hoping to receive "significant federal contribution" to help cover the cost of the project, Fleming said.

"The discussions we've had with the federal government have been very productive in this regard," he said, adding that to his knowledge, the major parties campaigning in the federal election set for Sept. 20 are also supportive of the project.

"We've made the case that this is a nationally significant trade corridor."

Asked how long the new crossing is expected to keep up with population growth and development in the region, Fleming said congestion modelling and growth projections will be part of a business case that should soon be publicly available.

MORE National ARTICLES

Transport minister halts trains near Lytton, B.C.

Alghabra says the Canadian National and Canadian Pacific railways must cease movement for 48 hours, except for emergency fire response and maintenance and repair work, on stretches of track spanning parts of the British Columbia interior.

Transport minister halts trains near Lytton, B.C.

Canada's top doctor worried as first doses slow

Canada's top doctor worried as first doses slow
Chief public health officer Dr. Theresa Tam says she is concerned that vaccination rates among younger Canadians aren't high enough.

Canada's top doctor worried as first doses slow

Man, police dog dead in RCMP 'confrontation'

Man, police dog dead in RCMP 'confrontation'
A statement from the RCMP's head office in B.C. says it started Thursday morning when an officer tried to stop a vehicle over an outstanding warrant in Campbell River on Vancouver Island.

Man, police dog dead in RCMP 'confrontation'

Horgan wants to enlist military on wildfire front

Horgan wants to enlist military on wildfire front
Horgan says B.C. is experienced and accustomed to dealing with wildfires during the summer months, but massive, destructive fires over the past five years now demand governments look at new approaches to prevent and fight fires.

Horgan wants to enlist military on wildfire front

59 COVID19 cases for Thursday

59 COVID19 cases for Thursday
78.4% (3,635,811) of eligible people 12 and older in B.C. have received their first dose of COVID-19 vaccine and 40.0% (1,854,387) received their second dose.

59 COVID19 cases for Thursday

COVID vaccines still work against mutant, researchers find

COVID vaccines still work against mutant, researchers find
New research from France adds to evidence that widely used COVID-19 vaccines still offer strong protection against a coronavirus mutant that is spreading rapidly around the world and now is the most prevalent variant in the U.S.

COVID vaccines still work against mutant, researchers find