Sunday, December 21, 2025
ADVT 
National

Nova Scotia Confident In Renewable Energy Target With Or Without Muskrat Falls

The Canadian Press, 10 May, 2016 12:16 PM
    HALIFAX — Nova Scotia's energy minister says he's confident the province can meet its targets for renewable energy despite potential delays with the Muskrat Falls hydroelectric project in Labrador.
     
    Nova Scotia has set a goal of obtaining 40 per cent of its electricity from green sources by 2020 — with Muskrat Falls expected to provide slightly less than 10 per cent of the province's overall needs once it's online.
     
    Michel Samson says his department is looking at contingency plans to cover the difference, noting that the goal is still four years away.
     
    He says the province is continuing to invest in technologies such as power storage and tidal power in an attempt to increase the amount of renewable energy available.
     
    A consultant's report submitted at a Nova Scotia Utility and Review Board rate hearing warns the renewable target could be threatened if Muskrat Falls is delayed or cancelled.
     
    The report by Drazen Consulting Group says the province and Nova Scotia Power should have alternate plans in place in the event electricity doesn't flow from the project as expected.

    MORE National ARTICLES

    3 Arrested After Suspected Explosive Device Found In Vehicle At Sumas Border Crossing In Abbotsford

    3 Arrested After Suspected Explosive Device Found In Vehicle At Sumas Border Crossing In Abbotsford
    During a routine secondary examination at a crossing in Abbotsford, B.C., officials found what appeared to be a suspected explosive device and immediately called police.

    3 Arrested After Suspected Explosive Device Found In Vehicle At Sumas Border Crossing In Abbotsford

    Amarinder Singh Forced To Cancel Political Rallies In Vancouver And Toronto

    Amarinder Singh Forced To Cancel Political Rallies In Vancouver And Toronto
    Sikhs for Justice, a human rights advocacy group, had lodged a complaint with the Canadian government against the election activities planned by Amarinder Singh.

    Amarinder Singh Forced To Cancel Political Rallies In Vancouver And Toronto

    Drug-Impaired Driving Concerns Have Police Testing Roadside Devices

    Doug Beirness, vice-chairman of the Canadian Society of Forensic Science's Drugs and Driving Committee, says the Mounties and the Ontario government funded the scientists' research.

    Drug-Impaired Driving Concerns Have Police Testing Roadside Devices

    Wijdan Yasir, 28-Year-Old Calgary Man Charged With Sexual Assault At Hotel Pool

    Wijdan Yasir, 28-Year-Old Calgary Man Charged With Sexual Assault At Hotel Pool
    He is charged with three counts of sexual assault and two counts of sexual interference. Yasir was released from custody on $1,000 bail and is scheduled to appear in court April 29.

    Wijdan Yasir, 28-Year-Old Calgary Man Charged With Sexual Assault At Hotel Pool

    Collingwood, Ont., Residents Fight Wind Turbines Planned Near Local Airport

    Local municipalities, residents and a pilots' association say they don't want eight, 50-storey-tall wind turbines so close to the Collingwood airport and the nearby Clearview Aerodrome.

    Collingwood, Ont., Residents Fight Wind Turbines Planned Near Local Airport

    Kohinoor's Tragic Tale From Lahore To Buckingham Palace

    Kohinoor's Tragic Tale From Lahore To Buckingham Palace
    As the row over the Kohinoor diamond intensifies with political parties demanding its return to India, accounts of historians establish that the majestic stone was forcibly taken away by the British and was never gifted by Duleep Singh

    Kohinoor's Tragic Tale From Lahore To Buckingham Palace