Monday, June 3, 2024
ADVT 
National

'Road Zipper' To Bring Rush-hour Relief For Alex Fraser Bridge Commuters

Darpan News Desk, 13 Dec, 2019 10:27 PM

    Unique to Western Canada, a moveable barrier system with a zipper truck is about to make its debut on the Alex Fraser Bridge to make this key crossing safer and faster for commuters.


    This innovative type of counterflow improves capacity on the bridge and eliminates potential for cross-over collisions during counterflow, as traffic is continually separated by barriers. The system is in the testing phase and expected to be in place for drivers sometime in mid-December 2019.


    “The Alex Fraser Bridge project shows how we are working closely with our partners to build the modern transportation infrastructure needed to keep people safe and support long-term economic growth,” said Catherine McKenna, federal Minister of Infrastructure and Communities. “Together, we are helping communities make positive changes to improve people’s lives, keep our businesses competitive and reduce carbon emissions for our children and grandchildren.”


    Ravi Kahlon, MLA for Delta-North, on behalf of Claire Trevena, B.C.’s Minister of Transportation and Infrastructure, hosted a preview of the zipper truck in action near the weigh scale at Nordel Way on Dec. 12, 2019.


    “I’m thrilled to welcome the zipper system to the Alex Fraser Bridge, which will create an additional lane during peak times and keep drivers protected by barriers,” said Kahlon. “It will make a noticeable and positive difference for about 120,000 people who drive across the Alex Fraser Bridge every day, getting people to work and back home to their families more quickly and reliably.”


    The extra lane will be in place for northbound traffic every weekday from 4:30 a.m. to 11:30 a.m. to help ensure a more efficient and consistent travel time during the morning commute. Outside of these hours, the fourth lane will be open to ease congestion for southbound traffic.


    Upgrades for cyclists and pedestrians include new wayfinding signs, better access via the Cliveden Avenue interchange, widening narrow sections of sidewalk on the bridge and improving the Cliveden and Nordel pathways.


    Previously completed work includes:


    strengthening the bridge to accommodate the additional weight of another lane of traffic (repairing the main span deck, modifying expansion joints and stiffening girders);


    creating a seventh lane to the bridge by removing the shoulders and reconfiguring the pre-existing six lanes from 3.7 metres to 3.55 metres wide;


    adding additional lanes southbound on Highway 91 between Nordel Way and 72nd Avenue; and


    upgrading the Cliveden Avenue and Nordel Way interchanges, including a new signal for traffic accessing the Alex Fraser Bridge northbound from Nordel Way.


    The South of Fraser Advance Traveller Information System portion of the project is ongoing and expected to be finished in spring 2020.

    Thirteen new dynamic message signs are being installed that will predict the estimated travel time on four major Fraser River crossings — Alex Fraser Bridge, Port Mann Bridge, Pattullo Bridge and the George Massey Tunnel. Signs allowing drivers to choose their best route will be located along Highway 17, Highway 1, Highway 10, Marine Way and Knight Street.


    Quick Facts:


    To help keep travellers safe and traffic flowing efficiently as part of the counterflow operations, the speed limit on the Alex Fraser Bridge has been permanently lowered from 90 km/h to 70 km/h.


    The $70-million Alex Fraser Bridge capacity-improvement project is funded by the Government of Canada (more than $32.7 million) and the Province of B.C. (more than $37.3 million).

    MORE National ARTICLES

    BC Government Tells ICBC To Delay 2020 Insurance Rate Application Until February

    In December 2018, ICBC announced that it was asking for a 6.3% increase to basic insurance rates. The British Columbia Utilities Commission (BCUC) gave their approval in January 2019.  

    BC Government Tells ICBC To Delay 2020 Insurance Rate Application Until February

    New DriveBC Webcams Help Travellers ‘Know Before They Go’

    People can better prepare for their travels thanks to the 30 new cameras and 71 more views added to the DriveBC webcam network in 2019.    

    New DriveBC Webcams Help Travellers ‘Know Before They Go’

    Social Media Claims Not Reported: Abbotsford Police

    Social Media Claims Not Reported: Abbotsford Police
    Over the past two weeks, the Abbotsford Police has observed social media posts that may cause alarm in our community.  These posts include that there have been attempted abductions, a sex ring group operating in Abbotsford, and strangers attempting to get into citizen-occupied vehicles.  

    Social Media Claims Not Reported: Abbotsford Police

    VIDEO: Two Suspects Arrested After Allegedly Assaulting Nine Kelowna Secondary Students And Ramming Their Vehicle

    Kelowna RCMP have arrested two individuals following an alleged assault with a weapon committed in East Kelowna on Tuesday.    

    VIDEO: Two Suspects Arrested After Allegedly Assaulting Nine Kelowna Secondary Students And Ramming Their Vehicle

    40th Annual Polar Bear Swim: Celebrate 40 Years Of Absurdity At The Polar Bear Swim On January 1 At Boundary Bay!

    40th Annual Polar Bear Swim: Celebrate 40 Years Of Absurdity At The Polar Bear Swim On January 1 At Boundary Bay!
    Costumes, mascots, and the ice cold shores of Boundary Bay; these are the things people get excited about on January 1, and have been for 40 years.    

    40th Annual Polar Bear Swim: Celebrate 40 Years Of Absurdity At The Polar Bear Swim On January 1 At Boundary Bay!

    Prolific Offender Arrested on 11 Outstanding Warrants After Following Through Fare Gates

    A man who decided to follow another passenger through the fare gates, without tapping his own fare media, obviously didn’t consider the repercussions of his actions.

    Prolific Offender Arrested on 11 Outstanding Warrants After Following Through Fare Gates