Thursday, July 2, 2026
ADVT 
National

Saskatchewan's Boundary dam carbon capture project underperforms, report says

Darpan News Desk The Canadian Press, 02 May, 2024 01:13 PM
  • Saskatchewan's Boundary dam carbon capture project underperforms, report says

"We don't think carbon capture works as well as industry and promoters claim," said David Schissel, an analyst who wrote the report for the Institute for Energy Economics and Financial Analysis, an international non-profit agency.

"We don't think it's a good use of money to keep coal-fired power plants running."

Schissel looked at data from Sask Power's Boundary Dam project, a coal-fired power plant in southeast Saskatchewan that began capturing carbon dioxide emissions in the fall of 2014. 

Proponents originally said the plant would capture up to 90 per cent of the plant's carbon emissions. That would amount to about a million tonnes of climate-changing carbon dioxide a year — the rough equivalent of emissions from 200,000 cars.   

That goal has never been reached, said Schissel. 

When all the plant's emissions are factored in, including flue gas that is simply vented, the average capture rate is 57 per cent, he said.

A 2022 report delivered to an international conference on carbon capture backs up the findings. 

"(The project) has not sustained the design rate beyond a dedicated capacity demonstration completed in 2015," says the report from the International CCS Knowledge Centre in Regina. 

The report says capture is limited by both technical issues and the demand for carbon dioxide from the energy industry, which uses the gas to extract more oil from depleting reserves. 

The plant's capture rate has improved, although it's still short of the million-tonne mark.  

Knowledge Centre spokesman Grady Semmens said Schissel's analysis is "generally correct."

He said the plant has managed to keep nearly six million tonnes of carbon dioxide out of the atmosphere. As well, he said almost all the CO2 from the emissions that are sent through the capture facility is separated out.

"For a variety of technical and economic reasons ... the (Boundary Dam) facility has not been run at full capacity, which has impacted the overall volume of CO2 captured over the last 10 years," Semmens wrote in an email. "This does not mean the project has not been successful.

"It has provided valuable experience and lessons that we are now actively applying to the next generation of CCS projects."

SaskPower spokesman Scott McGregor said the facility continues to improve. He said the equipment was online for almost the entire first three months of 2024 — its best performance yet.

"The knowledge we’ve gained at our (carbon capture) facility has also made SaskPower a resource for development of (such) projects in a wide range of industries outside of power generation, such as cement manufacturing, oil and gas production and chemical processing," he said in an email.

But Schissel said to live up to advocates' promises, carbon capture has to work nearly perfectly all the time. 

"If you're going to try to reduce greenhouse gas emissions by capturing CO2, you've got to capture almost all the emissions and you've got to do it year in and year out for decades."

"Carbon capture hasn't done what its proponents claimed it would do."

Other carbon capture projects have yet to reach their stated goals.

Since 2015, Shell's Quest project near Edmonton has stored nine million tonnes of CO2 at a lower-than-anticipated cost. But its capture rate of 77 per cent remains below the 90 per cent originally announced.

On Wednesday, Capital Power CEO Avik Dey said the company would no longer pursue its $2.4-billion carbon capture project at its Genesee power plant.

"Fundamentally, the economics just don't work," he told analysts in a conference call. "Hopefully, the technology will improve, and we can revisit this when the economics improve.

"What it really is, is the technology improving so the costs come down. How do you actually build the kit so you have higher efficacy and capture rates while bringing down the capture costs?"

Alberta's oilsands producers have estimated the cost of the first phase of carbon capture for the industry at $16 billion. 

Schissel said carbon capture can be worthwhile in some circumstances, especially at a smaller scale. He said it remains questionable if the technology can work at the level proponents suggest and asks whether it's the most cost-effective way to reduce emissions at large operations.

"We may find out in 20 years that we didn't capture as much CO2 as we needed to and we wasted a lot of money that could have been better spent."

MORE National ARTICLES

High speed chase on Surrey's Hwy 99

High speed chase on Surrey's Hwy 99
Police say it started just after nine last night when the driver of the C-L-S-550 fled the traffic stop, and the vehicle was located a short time later on Highway 99 south of the Serpentine River overpass. The investigation closed the highway for hours, but traffic is now moving again.   

High speed chase on Surrey's Hwy 99

Zelenskyy declares NATO summit victory for Ukraine as Canada, allies pledge more help

Zelenskyy declares NATO summit victory for Ukraine as Canada, allies pledge more help
As Prime Minister Justin Trudeau and other NATO leaders wrapped up their two-day summit Wednesday, they bid farewell to a very different version of Volodymyr Zelenskyy than the one they had met the day before. Ukraine's president declared the meetings a success, even though he left without the thing he had most vehemently argued for: a quick invitation for his country to join the alliance.

Zelenskyy declares NATO summit victory for Ukraine as Canada, allies pledge more help

More evacuations, alerts, reflect difficult wildfire season in B.C., Yukon

More evacuations, alerts, reflect difficult wildfire season in B.C., Yukon
At least 12 new evacuation orders or alerts have been issued over the last day in British Columbia as lightning storms and drought conditions add to the challenge of fighting hundreds of wildfires. The BC Wildfire Service says just over two-thirds of the province's roughly 330 fires are raging in those two centres.

More evacuations, alerts, reflect difficult wildfire season in B.C., Yukon

U.S. hiker dies after falling from popular B.C. hiking trail near Whistler

U.S. hiker dies after falling from popular B.C. hiking trail near Whistler
Sea to Sky officers as well as RCMP Air Services, BC Ambulance paramedics and Whistler Search and Rescue responded to a report that a woman had fallen off the Black Tusk chimney portion of Garibaldi Provincial Park on Monday and was seriously injured.  

U.S. hiker dies after falling from popular B.C. hiking trail near Whistler

B.C. port strike could end pending approval of terms set by federal mediator

B.C. port strike could end pending approval of terms set by federal mediator
Labour Minister Seamus O'Regan has given a federal mediator 24 hours to send him recommendations to end the dispute between the BC Maritime Employers Association and the International Longshore and Warehouse Union Canada. O'Regan will forward the recommendations to the two sides and says they'll have a further 24 hours to decide whether to ratify them.  

B.C. port strike could end pending approval of terms set by federal mediator

BOC raises interest rate to 5 percent

BOC raises interest rate to 5 percent
The central bank says it raised the rate because of elevated demand in the economy and strong underlying inflation pressures. It is now suggesting it will take longer -- until the middle of 2025 -- to get inflation back to the two per cent target.   

BOC raises interest rate to 5 percent