Saskatchewan's Boundary dam carbon capture project underperforms, report says

Darpan News Desk The Canadian Press, 02 May, 2024 01:13 PM
  • Saskatchewan's Boundary dam carbon capture project underperforms, report says

"We don't think carbon capture works as well as industry and promoters claim," said David Schissel, an analyst who wrote the report for the Institute for Energy Economics and Financial Analysis, an international non-profit agency.

"We don't think it's a good use of money to keep coal-fired power plants running."

Schissel looked at data from Sask Power's Boundary Dam project, a coal-fired power plant in southeast Saskatchewan that began capturing carbon dioxide emissions in the fall of 2014. 

Proponents originally said the plant would capture up to 90 per cent of the plant's carbon emissions. That would amount to about a million tonnes of climate-changing carbon dioxide a year — the rough equivalent of emissions from 200,000 cars.   

That goal has never been reached, said Schissel. 

When all the plant's emissions are factored in, including flue gas that is simply vented, the average capture rate is 57 per cent, he said.

A 2022 report delivered to an international conference on carbon capture backs up the findings. 

"(The project) has not sustained the design rate beyond a dedicated capacity demonstration completed in 2015," says the report from the International CCS Knowledge Centre in Regina. 

The report says capture is limited by both technical issues and the demand for carbon dioxide from the energy industry, which uses the gas to extract more oil from depleting reserves. 

The plant's capture rate has improved, although it's still short of the million-tonne mark.  

Knowledge Centre spokesman Grady Semmens said Schissel's analysis is "generally correct."

He said the plant has managed to keep nearly six million tonnes of carbon dioxide out of the atmosphere. As well, he said almost all the CO2 from the emissions that are sent through the capture facility is separated out.

"For a variety of technical and economic reasons ... the (Boundary Dam) facility has not been run at full capacity, which has impacted the overall volume of CO2 captured over the last 10 years," Semmens wrote in an email. "This does not mean the project has not been successful.

"It has provided valuable experience and lessons that we are now actively applying to the next generation of CCS projects."

SaskPower spokesman Scott McGregor said the facility continues to improve. He said the equipment was online for almost the entire first three months of 2024 — its best performance yet.

"The knowledge we’ve gained at our (carbon capture) facility has also made SaskPower a resource for development of (such) projects in a wide range of industries outside of power generation, such as cement manufacturing, oil and gas production and chemical processing," he said in an email.

But Schissel said to live up to advocates' promises, carbon capture has to work nearly perfectly all the time. 

"If you're going to try to reduce greenhouse gas emissions by capturing CO2, you've got to capture almost all the emissions and you've got to do it year in and year out for decades."

"Carbon capture hasn't done what its proponents claimed it would do."

Other carbon capture projects have yet to reach their stated goals.

Since 2015, Shell's Quest project near Edmonton has stored nine million tonnes of CO2 at a lower-than-anticipated cost. But its capture rate of 77 per cent remains below the 90 per cent originally announced.

On Wednesday, Capital Power CEO Avik Dey said the company would no longer pursue its $2.4-billion carbon capture project at its Genesee power plant.

"Fundamentally, the economics just don't work," he told analysts in a conference call. "Hopefully, the technology will improve, and we can revisit this when the economics improve.

"What it really is, is the technology improving so the costs come down. How do you actually build the kit so you have higher efficacy and capture rates while bringing down the capture costs?"

Alberta's oilsands producers have estimated the cost of the first phase of carbon capture for the industry at $16 billion. 

Schissel said carbon capture can be worthwhile in some circumstances, especially at a smaller scale. He said it remains questionable if the technology can work at the level proponents suggest and asks whether it's the most cost-effective way to reduce emissions at large operations.

"We may find out in 20 years that we didn't capture as much CO2 as we needed to and we wasted a lot of money that could have been better spent."

MORE National ARTICLES

Vehicle fire in Downtown Eastside

Vehicle fire in Downtown Eastside
One person was left with burns on their hands after a vehicle fire in Vancouver's Downtown Eastside. Officials say there was heavy fire coming from the vehicle when crews arrived just before 10 a-m at Powell Street and Gore Avenue.

Vehicle fire in Downtown Eastside

Passenger levels at YVR to hit pre-pandemic levels in the coming week

Passenger levels at YVR to hit pre-pandemic levels in the coming week
Passenger levels at Vancouver International Airport are expected to be almost completely recovered to pre-pandemic levels over the next week. Y-V-R officials say the airport is expecting an average of 60-thousand-177 passengers per day this week, with a total reaching 421-thousand.

Passenger levels at YVR to hit pre-pandemic levels in the coming week

Man steals over 1M from 9 investors

Man steals over 1M from 9 investors
A North Vancouver man has pleaded guilty to one count of theft after an investigation found he stole more than one-million-dollars from nine investors. A statement from B-C Securities Commission says the 55-year-old man was arrested in October 2022 and remains on bail, entering the guilty plea last week with sentencing scheduled for early May.

Man steals over 1M from 9 investors

108-year-old newspaper buyout in Prince George

108-year-old newspaper buyout in Prince George
Cameron Stolz is the new owner of the 108-year-old Prince George Citizen after buying the paper from Glacier Media. Stolz, a businessman who owns a toy and comics store, said he entered talks to buy the weekly newspaper last November after outlets in Fort St. John and Dawson Creek closed, followed soon after by the newspaper in Kamloops.

108-year-old newspaper buyout in Prince George

B.C. minister Robinson stepping down over remarks that angered pro-Palestinian groups

B.C. minister Robinson stepping down over remarks that angered pro-Palestinian groups
British Columbia's Post-Secondary Education Minister Selina Robinson is stepping down over her remarks that modern Israel was founded on "a crappy piece of land," after her repeated apologies failed to quell the outcry from pro-Palestinian groups and others. Premier David Eby said Robinson's "belittling" remarks were incompatible with her remaining in cabinet, although she will stay in the NDP caucus.

B.C. minister Robinson stepping down over remarks that angered pro-Palestinian groups

Surrey afternoon shooting lands 1 in hospital

Surrey afternoon shooting lands 1 in hospital
On Friday, just after 1:30pm, Surrey RCMP received a report of shots fired in the 8400 block of 120 Street.  Frontline officers attended the scene and located a man who appeared to be suffering from gunshot wounds. The victim was transported to hospital with serious injuries.

Surrey afternoon shooting lands 1 in hospital