Saturday, December 20, 2025
ADVT 
National

Structural problems force second evacuation of B.C. highrise in less than four years

Darpan News Desk The Canadian Press, 25 Apr, 2023 10:03 AM
  • Structural problems force second evacuation of B.C. highrise in less than four years

A highrise apartment building on Vancouver Island has been evacuated for the second time since 2019 because of structural defects.

The City of Langford revoked the occupancy permit for the 11 storey, 90 unit, RidgeView Place on Monday after an independent engineer found structural safety issues and recommended evacuation.

The building was first known as Danbrook One when it was completed almost four years ago, but seismic, foundation and other concerns forced owner Centurion Apartment Properties to clear the building just days before Christmas in 2019.

An investigation determined the structural engineer was not qualified for that type of concrete construction and the building was repaired and renamed RidgeView Place before the suites were rented again last year.

A statement from the City of Langford says it would not have issued the 2022 occupancy permit if it had known that documents from the remediation engineer could not be considered an assurance of compliance with the building code.

The Association of Professional Engineers and Geoscientists of BC says there are ongoing potential life-safety risks in RidgeView Place, and a notice from Centurion says rental contracts have been ended and it offers to work with residents to find other accommodations.

The statement from Centurion says it is too early to know when renters can return.

"The option of temporary shoring of the garage area is currently being reviewed with the engineers to provide residents safe access to come back and retrieve their belongings," says the notice to residents.

Centurion has offered $1,000 to the leaseholder of each affected unit in what the statement says is a "gesture of compassionate assistance."

Occupants of the suites will also be reimbursed for rent paid between April 24 -30.

A discipline notice from Engineers and Geoscientists BC issued last year, said the building's original structural engineer admitted to "incompetence and unprofessional conduct" related to the design and construction of the building. 

Brian McLure was banned from practising engineering in B.C. or using the title "engineer" or "professional engineer," but if he meets several requirements, he can apply for reinstatement as early as next year, the notice said.

The Nanaimo resident also agreed to pay a fine of $25,000 and an additional $32,000 toward the legal costs of the professional organization.

MORE National ARTICLES

PM stayed in $6k London suite for royal funeral

PM stayed in $6k London suite for royal funeral
The stay at the Corinthia London hotel became the subject of public debate last fall when media honed in on the details of the $400,000 trip, after obtaining documents through access-to-information requests.

PM stayed in $6k London suite for royal funeral

Kamloops nation gets $12.5M for healing centre

Kamloops nation gets $12.5M for healing centre
Indigenous Services Minister Patty Hajdu told a crowd in Kamloops, B.C., that the nation has led the way in opening the eyes of the country to the truths that were always known to Indigenous Peoples.

Kamloops nation gets $12.5M for healing centre

B.C. boosts funding to train more veterinarians

B.C. boosts funding to train more veterinarians
The college has been training B.C.'s veterinarians for five decades, and she said the multi-year funding boost will give students "certainty," while addressing the need to train and retain vets in communities essential to B.C.'s food security.

B.C. boosts funding to train more veterinarians

Minister stands by B.C. salmon farm closures

Minister stands by B.C. salmon farm closures
A statement from the office of Fisheries Minister Joyce Murray says her decision last month against renewing the licences for the farms off Vancouver Island near Campbell River was difficult but necessary.

Minister stands by B.C. salmon farm closures

B.C. LNG facility maps plan to early net zero

B.C. LNG facility maps plan to early net zero
Woodfibre LNG says in a statement it plans to meet net-zero emissions by the time operations start at the south coast export facility in 2027. Company president Christine Kennedy says emission reduction opportunities are a priority for the project as it implements a strategy that will result in the world's first net-zero facility.    

B.C. LNG facility maps plan to early net zero

Surrey shooting victim's identity revealed, search for suspect vehicle continues

Surrey shooting victim's identity revealed, search for suspect vehicle continues
Police say they responded to reports of shots fired just before 8 p.m. that day and found Smith's body. Investigators say Smith and his family had only recently moved to the city. IHIT says in a news release that the suspect left the area in a white Penske Ford Transit rental van shortly after the shooting.  

Surrey shooting victim's identity revealed, search for suspect vehicle continues