Thursday, December 18, 2025
ADVT 
National

Surrey’s Grandview Heights Aquatic Centre honoured for design excellence

Darpan News Desk, 14 Apr, 2016 03:11 PM

    Surrey’s new Grandview Heights Aquatic Centre has received top honours for innovation and technical excellence.  The Lieutenant Governor's Award for Engineering Excellence was presented to Fast + Epp for the structural design of the Grandview Heights Aquatic Centre in Surrey. The ambitious and daring project involved designing the roof to resemble a gently undulating and metaphorically appropriate wave form.

    “This recognition highlights the efforts we place in having unique and innovative architectural design in our new civic facilities,” said Mayor Linda Hepner. “With the record numbers of users at Grandview Heights Aquatic Centre, the facility is already a winner with our residents and families.  Now with this award, I am proud to say that our newest aquatic facility has achieved our goal of both form and function.”

    The prestigious award was presented at the annual Awards for Engineering Excellence Gala which honours the innovation and technical excellence of Association of Consulting Engineering Companies British Columbia (ACEC-BC) member firms. 

    The $55-million Grandview Heights Aquatic Centre was constructed using a highly unusual structural system – a novel hanging timber catenary roof suspended between concrete buttresses and free-spanning 55 metres. Rather than employ conventional steel roof trusses, glue-laminated timber ‘cables’ were introduced, reducing the effective structural depth by 90 per cent. This served to reduce building volumes and energy costs, sequester carbon, and provide the community with an architecturally striking and functionally efficient recreational environment. 

    The Grandview Heights Aquatic Centre is equipped with a 10-lane, 50-metre pool; universal change rooms and a 9,000-square-foot fitness area. More information about the aquatic centre can be found here.

    MORE National ARTICLES

    Parents Of Autistic Kids Demand Ontario Not Cut Five-year-old Kids Off Wait List

    TORONTO — Dozens of parents of children with autism are at the Ontario legislature today demanding the government reverse a decision to defund intensive therapy for children five and older.

    Parents Of Autistic Kids Demand Ontario Not Cut Five-year-old Kids Off Wait List

    Final Cost Of 2015 Alberta Election Almost $19m: Chief Electoral Officer

    Final Cost Of 2015 Alberta Election Almost $19m: Chief Electoral Officer
    He said costs went up due in part to Alberta's 10 per cent population increase and because then-premier Jim Prentice decided to drop the writ a year early.

    Final Cost Of 2015 Alberta Election Almost $19m: Chief Electoral Officer

    Calgary City Council Appoints Ethics And Integrity Advisers

    Calgary city council has appointed an integrity commissioner as well as an ethics adviser.

    Calgary City Council Appoints Ethics And Integrity Advisers

    Crown To Cross-examine Father Charged In Child's Meningitis Death

    Crown To Cross-examine Father Charged In Child's Meningitis Death
    David Stephan, 32, and his wife Collet, 35, are charged with failing to provide the necessaries of life for their son Ezekiel in March 2012.

    Crown To Cross-examine Father Charged In Child's Meningitis Death

    Charities Directorate Flags Suspected Terrorist Financing Cases For Senators

    Charities Directorate Flags Suspected Terrorist Financing Cases For Senators
    The audit materials provided to the committee should give senators a sense of the complexity of the revenue agency's work, said Cathy Hawara, director general of the charities directorate.

    Charities Directorate Flags Suspected Terrorist Financing Cases For Senators

    IMF Cuts Canada's Growth Estimates For 2016, 2017 As Part Of Global Trend

      The IMF is now projecting Canada's economy to grow by 1.5 per cent this year and by 1.9 per cent next year.

    IMF Cuts Canada's Growth Estimates For 2016, 2017 As Part Of Global Trend