Wednesday, February 11, 2026
ADVT 
National

Surrey’s Grandview Heights Aquatic Centre honoured for design excellence

Darpan News Desk, 14 Apr, 2016 03:11 PM

    Surrey’s new Grandview Heights Aquatic Centre has received top honours for innovation and technical excellence.  The Lieutenant Governor's Award for Engineering Excellence was presented to Fast + Epp for the structural design of the Grandview Heights Aquatic Centre in Surrey. The ambitious and daring project involved designing the roof to resemble a gently undulating and metaphorically appropriate wave form.

    “This recognition highlights the efforts we place in having unique and innovative architectural design in our new civic facilities,” said Mayor Linda Hepner. “With the record numbers of users at Grandview Heights Aquatic Centre, the facility is already a winner with our residents and families.  Now with this award, I am proud to say that our newest aquatic facility has achieved our goal of both form and function.”

    The prestigious award was presented at the annual Awards for Engineering Excellence Gala which honours the innovation and technical excellence of Association of Consulting Engineering Companies British Columbia (ACEC-BC) member firms. 

    The $55-million Grandview Heights Aquatic Centre was constructed using a highly unusual structural system – a novel hanging timber catenary roof suspended between concrete buttresses and free-spanning 55 metres. Rather than employ conventional steel roof trusses, glue-laminated timber ‘cables’ were introduced, reducing the effective structural depth by 90 per cent. This served to reduce building volumes and energy costs, sequester carbon, and provide the community with an architecturally striking and functionally efficient recreational environment. 

    The Grandview Heights Aquatic Centre is equipped with a 10-lane, 50-metre pool; universal change rooms and a 9,000-square-foot fitness area. More information about the aquatic centre can be found here.

    MORE National ARTICLES

    Ontario Kids With Autism Aged 5 And Older Cut Off Of Government-Paid Therapy

    Ontario Kids With Autism Aged 5 And Older Cut Off Of Government-Paid Therapy
    The Liberal government has announced a new Ontario Autism Program with $333 million in funding, but changes include limiting Intensive Behavioural Intervention to children between two and four.

    Ontario Kids With Autism Aged 5 And Older Cut Off Of Government-Paid Therapy

    Manitoba Election: Tory Ad Warning Of Tax Hike Goes Under The Microscope

    Manitoba Election: Tory Ad Warning Of Tax Hike Goes Under The Microscope
    In the lead-up to the April 19 Manitoba election, The Canadian Press is running a series of stories called Ad-Curracy, in which we look at the facts behind claims made in political advertisements.

    Manitoba Election: Tory Ad Warning Of Tax Hike Goes Under The Microscope

    Gordon Stuckless Apologizes In Court For Harm Caused To His Victims

    Gordon Stuckless was instructed to face away from the handful of victims present in a Toronto courtroom where he read his statement during a sentencing hearing on Tuesday.

    Gordon Stuckless Apologizes In Court For Harm Caused To His Victims

    India's Fastest Train Gatimaan Express Reaches Agra From Delhi In 99 Minutes

    India's Fastest Train Gatimaan Express Reaches Agra From Delhi In 99 Minutes
    India's fastest train, Gatimaan Express, reached the Taj Mahal city from New Delhi on Tuesday in 99 minutes

    India's Fastest Train Gatimaan Express Reaches Agra From Delhi In 99 Minutes

    B.C.'s Nurses' Union Reaches Tentative Five-year Deal, With Details To Come

    B.C.'s Nurses' Union Reaches Tentative Five-year Deal, With Details To Come
    Health Minister Terry Lake says the deal covers 42,000 nurses and is in line with a government mandate, which offers employees a wage bonus if economic growth is one per cent above forecast.

    B.C.'s Nurses' Union Reaches Tentative Five-year Deal, With Details To Come

    B.C. New Democrats Urge Federal Environmental Body To Withhold LNG Approval

    NDP Leader John Horgan says in a letter to the Canadian Environmental Assessment Agency the proposed Pacific NorthWest LNG project does not meet First Nations and environmental approval conditions.

    B.C. New Democrats Urge Federal Environmental Body To Withhold LNG Approval