Monday, May 20, 2024
ADVT 
National

Teck signs renewable power deal for Chilean mine

Darpan News Desk The Canadian Press, 17 Sep, 2020 05:18 PM
  • Teck signs renewable power deal for Chilean mine

Mining company Teck Resources Ltd. says it is making another step on its vow to be carbon emission neutral by 2050 by signing a long-term renewable power purchase agreement for its Carmen de Andacollo copper mine in Chile.

Under the agreement, the mine will source 72 megawatts (550 gigawatt-hours per year) from AES Gener’s renewable portfolio of wind, solar and hydroelectric energy.

The Vancouver mining company says the transition from fossil fuel power sources will eliminate about 200,000 tonnes of greenhouse gas emissions annually, equal to removing over 40,000 passenger vehicles from the road.

AES Gener, owned by the AES Corp., is also to be the supplier of renewable power for Teck's Quebrada Blanca Phase 2 copper mining project currently under construction, providing more than half of its total operating power needs when completed.

Teck has set a goal of achieving 100 per cent renewable power in Chile and reducing the carbon intensity of all of its operations by 33 per cent by 2030.

The Carmen de Andacollo (CdA) renewable power deal is in effect as of Sept. 1 and is to run through to the end of 2031. The mine is about 350 kilometres north of Santiago.

"Teck is tackling the global challenge of climate change by reducing the carbon footprint of our operations and working towards our goal of becoming carbon neutral," said Teck CEO Don Lindsay.

"This agreement takes Teck a step closer to achieving our sustainability goals, while also ensuring a reliable, long-term clean power supply for CdA at a reduced cost to Teck."

MORE National ARTICLES

Continued confidence in Surrey’s residential building sector

Continued confidence in Surrey’s residential building sector
Projects of note include several apartment towers ranging from 26 to 49-storeys, three dedicated rental apartment buildings, and a live/work residential townhome project.

Continued confidence in Surrey’s residential building sector

No plans to cut military spending: Sajjan

No plans to cut military spending: Sajjan
The fears are based on past feel: the Canadian Armed Forces was previously hit by deep cuts when Ottawa struggled to balance the books in both the 1990s and early 2010s.

No plans to cut military spending: Sajjan

Kenney remains hopeful for cross-Canada oil pipeline

Kenney remains hopeful for cross-Canada oil pipeline
Jason Kenney said Tuesday that the proposed cross-Canada oil pipeline isn't being considered because the federal Liberal government helped to kill it in 2017.

Kenney remains hopeful for cross-Canada oil pipeline

U.S. stands down on aluminum tariff dispute

U.S. stands down on aluminum tariff dispute
The news came as Deputy Prime Minister Chrystia Freeland and International Trade Minister Mary Ng prepared to unveil a list of U.S. aluminum products and manufactured goods Canada had singled out for reciprocal treatment later Tuesday.

U.S. stands down on aluminum tariff dispute

Leslyn Lewis to run for Conservatives in Ontario

Leslyn Lewis to run for Conservatives in Ontario
Finley announced in August that she won't run in the next election and she has given Lewis her support.

Leslyn Lewis to run for Conservatives in Ontario

Rock-Solid Continuing Education Options Through Ashton College, Deliver Quick, Focused Learning

Rock-Solid Continuing Education Options Through Ashton College, Deliver Quick, Focused Learning
The continuing education courses allow individuals to explore a new career path, advance their existing knowledge or prepare for a life-changing exam. 

Rock-Solid Continuing Education Options Through Ashton College, Deliver Quick, Focused Learning