Monday, February 16, 2026
ADVT 
National

Transportation Safety Board investigating after plane goes off runway in Vancouver

Darpan News Desk The Canadian Press, 19 Nov, 2024 11:44 AM
  • Transportation Safety Board investigating after plane goes off runway in Vancouver

Air traffic control audio shows a Boeing 767 cargo jet reported a "flight control problem" involving a mechanism on its wings used to slow the aircraft just before it skidded off a runway at Vancouver's airport at high speed. 

Conversations between the pilots on the Amazon Prime Air jet and air traffic control reveal that the plane was experiencing a problem with its "leading edge slats," and was carrying about 10,000 kilograms of fuel. 

In other recordings the tower tells awaiting emergency responders that the jet was "coming in fast," while data from the Flightradar24 database shows the plane was travelling at a ground speed of about 200 km/h when it left the runway. 

The Transportation Safety Board said it's investigating after the flight went off the end of the north runway at about 1:45 a.m. on Tuesday.

None of the three-person crew was hurt, but the airport said the north runway will remain closed for about two days as the jet sits in a grass field, nose down, with engines on each of the mud-splattered wings touching the ground.

Vancouver airport CEO Tamara Vrooman says there was "no risk" at any point of the plane breaching the runway's "secure" perimeter, which separates it from the McArthurGlen Designer Outlet shopping mall and its parking lot.

Vrooman says that all flights originally scheduled for the day were moved to the south runway, and only about 5 per cent of flights experienced any disruptions due to the move.

Flightradar24, a global flight tracking database, says the plane operated by Cargojet Airways left Hamilton, Ont., just after midnight eastern time and its flight path shows it continued 500 metres past the end of the runway in Vancouver before coming to a stop.

The audio recordings of air traffic control in Vancouver show the crew reported problems with the plane's control systems about 20 minutes before landing, with one crew member requesting time to run a checklist to try to resolve the issue.

An air traffic controller said they wanted to keep the plane "close to the airport," while the crew tried to find a solution, but control also asked if emergency responders should be ready. 

"Yeah, we can bring out the fire trucks just for precaution," a crew member told air traffic control.

The crew also confirmed to air traffic control that it had no dangerous cargo on-board, other than the fuel. 

According to the U.S. National Aeronautics and Space Administration's Beginner's Guide to Aeronautics, slats and flaps on an aircraft's wings are deployed to both slow a plane for landing as well as generate lift.

At the time the jet slid off the runway, Environment Canada's weather station at the airport showed light rain and snow had been falling for about 90 minutes.

The safety board's website says runway overruns can damage planes and, in the worst cases, lead to injuries or deaths.

The board says the consequences can be particularly serious when there isn't enough room at the end of a runway or a suitable system to stop planes.

"This closure will have an impact on YVR operations and flight schedules, but aircraft continue to arrive and depart on our south runway," the airport said in an updated statement Tuesday. 

"We encourage passengers to check with their airlines for current flight schedules and status before heading to YVR."

Vrooman did not offer a specific timeline for the removal of the jet, but she said that cargo would be removed before crews build some sort of roadway through the grassy area where the plane came to a stop in order to pull it out of its current location. 

 

MORE National ARTICLES

Ottawa says U.S. move to tighten border rules for asylum seekers in line with law

Ottawa says U.S. move to tighten border rules for asylum seekers in line with law
Immigration, Refugees and Citizenship Canada spokesperson Matthew Krupovich said the changes "do not impact the terms of the (agreement) nor the criteria for an exemption or exception under the agreement."

Ottawa says U.S. move to tighten border rules for asylum seekers in line with law

2 people injured in rock climbing incident

2 people injured in rock climbing incident
B-C Emergency Health Services say two people were taken to hospital by helicopter from a rock climbing area in Squamish yesterday.  Brain Twaites, public information officer with the B-C E-H-S says the agency received a call before 1 p.m. about people in need of medical assistance in the Squamish region. 

2 people injured in rock climbing incident

Man dies in Whalley

Man dies in Whalley
Surrey R-C-M-P are asking witnesses to contact them after a man died in the Whalley neighbourhood Wednesday night.  The R-C-M-P says officers received a call from B-C Emergency Health Services at 6:40 p.m. on Wednesday and they located an unresponsive man who had fallen while lleaving a transit bus.

Man dies in Whalley

The costs of a Metro Vancouver SkyTrain extension jump by $1.9B and it's a year late

The costs of a Metro Vancouver SkyTrain extension jump by $1.9B and it's a year late
The total cost of building the Surrey-Langley SkyTrain extension in Metro Vancouver has soared by $2 billion and the project has been delayed for a year. The Transportation Ministry says in a statement the budget of the 16-kilometre extension of the SkyTrain into Langley is now estimated at $5.996 billion, up from the original $4 billion projected. 

The costs of a Metro Vancouver SkyTrain extension jump by $1.9B and it's a year late

Cause of Vancouver fire unknown

Cause of Vancouver fire unknown
Officials say they'll never know the cause of a massive fire earlier this summer that started a warehouse and then burned a wooden trestle in Metro Vancouver. The fire sent black smoke billowing across the region, prompting an air quality advisory and the temporary closure of a bridge between Vancouver and Richmond.

Cause of Vancouver fire unknown

Bloc leader says he is shocked by millions in 'juicy' bonuses awarded to CBC execs

Bloc leader says he is shocked by millions in 'juicy' bonuses awarded to CBC execs
The $18.4 million CBC/Radio-Canada awarded in bonuses to its employees this year is shocking, Bloc Québécois Leader Yves-François Blanchet said. He also said bonuses at the public broadcaster aren't justified because a government-owned corporation doesn't face competition like in the private sector. 

Bloc leader says he is shocked by millions in 'juicy' bonuses awarded to CBC execs