Tuesday, February 17, 2026
ADVT 
National

Transportation Safety Board investigating after plane goes off runway in Vancouver

Darpan News Desk The Canadian Press, 19 Nov, 2024 11:44 AM
  • Transportation Safety Board investigating after plane goes off runway in Vancouver

Air traffic control audio shows a Boeing 767 cargo jet reported a "flight control problem" involving a mechanism on its wings used to slow the aircraft just before it skidded off a runway at Vancouver's airport at high speed. 

Conversations between the pilots on the Amazon Prime Air jet and air traffic control reveal that the plane was experiencing a problem with its "leading edge slats," and was carrying about 10,000 kilograms of fuel. 

In other recordings the tower tells awaiting emergency responders that the jet was "coming in fast," while data from the Flightradar24 database shows the plane was travelling at a ground speed of about 200 km/h when it left the runway. 

The Transportation Safety Board said it's investigating after the flight went off the end of the north runway at about 1:45 a.m. on Tuesday.

None of the three-person crew was hurt, but the airport said the north runway will remain closed for about two days as the jet sits in a grass field, nose down, with engines on each of the mud-splattered wings touching the ground.

Vancouver airport CEO Tamara Vrooman says there was "no risk" at any point of the plane breaching the runway's "secure" perimeter, which separates it from the McArthurGlen Designer Outlet shopping mall and its parking lot.

Vrooman says that all flights originally scheduled for the day were moved to the south runway, and only about 5 per cent of flights experienced any disruptions due to the move.

Flightradar24, a global flight tracking database, says the plane operated by Cargojet Airways left Hamilton, Ont., just after midnight eastern time and its flight path shows it continued 500 metres past the end of the runway in Vancouver before coming to a stop.

The audio recordings of air traffic control in Vancouver show the crew reported problems with the plane's control systems about 20 minutes before landing, with one crew member requesting time to run a checklist to try to resolve the issue.

An air traffic controller said they wanted to keep the plane "close to the airport," while the crew tried to find a solution, but control also asked if emergency responders should be ready. 

"Yeah, we can bring out the fire trucks just for precaution," a crew member told air traffic control.

The crew also confirmed to air traffic control that it had no dangerous cargo on-board, other than the fuel. 

According to the U.S. National Aeronautics and Space Administration's Beginner's Guide to Aeronautics, slats and flaps on an aircraft's wings are deployed to both slow a plane for landing as well as generate lift.

At the time the jet slid off the runway, Environment Canada's weather station at the airport showed light rain and snow had been falling for about 90 minutes.

The safety board's website says runway overruns can damage planes and, in the worst cases, lead to injuries or deaths.

The board says the consequences can be particularly serious when there isn't enough room at the end of a runway or a suitable system to stop planes.

"This closure will have an impact on YVR operations and flight schedules, but aircraft continue to arrive and depart on our south runway," the airport said in an updated statement Tuesday. 

"We encourage passengers to check with their airlines for current flight schedules and status before heading to YVR."

Vrooman did not offer a specific timeline for the removal of the jet, but she said that cargo would be removed before crews build some sort of roadway through the grassy area where the plane came to a stop in order to pull it out of its current location. 

 

MORE National ARTICLES

B.C. to provide more funding for new medical school, founding dean appointed

B.C. to provide more funding for new medical school, founding dean appointed
Eby says $33.7 million will go toward the renovation of an interim space at an existing building on Simon Fraser's Surrey campus, as well as at leased space to accommodate classrooms, laboratories and offices.

B.C. to provide more funding for new medical school, founding dean appointed

Residents of Merritt told to conserve water as city well has 'major failure'

Residents of Merritt told to conserve water as city well has 'major failure'
There has been a "major failure" in a well in Merritt prompting the city to ask its residents to stop all non-essential water use. The city says in a statement that the failure is in the Voght well and affects the city's water distribution system. 

Residents of Merritt told to conserve water as city well has 'major failure'

Trudeau attends NATO leaders' summit as Russia escalates aggression toward Ukraine

Trudeau attends NATO leaders' summit as Russia escalates aggression toward Ukraine
The ongoing war will top the agenda of the three-day summit following Russian missile attacks Monday that left death and destruction, including at a large children's hospital in Kyiv.

Trudeau attends NATO leaders' summit as Russia escalates aggression toward Ukraine

4 charged in Guildford robbery

4 charged in Guildford robbery
Mounties in Surrey says four people have now been charged after a robbery at a jewellery store in Guildford earlier this year. They say police responded after shots were fired at the store on February 18th, leaving one person with non-life threatening injuries. 

4 charged in Guildford robbery

Daily heat records tumble in B.C., temperatures in southern Interior to remain high

Daily heat records tumble in B.C., temperatures in southern Interior to remain high
A summary from Environment Canada shows 25 daily high temperature records were set and two tied across the province Monday, from Whistler, to Trail in the southeast, Smithers in the northwest, and Campbell River on Vancouver Island. The Lytton area was a hot spot with a daily high of 42.4 C, breaking the old record of 39.4 set in 1952.

Daily heat records tumble in B.C., temperatures in southern Interior to remain high

Pro-Palestinian protesters dismantle UBC camp

Pro-Palestinian protesters dismantle UBC camp
A pro-Palestinian protest camp that had occupied a sports field at the University of British Columbia's Vancouver campus for more than two months has been dismantled by the demonstrators. Dozens of tents had been removed by Monday, although barricades and fencing around the site remain in place.

Pro-Palestinian protesters dismantle UBC camp