Thursday, July 9, 2026
ADVT 
National

TSB releasing report on wildfire in Lytton, B.C.

Darpan News Desk The Canadian Press, 13 Oct, 2021 12:11 PM
  • TSB releasing report on wildfire in Lytton, B.C.

RICHMOND, B.C. - The Transportation Safety Board will release the results of its investigation into the possibility that a freight train might have started a wildfire that destroyed the community of Lytton, B.C.

The board says it will hold a news conference Thursday after the publication of its report with the results of the investigation.

The fire raced through the town on June 30, days after a record-setting heat at the end of June.

Two people were killed and few buildings were left standing after the fire.

The Insurance Bureau of Canada estimated the wildfire caused about $78 million in insured damage.

The safety board said days after the fire that it sent rail investigators to the scene after receiving information about its possible cause from the RCMP and BC Wildfire Service.

A proposed class-action lawsuit filed in B.C. Supreme Court in August alleges the Canadian Pacific and Canadian National railways caused or contributed to the wildfire, although neither company has filed a statement of defence in the case.

None of the allegations have been tested in court.

CN issued a statement on July 6 saying it had investigated video footage posted on social media suggesting a train had caused the Lytton fire.

"After examining the evidence, CN has concluded the video does not show a train in or near Lytton at the time of the fire in the village. In fact, the video shows a train 45 kilometres south of Lytton, and the smoke seen in the video comes from a different fire that was already burning."

Canadian Pacific has declined to comment on the civil claim, but has noted previous statements saying the fire remains under investigation and any conclusions or speculation about its cause or contributing factors are premature.

The company said in July that it inspected all CP trains that travelled through Lytton during the relevant time period on June 30 and based on its review, which included video footage, it found "nothing to indicate that any of CP's trains or equipment that passed through Lytton caused or contributed to the fire."

 

MORE National ARTICLES

A 4-Lane Pattullo Bridge & An 8-Lane Massey Tunnel - WATCH Transportation and Infrastructure Minister Claire Trevana’s Interview

Darpan Magazine sat down with the Hon. Minister of Transportation and Infrastructure Claire Trevena on what the future of transportation looks like

A 4-Lane Pattullo Bridge & An 8-Lane Massey Tunnel - WATCH Transportation and Infrastructure Minister Claire Trevana’s Interview

B.C. Patients Served More Local Food Than Ever Before

Provincial health-care facilities are working hard to serve patients and residents more local food, supporting farmers, fishers, ranchers and processors, and connecting more people with food from B.C. communities.

B.C. Patients Served More Local Food Than Ever Before

Inuit Concerned About Potential Spread Of COVID-19 In North

The group says the Inuit must be considered in government responses because of the potential compounding threat to basic health and well-being in those communities.

Inuit Concerned About Potential Spread Of COVID-19 In North

Morneau Says Ottawa Will Announce Support For Those Quarantined Due To COVID-19

TORONTO - The federal government is preparing to undertake measures designed to protect Canadians and the country’s economy from the outbreak of a novel form of coronavirus.

Morneau Says Ottawa Will Announce Support For Those Quarantined Due To COVID-19

Tim Hortons Temporarily Stops Accepting Reusable Cups Amid COVID-19 Concerns

TORONTO - Tim Hortons says it will temporarily stop accepting reusable cups brought in by customers amid concerns about the novel coronavirus outbreak.    

Tim Hortons Temporarily Stops Accepting Reusable Cups Amid COVID-19 Concerns

Montreal-Area Commuter Rail Service To Resume After Dismantling Of Blockade

Commuter rail operator Exo says the first train is scheduled to leave the Candiac station south of Montreal at 3:55 p.m.

Montreal-Area Commuter Rail Service To Resume After Dismantling Of Blockade