Monday, July 6, 2026
ADVT 
National

Twinning Some Nova Scotia Highways Could Cost At Least $2 Billion: Feasibility Study

Darpan News Desk The Canadian Press, 14 Jul, 2016 12:54 PM
    HALIFAX — A feasibility study estimates it would cost Nova Scotia taxpayers more than $2 billion in initial construction costs to twin 300 kilometres of highway across the province.
     
    The first phase of a study released today by Halifax-based engineering firm CBCL Ltd. ranks the feasibility of twinning each of eight sections of 100-series highways identified by the province.
     
    The rankings are based on criteria such as safety, costs versus the projected revenues from tolls, and traffic volumes.
     
    A section of Highway 103 between Tantallon and Bridgewater is top of the list, followed by a section of Highway 101 from Windsor running west.
     
    The study used benchmark toll amounts of six to 10 cents per kilometre based on the results of a "willingness to pay" study.
     
    Transportation Minister Geoff MacLellan says no decision has been made to move forward with twinning based on tolls.
     
    He says that will come through consultation with the public and further data from CBCL in the final phase of its study.

    MORE National ARTICLES

    Group trying to stop 2nd Saskatoon hotel from holding hunting safari trade show

    Group trying to stop 2nd Saskatoon hotel from holding hunting safari trade show
    Last month, the Saskatoon Inn pulled out of a show by African Events Canada after receiving an online petition signed by thousands of people.

    Group trying to stop 2nd Saskatoon hotel from holding hunting safari trade show

    At Least 2,250 Veterans Are Homeless, According To Groundbreaking Analysis

    The figures come from a database which tracks 60 emergency shelters across the country.

    At Least 2,250 Veterans Are Homeless, According To Groundbreaking Analysis

    Shooting, Wild Chase Through Surrey Ends With Crash, Three Arrests In Delta

    Shooting, Wild Chase Through Surrey Ends With Crash, Three Arrests In Delta
    Mounties say a gun was seized from the car, the trio is known to them and charges are expected, but an investigation continues

    Shooting, Wild Chase Through Surrey Ends With Crash, Three Arrests In Delta

    Advisers Urge Justin Trudeau To Be Innovative In Era Of Dramatic Change

    OTTAWA — Federal advisers have told Justin Trudeau he must adopt more innovative approaches to successfully govern in the modern era.

    Advisers Urge Justin Trudeau To Be Innovative In Era Of Dramatic Change

    The Tie That Binds: Mother Of Missing Manitoba Man Starts Awareness Campaign

    The Tie That Binds: Mother Of Missing Manitoba Man Starts Awareness Campaign
    Colten Pratt, who is 26, has been missing since November 2014 and Lydia Daniels has spent the last year trying to find him.

    The Tie That Binds: Mother Of Missing Manitoba Man Starts Awareness Campaign

    Ice Jams Prompt Flooding Concerns For Homeowners Near Smithers, B.C.

    Ice Jams Prompt Flooding Concerns For Homeowners Near Smithers, B.C.
    Regional District of Bulkley-Nechako chairman Bill Miller says ice has backed up along the Bulkley River, causing water to rise and seep into basements and crawl spaces of some nearby homes.

    Ice Jams Prompt Flooding Concerns For Homeowners Near Smithers, B.C.