Wednesday, June 3, 2026
ADVT 
India

Maha: Metro Line 7A underground tunnel breakthrough successfully completed

Darpan News Desk IANS, 17 Apr, 2025 12:03 PM
  • Maha: Metro Line 7A underground tunnel breakthrough successfully completed

Mumbai, April 17 (IANS) The breakthrough of the 1.65-kilometre underground tunnel on Mumbai Metro Line 7A, from Chhatrapati Shivaji Maharaj International Airport (T2) to Andheri East, was successfully completed on Thursday in the presence of Chief Minister Devendra Fadnavis.

The tunnel is being constructed by the Mumbai Metropolitan Region Development Authority (MMRDA).

The Chief Minister reviewed detailed information about the project from officials and initiated the breakthrough by pressing the button. He later inspected the work on-site. This particular tunnel is located on the downline of Metro Line 7A, between the Chhatrapati Shivaji Maharaj International Airport station and the Airport Colony station.

This metro link is a crucial segment of the Mumbai metropolitan area's expanding metro network. With this line, Mira-Bhayander and further up to Vasai-Virar will be connected to the international airport. Eventually, the Thane and Navi Mumbai International Airports will also be linked via metro. Currently, 59 per cent of the total work on Metro Line 7A has been completed.

According to the MMRDA, Metro Line 7A stretches over 3.4 kilometres, 0.94 km is elevated, and 2.5 km is underground. The line will have two stations: one elevated at Airport Colony and the other underground at the Chhatrapati Shivaji Maharaj International Airport. Out of the total length, 0.57 km is elevated, while the twin tunnels are 2.035 km long.

The first tunnel drive for the downline began on September 1, 2023. The 1.65-km tunnel includes 1,180 pre-cast rings used for lining, each ring specially designed and divided into six parts, with a tunnel diameter of 6.35 meters.

In September 2023, the Tunnel Boring Machine (TBM) was lowered 30 meters underground.

Despite multiple engineering challenges, passing under Metro Line 3, the Sahar Elevated Road, major sewer and water pipelines, the breakthrough was completed successfully. This new line will allow passengers to travel comfortably from Colaba to Vasai-Virar and Mira-Bhayander. It will also provide seamless integration with other metro lines in the city, including Metro Line 3 (Colaba-Bandra-SEEPZ), which connects to the underground airport station.

The blend of elevated and underground alignments ensures minimal land usage in densely populated airport zones, enabling a smoother metro construction process.

MORE India ARTICLES

A few incidents cannot derail India-US ties, says PM Modi on Pannun case

A few incidents cannot derail India-US ties, says PM Modi on Pannun case
In his first public response to allegations of an Indian national conspiring to murder a Khalistani separatist in New York, Prime Minister Narendra Modi said the issue will be examined, but a few incidents cannot derail ties between India and the US. He underlined that security and counter-terrorism cooperation has been a key component of the ties between India and the US.  

A few incidents cannot derail India-US ties, says PM Modi on Pannun case

Delhi: Man arrested for duping over 900 families of missing persons

Delhi: Man arrested for duping over 900 families of missing persons
A 28-year-old man was arrested for duping over 900 families of the missing persons after downloading information from the ZIPNet (Zonal Integrated Police Network) and other such government websites, a Delhi Police official said on Wednesday. The accused was identified as Shyamsunder Chauhan, a resident of Ranipur Mau, Uttar Pradesh and a Bachelor of Computer Applications (BCA) graduate from Indore.  

Delhi: Man arrested for duping over 900 families of missing persons

21 cases of new Covid variant JN. 1 reported across country

21 cases of new Covid variant JN. 1 reported across country
The Union Health Ministry on Wednesday said that 21 cases of the new variant JN.1 have been reported from across the country. The source said that 19 cases of the new coronavirus variant has been reported from Goa while one each from Maharashtra and Kerala.  

21 cases of new Covid variant JN. 1 reported across country

IGIA set to unveil India’s first multi-modal interstate transport hub

IGIA set to unveil India’s first multi-modal interstate transport hub
According to officials, the hub will be well-connected with an Interstate Bus Terminus (ISBT), the upcoming phase-four line of the Delhi Metro Rail Corporation (DMRC), the proposed Passenger Transport Centre (PTC) and the proposed Rapid Rail Transit System (RRTS) station, including the station for Automated Passenger Mover (APM) near the GMR Aerocity.

IGIA set to unveil India’s first multi-modal interstate transport hub

India, Pakistan abuzz over health status of Dawood; if he was ‘poisoned, critical’

India, Pakistan abuzz over health status of Dawood; if he was ‘poisoned, critical’
The prime cases for which India wants him include the March 12, 1993 Mumbai serial blasts -- ranked the worst-ever terror strike in India -- which claimed 267 people, much higher than the 166 who were killed in the terror attacks of November 26, 2008, that hit the country's commercial capital.

India, Pakistan abuzz over health status of Dawood; if he was ‘poisoned, critical’

Modi’s ‘guarantee vehicle’ is super hit: PM

Modi’s ‘guarantee vehicle’ is super hit: PM
Prime Minister Narendra Modi on Monday said that Modi's 'guarantee vehicle' has become a superhit. Addressing an event here, Modi said the vehicle has evoked tremendous response from the people and it has been assured that the country will become developed by 2047.  

Modi’s ‘guarantee vehicle’ is super hit: PM