Wednesday, June 3, 2026
ADVT 
India

Maha: Metro Line 7A underground tunnel breakthrough successfully completed

Darpan News Desk IANS, 17 Apr, 2025 12:03 PM
  • Maha: Metro Line 7A underground tunnel breakthrough successfully completed

Mumbai, April 17 (IANS) The breakthrough of the 1.65-kilometre underground tunnel on Mumbai Metro Line 7A, from Chhatrapati Shivaji Maharaj International Airport (T2) to Andheri East, was successfully completed on Thursday in the presence of Chief Minister Devendra Fadnavis.

The tunnel is being constructed by the Mumbai Metropolitan Region Development Authority (MMRDA).

The Chief Minister reviewed detailed information about the project from officials and initiated the breakthrough by pressing the button. He later inspected the work on-site. This particular tunnel is located on the downline of Metro Line 7A, between the Chhatrapati Shivaji Maharaj International Airport station and the Airport Colony station.

This metro link is a crucial segment of the Mumbai metropolitan area's expanding metro network. With this line, Mira-Bhayander and further up to Vasai-Virar will be connected to the international airport. Eventually, the Thane and Navi Mumbai International Airports will also be linked via metro. Currently, 59 per cent of the total work on Metro Line 7A has been completed.

According to the MMRDA, Metro Line 7A stretches over 3.4 kilometres, 0.94 km is elevated, and 2.5 km is underground. The line will have two stations: one elevated at Airport Colony and the other underground at the Chhatrapati Shivaji Maharaj International Airport. Out of the total length, 0.57 km is elevated, while the twin tunnels are 2.035 km long.

The first tunnel drive for the downline began on September 1, 2023. The 1.65-km tunnel includes 1,180 pre-cast rings used for lining, each ring specially designed and divided into six parts, with a tunnel diameter of 6.35 meters.

In September 2023, the Tunnel Boring Machine (TBM) was lowered 30 meters underground.

Despite multiple engineering challenges, passing under Metro Line 3, the Sahar Elevated Road, major sewer and water pipelines, the breakthrough was completed successfully. This new line will allow passengers to travel comfortably from Colaba to Vasai-Virar and Mira-Bhayander. It will also provide seamless integration with other metro lines in the city, including Metro Line 3 (Colaba-Bandra-SEEPZ), which connects to the underground airport station.

The blend of elevated and underground alignments ensures minimal land usage in densely populated airport zones, enabling a smoother metro construction process.

MORE India ARTICLES

Eight years after sacrilege, Sukhbir Badal apologises for failing to arrest culprits

Eight years after sacrilege, Sukhbir Badal apologises for failing to arrest culprits
Eight years after the sacrilege of Guru Granth Sahib during the helm of the Shiromani Akali Dal-BJP government in Punjab, Akali Dal President Sukhbir Badal on Thursday unconditionally sought forgiveness of the Khalsa Panth (community) for failing to arrest the culprits. Speaking at the 103rd foundation day of the Shiromani Akali Dal (SAD) with folded hands, Badal expressed his regrets.

Eight years after sacrilege, Sukhbir Badal apologises for failing to arrest culprits

Lawrence Bishnoi-Goldy Brar gang sharpshooter nabbed after encounter, involved in firing at ex-MLA's Delhi house

Lawrence Bishnoi-Goldy Brar gang sharpshooter nabbed after encounter, involved in firing at ex-MLA's Delhi house
The accused was identified as Sombir a.k.a Totala, 23, a resident of Haryana's Sonipat. Last week, two sharpshooters of the gang were arrested for firing seven to eight rounds in front of the residence of the ex-MLA. According to a Crime Branch officer, the sharpshooters were identified as Aakash a.k.a Kassa (23) and Nitesh alias Sinti (19), both residents of Haryana.  

Lawrence Bishnoi-Goldy Brar gang sharpshooter nabbed after encounter, involved in firing at ex-MLA's Delhi house

CBI chargesheets 7 for exporting gold jewellery from India under guise of fake exhibition

CBI chargesheets 7 for exporting gold jewellery from India under guise of fake exhibition
The Central Bureau of Investigation on Thursday filed a chargesheet against seven accused including a Delhi based private company and its director, the then superintendent of customs and private persons for exporting gold jewellery from India under the guise of a fake exhibition organized by a UAE based firm. 

CBI chargesheets 7 for exporting gold jewellery from India under guise of fake exhibition

Out of 678 winning candidates in 5 states, 253 have criminal cases; maximum 114 from Congress

Out of 678 winning candidates in 5 states, 253 have criminal cases; maximum 114 from Congress
Out of 678 winning candidates analysed from the five states of Rajasthan, Telangana, Madhya Pradesh, Chhattisgarh and Mizoram that went to the polls recently, 253 have declared criminal cases against themselves in their affidavits, with the maximum from the Congress which has 114 winning members facing criminal cases, a report said on Thursday. The report also revealed that in Telangana 69 per cent of the winning candidates have criminal cases against them.  

Out of 678 winning candidates in 5 states, 253 have criminal cases; maximum 114 from Congress

Parliament security breach: Accused Lalit Jha arrested

Parliament security breach: Accused Lalit Jha arrested
The fifth accused and alleged mastermind of the Parliament security breach incident, Lalit Jha, was arrested from the national capital on Thursday, police said. As per police sources, Jha had allegedly organised a clandestine meeting in Gurugram on Tuesday, a day before the incident.  

Parliament security breach: Accused Lalit Jha arrested

Agra Metro to generate power from third rail

Agra Metro to generate power from third rail
In a unique initiative, the Agra Metro is laying the third rail traction system that will generate power for the trains. The network will not have OHE (Overhead equipment) which often tends to trip whenever it comes in contact with some other projects. The third rail traction work has already completed in Agra Metro Rail Depot and on the elevated section.

Agra Metro to generate power from third rail