Sunday, June 7, 2026
ADVT 
India

Maha: Metro Line 7A underground tunnel breakthrough successfully completed

Darpan News Desk IANS, 17 Apr, 2025 12:03 PM
  • Maha: Metro Line 7A underground tunnel breakthrough successfully completed

Mumbai, April 17 (IANS) The breakthrough of the 1.65-kilometre underground tunnel on Mumbai Metro Line 7A, from Chhatrapati Shivaji Maharaj International Airport (T2) to Andheri East, was successfully completed on Thursday in the presence of Chief Minister Devendra Fadnavis.

The tunnel is being constructed by the Mumbai Metropolitan Region Development Authority (MMRDA).

The Chief Minister reviewed detailed information about the project from officials and initiated the breakthrough by pressing the button. He later inspected the work on-site. This particular tunnel is located on the downline of Metro Line 7A, between the Chhatrapati Shivaji Maharaj International Airport station and the Airport Colony station.

This metro link is a crucial segment of the Mumbai metropolitan area's expanding metro network. With this line, Mira-Bhayander and further up to Vasai-Virar will be connected to the international airport. Eventually, the Thane and Navi Mumbai International Airports will also be linked via metro. Currently, 59 per cent of the total work on Metro Line 7A has been completed.

According to the MMRDA, Metro Line 7A stretches over 3.4 kilometres, 0.94 km is elevated, and 2.5 km is underground. The line will have two stations: one elevated at Airport Colony and the other underground at the Chhatrapati Shivaji Maharaj International Airport. Out of the total length, 0.57 km is elevated, while the twin tunnels are 2.035 km long.

The first tunnel drive for the downline began on September 1, 2023. The 1.65-km tunnel includes 1,180 pre-cast rings used for lining, each ring specially designed and divided into six parts, with a tunnel diameter of 6.35 meters.

In September 2023, the Tunnel Boring Machine (TBM) was lowered 30 meters underground.

Despite multiple engineering challenges, passing under Metro Line 3, the Sahar Elevated Road, major sewer and water pipelines, the breakthrough was completed successfully. This new line will allow passengers to travel comfortably from Colaba to Vasai-Virar and Mira-Bhayander. It will also provide seamless integration with other metro lines in the city, including Metro Line 3 (Colaba-Bandra-SEEPZ), which connects to the underground airport station.

The blend of elevated and underground alignments ensures minimal land usage in densely populated airport zones, enabling a smoother metro construction process.

MORE India ARTICLES

Extremely heavy rains due to alignment of three weather systems: Climate scientists

Extremely heavy rains due to alignment of three weather systems: Climate scientists
Incessant rains have triggered flashfloods and landslides across Himachal Pradesh, while Delhi has recorded the highest rains in the last 40 years. Even most of the areas of Punjab have been witnessing flood-like situation in most of districts.

Extremely heavy rains due to alignment of three weather systems: Climate scientists

Deluge in Punjab, but CM busy in serving Delhi bosses: SAD

Deluge in Punjab, but CM busy in serving Delhi bosses: SAD
In a statement here, Majithia said Punjabis were shocked that the Chief Minister was engaged in celebrations and election tours of the neighbouring state of Haryana during the last few days instead of taking review meetings and making advance preparations to meet all eventualities.

Deluge in Punjab, but CM busy in serving Delhi bosses: SAD

3 arrested in Odisha train crash

3 arrested in Odisha train crash
India's federal crime agency has arrested three railway officials in connection with one of the country's deadliest train accidents that killed more than 290 people last month. The three men have been charged with culpable homicide without murder and destruction of evidence.  

3 arrested in Odisha train crash

PM Modi inaugurates various projects worth Rs 7,500 cr in poll-bound Chhattisgarh

PM Modi inaugurates various projects worth Rs 7,500 cr in poll-bound Chhattisgarh
Addressing an event in Raipur, Prime Minister Modi said that the projects will create new employment opportunities for the people of the region and pave way for the development of the state.

PM Modi inaugurates various projects worth Rs 7,500 cr in poll-bound Chhattisgarh

Punjab CM seeks hike in MGNREGA wage rate

Punjab CM seeks hike in MGNREGA wage rate
In a letter to Union Rural Development and Panchayati Raj Minister Giriraj Singh, the Chief Minister sought upward revision in the rates notified for labour under the scheme, claiming that the existing rates are too minuscule. He said lesser wage rate of Rs 303 has been notified for Punjab in comparison to Rs 357 for neighbouring Haryana.

Punjab CM seeks hike in MGNREGA wage rate

Excise policy case: ED attaches assets worth Rs 52 cr of Sisodia, his wife, others

Excise policy case: ED attaches assets worth Rs 52 cr of Sisodia, his wife, others
In a major move, the Enforcement Directorate said on Friday that it has attached assets worth Rs 52.24 crore belonging to arrested AAP leader Minister Manish Sisodia, his wife and some other accused persons in connection with the Delhi excise policy case. 

Excise policy case: ED attaches assets worth Rs 52 cr of Sisodia, his wife, others