Monday, June 8, 2026
ADVT 
India

Maha: Metro Line 7A underground tunnel breakthrough successfully completed

Darpan News Desk IANS, 17 Apr, 2025 12:03 PM
  • Maha: Metro Line 7A underground tunnel breakthrough successfully completed

Mumbai, April 17 (IANS) The breakthrough of the 1.65-kilometre underground tunnel on Mumbai Metro Line 7A, from Chhatrapati Shivaji Maharaj International Airport (T2) to Andheri East, was successfully completed on Thursday in the presence of Chief Minister Devendra Fadnavis.

The tunnel is being constructed by the Mumbai Metropolitan Region Development Authority (MMRDA).

The Chief Minister reviewed detailed information about the project from officials and initiated the breakthrough by pressing the button. He later inspected the work on-site. This particular tunnel is located on the downline of Metro Line 7A, between the Chhatrapati Shivaji Maharaj International Airport station and the Airport Colony station.

This metro link is a crucial segment of the Mumbai metropolitan area's expanding metro network. With this line, Mira-Bhayander and further up to Vasai-Virar will be connected to the international airport. Eventually, the Thane and Navi Mumbai International Airports will also be linked via metro. Currently, 59 per cent of the total work on Metro Line 7A has been completed.

According to the MMRDA, Metro Line 7A stretches over 3.4 kilometres, 0.94 km is elevated, and 2.5 km is underground. The line will have two stations: one elevated at Airport Colony and the other underground at the Chhatrapati Shivaji Maharaj International Airport. Out of the total length, 0.57 km is elevated, while the twin tunnels are 2.035 km long.

The first tunnel drive for the downline began on September 1, 2023. The 1.65-km tunnel includes 1,180 pre-cast rings used for lining, each ring specially designed and divided into six parts, with a tunnel diameter of 6.35 meters.

In September 2023, the Tunnel Boring Machine (TBM) was lowered 30 meters underground.

Despite multiple engineering challenges, passing under Metro Line 3, the Sahar Elevated Road, major sewer and water pipelines, the breakthrough was completed successfully. This new line will allow passengers to travel comfortably from Colaba to Vasai-Virar and Mira-Bhayander. It will also provide seamless integration with other metro lines in the city, including Metro Line 3 (Colaba-Bandra-SEEPZ), which connects to the underground airport station.

The blend of elevated and underground alignments ensures minimal land usage in densely populated airport zones, enabling a smoother metro construction process.

MORE India ARTICLES

Tomatoes worth Rs 3 lakh stolen from farm in Karnataka's Hassan

Tomatoes worth Rs 3 lakh stolen from farm in Karnataka's Hassan
Farmer Dharani aka Somashekar lodged a complaint with Halebeedu police in this regard. Police said that the thieves have taken away 90 boxes of tomatoes worth Rs 3 lakh - as the price of first quality tomato has crossed Rs 150 per kg.

Tomatoes worth Rs 3 lakh stolen from farm in Karnataka's Hassan

Modi meets ex-Japan PM Yoshihide Suga

Modi meets ex-Japan PM Yoshihide Suga
Suga is on a visit to India with a delegation of over 100 members comprising government officials, Keidanren (Japan Business Federation), and members of "Ganesha no Kai" group of Parliamentarians. Modi welcomed Suga on his maiden visit to India as the chairman of JIA. 

Modi meets ex-Japan PM Yoshihide Suga

Sisodia's supporters, AAP activists barred from entering courtroom: Delhi court

Sisodia's supporters, AAP activists barred from entering courtroom: Delhi court
The judge's decision was prompted by an incident on June 1 when the senior AAP leader claimed that he was manhandled by security personnel during a court appearance. The lockup in-charge at Rouse Avenue Courts has also been directed to promptly report any violation of these instructions to the court.

Sisodia's supporters, AAP activists barred from entering courtroom: Delhi court

Fake call centre busted in Gurugram, four arrested

Fake call centre busted in Gurugram, four arrested
The call centre mostly used to cheat foreign nationals on the pretext of technical support, the police said on Thursday. According to the police, a team of the cyber crime police station led by ACP (Cyber Crime) Vipin Ahlawat, raided the call centre which was located at house no 135, Sector-47 in Gurugram following a tip-off.

Fake call centre busted in Gurugram, four arrested

Ex-Punjab CM Channi summoned third time in disproportionate assets case

Ex-Punjab CM Channi summoned third time in disproportionate assets case
The Vigilance Bureau has been probing the assets of Channi, his brothers, family members and some of his associates for amassing wealth more than their declared sources of income. Earlier, Channi appeared before the investigating agency on June 14 and he was questioned for over five hours.

Ex-Punjab CM Channi summoned third time in disproportionate assets case

Punjab CM closes 10th toll plaza in state

Punjab CM closes 10th toll plaza in state
Interacting with the media after closing the Singhawala toll plaza, the Chief Minister said people had to pay a hefty amount of Rs 44.43 while crossing these 10 toll plazas. However, he said with the closing of the 10 toll plazas people will be immensely benefited and get a major relief.  

Punjab CM closes 10th toll plaza in state