Sunday, June 14, 2026
ADVT 
India

Maha: Metro Line 7A underground tunnel breakthrough successfully completed

Darpan News Desk IANS, 17 Apr, 2025 12:03 PM
  • Maha: Metro Line 7A underground tunnel breakthrough successfully completed

Mumbai, April 17 (IANS) The breakthrough of the 1.65-kilometre underground tunnel on Mumbai Metro Line 7A, from Chhatrapati Shivaji Maharaj International Airport (T2) to Andheri East, was successfully completed on Thursday in the presence of Chief Minister Devendra Fadnavis.

The tunnel is being constructed by the Mumbai Metropolitan Region Development Authority (MMRDA).

The Chief Minister reviewed detailed information about the project from officials and initiated the breakthrough by pressing the button. He later inspected the work on-site. This particular tunnel is located on the downline of Metro Line 7A, between the Chhatrapati Shivaji Maharaj International Airport station and the Airport Colony station.

This metro link is a crucial segment of the Mumbai metropolitan area's expanding metro network. With this line, Mira-Bhayander and further up to Vasai-Virar will be connected to the international airport. Eventually, the Thane and Navi Mumbai International Airports will also be linked via metro. Currently, 59 per cent of the total work on Metro Line 7A has been completed.

According to the MMRDA, Metro Line 7A stretches over 3.4 kilometres, 0.94 km is elevated, and 2.5 km is underground. The line will have two stations: one elevated at Airport Colony and the other underground at the Chhatrapati Shivaji Maharaj International Airport. Out of the total length, 0.57 km is elevated, while the twin tunnels are 2.035 km long.

The first tunnel drive for the downline began on September 1, 2023. The 1.65-km tunnel includes 1,180 pre-cast rings used for lining, each ring specially designed and divided into six parts, with a tunnel diameter of 6.35 meters.

In September 2023, the Tunnel Boring Machine (TBM) was lowered 30 meters underground.

Despite multiple engineering challenges, passing under Metro Line 3, the Sahar Elevated Road, major sewer and water pipelines, the breakthrough was completed successfully. This new line will allow passengers to travel comfortably from Colaba to Vasai-Virar and Mira-Bhayander. It will also provide seamless integration with other metro lines in the city, including Metro Line 3 (Colaba-Bandra-SEEPZ), which connects to the underground airport station.

The blend of elevated and underground alignments ensures minimal land usage in densely populated airport zones, enabling a smoother metro construction process.

MORE India ARTICLES

Two held for duping people through fake visas

Two held for duping people through fake visas
Deputy Commissioner of Police, IGI Airport, Tanu Sharma said a complaint was received from the IGI Airport Immigration Department that one passenger came to immigration counter seeking departure immigration to Abu Dhabi. During scrutiny of his travel documents, it was found that a Russian business visa affixed on his passport was fake with no security features.

Two held for duping people through fake visas

Punjab CM hands over cheque for Rs 1 crore to martyr's family

Punjab CM hands over cheque for Rs 1 crore to martyr's family
The Chief Minister said his government is always at hand to help and support the family. He said the countrymen would always remain indebted to Jawan Kuldeep Singh, who attained martyrdom to safeguard the security and sovereignty of the country.

Punjab CM hands over cheque for Rs 1 crore to martyr's family

Droupadi Murmu will make an outstanding President: PM

Droupadi Murmu will make an outstanding President: PM
In a series of tweets, the Prime Minister said: "India scripts history. At a time when 1.3 billion Indians are marking Azadi Ka Amrit Mahotsav, a daughter of India hailing from a tribal community born in a remote part of eastern India has been elected our President! Congratulations to Smt. Droupadi Murmu Ji on this feat."

Droupadi Murmu will make an outstanding President: PM

Broken mobile phone, ammunition & pharma opioids seized from Moosewala killers: Official

Broken mobile phone, ammunition & pharma opioids seized from Moosewala killers: Official
The shooters were hired by jailed gangster Lawrence Bishnoi, the main conspirator who confessed that the execution planning of Moosewala was hatched in August last year to avenge the murder of Vicky Middukhera.

Broken mobile phone, ammunition & pharma opioids seized from Moosewala killers: Official

60 pilots, 150 cabin crew failed breathalyzer test

60 pilots, 150 cabin crew failed breathalyzer test
The compliance of the action taken by the operator is verified during the next audit and surveillance. In case of any violations or non-compliance to regulations detected during audit and surveillance, enforcement action including financial penalty is imposed by the DGCA.

60 pilots, 150 cabin crew failed breathalyzer test

Delhi Police use water cannons to disperse protesting Cong workers

Delhi Police use water cannons to disperse protesting Cong workers
Former Union Minister P. Chidambaram said his party is protesting the ED summons to Sonia Gandhi. "The AJL-Young India transaction is recorded in the books of account, the returns filed by the two companies and in the Income Tax returns. All that the ED wants to know can be found in the records," he said.

Delhi Police use water cannons to disperse protesting Cong workers