Sunday, June 14, 2026
ADVT 
India

Maha: Metro Line 7A underground tunnel breakthrough successfully completed

Darpan News Desk IANS, 17 Apr, 2025 12:03 PM
  • Maha: Metro Line 7A underground tunnel breakthrough successfully completed

Mumbai, April 17 (IANS) The breakthrough of the 1.65-kilometre underground tunnel on Mumbai Metro Line 7A, from Chhatrapati Shivaji Maharaj International Airport (T2) to Andheri East, was successfully completed on Thursday in the presence of Chief Minister Devendra Fadnavis.

The tunnel is being constructed by the Mumbai Metropolitan Region Development Authority (MMRDA).

The Chief Minister reviewed detailed information about the project from officials and initiated the breakthrough by pressing the button. He later inspected the work on-site. This particular tunnel is located on the downline of Metro Line 7A, between the Chhatrapati Shivaji Maharaj International Airport station and the Airport Colony station.

This metro link is a crucial segment of the Mumbai metropolitan area's expanding metro network. With this line, Mira-Bhayander and further up to Vasai-Virar will be connected to the international airport. Eventually, the Thane and Navi Mumbai International Airports will also be linked via metro. Currently, 59 per cent of the total work on Metro Line 7A has been completed.

According to the MMRDA, Metro Line 7A stretches over 3.4 kilometres, 0.94 km is elevated, and 2.5 km is underground. The line will have two stations: one elevated at Airport Colony and the other underground at the Chhatrapati Shivaji Maharaj International Airport. Out of the total length, 0.57 km is elevated, while the twin tunnels are 2.035 km long.

The first tunnel drive for the downline began on September 1, 2023. The 1.65-km tunnel includes 1,180 pre-cast rings used for lining, each ring specially designed and divided into six parts, with a tunnel diameter of 6.35 meters.

In September 2023, the Tunnel Boring Machine (TBM) was lowered 30 meters underground.

Despite multiple engineering challenges, passing under Metro Line 3, the Sahar Elevated Road, major sewer and water pipelines, the breakthrough was completed successfully. This new line will allow passengers to travel comfortably from Colaba to Vasai-Virar and Mira-Bhayander. It will also provide seamless integration with other metro lines in the city, including Metro Line 3 (Colaba-Bandra-SEEPZ), which connects to the underground airport station.

The blend of elevated and underground alignments ensures minimal land usage in densely populated airport zones, enabling a smoother metro construction process.

MORE India ARTICLES

Committed to protecting interest of farmers: Punjab minister

Committed to protecting interest of farmers: Punjab minister
Presiding over a meeting here with representatives of the Bhartiya Kisan Union (Doaba) and the Sandhar Sugar Mill of Phagwara, the minister categorically directed the officers concerned to ensure that of the Rs 72 crore payment due (since the last three years) towards the farmers, Rs 22 crore must be realized soon and credited into the accounts of farmers by selling the property of the mill at Bhuna in Haryana.

Committed to protecting interest of farmers: Punjab minister

AAP MP donates entire salary for education of students

AAP MP donates entire salary for education of students
Padma Shri Sahney made this announcement before taking oath of office in Parliament. Before the oath, he took part in 'kirtan' and 'ardaas' organised at Gurdwara Rakab Ganj Sahib here. On the occasion, Sahney announced that he will donate all his and staff salary of his tenure for the education of economically weaker students.

AAP MP donates entire salary for education of students

Start construction of Delhi-Katra highway on fast-track: Punjab CM

Start construction of Delhi-Katra highway on fast-track: Punjab CM
Mann said the 254-km long Delhi-Katra highway will be constructed at a cost Rs 11,510 crore and will pass through nine districts of the state -- Jalandhar, Sangrur, Malerkotla, Patiala, Kapurthala, Ludhiana, Amritsar, Tarn Taran and Gurdaspur.

Start construction of Delhi-Katra highway on fast-track: Punjab CM

HC dismisses bail plea of Sidhu Moosewala's manager

HC dismisses bail plea of Sidhu Moosewala's manager
In a status report before Justice Anoop Chitkara's Bench, Deputy Superintendent of Police (DSP) Sukhnaaz Singh said in view of the facts and circumstances, it is evident that there is sufficient prima facie evidence on record which reveals that the petitioner is the main conspirator, who hatched conspiracy with Gaurav Patial (accused) for eliminating Middukhera.

HC dismisses bail plea of Sidhu Moosewala's manager

Dera Sacha Sauda chief claims his blood group changed from O+ to O-

Dera Sacha Sauda chief claims his blood group changed from O+ to O-
In January 2019, a special CBI court in Panchkula also sentenced Rahim and three others to life imprisonment for the murder of journalist Ram Chander Chhatrapati over 16 years ago. His conviction on August 25, 2017 had led to violence in Panchkula and Sirsa, leaving 41 people dead and over 260 injured.

Dera Sacha Sauda chief claims his blood group changed from O+ to O-

Man conceals gold in rectum, held at Lucknow airport

Man conceals gold in rectum, held at Lucknow airport
According to customs officials, "The gold was in the form of a paste which was wrapped in black tape in two packets. The total weight of the packets was 433 grams. After removing the tape and other impurities from gold, it weighs 397 grams."

Man conceals gold in rectum, held at Lucknow airport