BC Hydro says it should have been more proactive as Site C costs overflowed

Darpan News Desk The Canadian Press, 04 Nov, 2025 10:00 AM
  • BC Hydro says it should have been more proactive as Site C costs overflowed

British Columbia's power utility says it should have been more proactive about ballooning costs on the massive Site C hydroelectric dam project, partly blaming a failure to budget for "low-probability, high-consequence risks."

BC Hydro says in a "lessons learned report" to the British Columbia Utilities Commission that it's on track to complete the project on the Peace River within a $16 billion budget.

But that's almost double the original 2014 budget of about $8.8 billion, which was increased twice, in 2018 and 2021.

BC Hydro blames the huge overrun on the pandemic, as well as a failure to budget for low-probability risks that included substantial geotechnical problems.

The utility says it should have "ramped up its internal project resources more proactively and sooner."

Site C is the third hydro dam on the Peace River in northeastern B.C. and it provides enough electricity to power about 450,000 homes every year. 

The 224-page report, submitted last Thursday, says future projects should better communicate the "breadth" of risks with the potential for significant impacts on budget and scheduling.

An executive summary says that "consistent with industry best practices" the methodology of the project’s cost-risk analysis meant that unlikely risks were excluded from the original budget. 

"Accordingly, the project contingency and project reserve were both insufficient to absorb the full costs when these high-consequence, low-probability risk events materialized."

It says that while the pandemic was "unforeseen," the potential geotechnical challenges were understood.

Enhancing the dam's right bank foundation accounted for $1.1 billion of the overall budget increase, left bank cracks accounted for $600 million, and construction delays caused by the COVID-19 pandemic accounted for $1.6 billion.

Further costs increases were related to contractor claims, redesigns, and other factors, it says. 

However, the report also says the challenges that sent the budget soaring were met with "ingenuity and determination."

"Overall, BC Hydro reflects on the Site C Project with pride and a commitment to learn and improve," the summary says.

Picture Courtesy: THE CANADIAN PRESS/Jonathan Hayward

MORE National ARTICLES

Surrey’s $27.5M Bear Creek Stadium officially opens

Surrey’s $27.5M Bear Creek Stadium officially opens
The $27.5 Bear Creek Stadium was designed with accessibility and adaptability in mind, featuring extra wide passageways, accessible public washrooms, universal change rooms with accessible showers, and an elevator to bring spectators and sport officials to the upper levels of the grandstand. 

Surrey’s $27.5M Bear Creek Stadium officially opens

Transit Police arrest man with loaded gun at SkyTrain Station

Transit Police arrest man with loaded gun at SkyTrain Station
Just after 2:00 p.m., on Sunday, July 6, 2025, Transit Police officers were checking fares within the Fare Paid Zone at Main Street–Science World SkyTrain Station, when they asked a passenger to produce proof of payment for inspection. As a result, multiple outstanding warrants were discovered, as well as a loaded Glock 23 handgun, ammunition, and what were believed to be controlled substances, in his possession.

Transit Police arrest man with loaded gun at SkyTrain Station

Anand visiting Malaysia, Japan as Carney crafts approach to Indo-Pacific strategy

Anand visiting Malaysia, Japan as Carney crafts approach to Indo-Pacific strategy
Anand will meet with her Japanese counterpart in Tokyo this week as the two finalize an agreement on sharing defence information and boosting trade.

Anand visiting Malaysia, Japan as Carney crafts approach to Indo-Pacific strategy

Scientists map recovery for endangered orcas off British Columbia's coast

Scientists map recovery for endangered orcas off British Columbia's coast
There is an "urgent need for more robust actions" to save the southern resident killer whales from extinction, says the report released by the David Suzuki Foundation and Raincoast Conservation Foundation on Monday.

Scientists map recovery for endangered orcas off British Columbia's coast

Fire that triggered evacuations and shut Kelowna, B.C., airport brought under control

Fire that triggered evacuations and shut Kelowna, B.C., airport brought under control
Police began telling residents to get out on Sunday afternoon and later that night the Regional District of Central Okanagan ordered residents out of homes at seven addresses at risk from the Whelan Creek wildfire.

Fire that triggered evacuations and shut Kelowna, B.C., airport brought under control

All criminal trials in four B.C. courts to be rescheduled during FIFA World Cup

All criminal trials in four B.C. courts to be rescheduled during FIFA World Cup
Chief Justice Ron Skolrood says in a notice posted Monday that the tournament is expected to have "very significant impacts" on court operations at the affected Supreme Court locations. 

All criminal trials in four B.C. courts to be rescheduled during FIFA World Cup