BC Hydro says it should have been more proactive as Site C costs overflowed

Darpan News Desk The Canadian Press, 04 Nov, 2025 10:00 AM
  • BC Hydro says it should have been more proactive as Site C costs overflowed

British Columbia's power utility says it should have been more proactive about ballooning costs on the massive Site C hydroelectric dam project, partly blaming a failure to budget for "low-probability, high-consequence risks."

BC Hydro says in a "lessons learned report" to the British Columbia Utilities Commission that it's on track to complete the project on the Peace River within a $16 billion budget.

But that's almost double the original 2014 budget of about $8.8 billion, which was increased twice, in 2018 and 2021.

BC Hydro blames the huge overrun on the pandemic, as well as a failure to budget for low-probability risks that included substantial geotechnical problems.

The utility says it should have "ramped up its internal project resources more proactively and sooner."

Site C is the third hydro dam on the Peace River in northeastern B.C. and it provides enough electricity to power about 450,000 homes every year. 

The 224-page report, submitted last Thursday, says future projects should better communicate the "breadth" of risks with the potential for significant impacts on budget and scheduling.

An executive summary says that "consistent with industry best practices" the methodology of the project’s cost-risk analysis meant that unlikely risks were excluded from the original budget. 

"Accordingly, the project contingency and project reserve were both insufficient to absorb the full costs when these high-consequence, low-probability risk events materialized."

It says that while the pandemic was "unforeseen," the potential geotechnical challenges were understood.

Enhancing the dam's right bank foundation accounted for $1.1 billion of the overall budget increase, left bank cracks accounted for $600 million, and construction delays caused by the COVID-19 pandemic accounted for $1.6 billion.

Further costs increases were related to contractor claims, redesigns, and other factors, it says. 

However, the report also says the challenges that sent the budget soaring were met with "ingenuity and determination."

"Overall, BC Hydro reflects on the Site C Project with pride and a commitment to learn and improve," the summary says.

Picture Courtesy: THE CANADIAN PRESS/Jonathan Hayward

MORE National ARTICLES

'Motorcyclist's unfortunate decision' not the fault of Vancouver police: watchdog

'Motorcyclist's unfortunate decision' not the fault of Vancouver police: watchdog
B.C.'s police watchdog has cleared Vancouver officers in relation to the death of a motorcyclist that occurred shortly after a chase had stopped.  The Independent Investigations Office says police tried to conduct a traffic stop on Nov. 6 last year because a motorcycle didn't have a license plate. 

'Motorcyclist's unfortunate decision' not the fault of Vancouver police: watchdog

Multi-vehicle crash shuts Highway 99 south of Whistler

Multi-vehicle crash shuts Highway 99 south of Whistler
A multi-vehicle crash has shut down the Sea-to-Sky Highway in both directions on the way to Whistler. RCMP say poor weather is contributing to the road conditions and drivers are being asked to avoid the area. 10 have been injured and 2 are in critical condition. 

Multi-vehicle crash shuts Highway 99 south of Whistler

Ford talks to Carney, premiers ahead of trade meeting in Washington

Ford talks to Carney, premiers ahead of trade meeting in Washington
Ontario Premier Doug Ford was spending Wednesday meeting with Canada's incoming prime minister and speaking to his fellow premiers ahead of a trip Thursday to Washington, D.C., to talk trade with a top U.S. official.

Ford talks to Carney, premiers ahead of trade meeting in Washington

Canada calls for unity, pushes back on U.S. tariffs as G7 ministers gather in Quebec

Canada calls for unity, pushes back on U.S. tariffs as G7 ministers gather in Quebec
Foreign Affairs Minister Mélanie Joly is welcoming her counterparts from some of the world's most powerful countries to Quebec this week, as Ottawa works to maintain unity between Washington and its Group of Seven partners and pushes back on U.S. tariffs. The ministers are scheduled to have an early afternoon news conference on Friday.

Canada calls for unity, pushes back on U.S. tariffs as G7 ministers gather in Quebec

Fire at residential building in downtown Vancouver displaces dozens

Fire at residential building in downtown Vancouver displaces dozens
A fire at a high-rise building in downtown Vancouver has displaced 42 residents. Vancouver Fire and Rescue Services says crews were called to the building on Nelson Street on Tuesday and arrived to find flames coming from the building's seventh storey, extending into the eighth floor. 

Fire at residential building in downtown Vancouver displaces dozens

Carney transition team met with PMO staff Tuesday, hope for PM swearing in by Friday

Carney transition team met with PMO staff Tuesday, hope for PM swearing in by Friday
Liberal Leader Mark Carney is hoping to be sworn in as Canada's 24th prime minister by the end of the week but there are some logistical hurdles like security clearances for senior members of his transition team that must happen first. Carney won a landslide victory to take the helm of the Liberals from Justin Trudeau on Sunday night but he isn't yet the prime minister.

Carney transition team met with PMO staff Tuesday, hope for PM swearing in by Friday