BC Hydro says it should have been more proactive as Site C costs overflowed

Darpan News Desk The Canadian Press, 04 Nov, 2025 10:00 AM
  • BC Hydro says it should have been more proactive as Site C costs overflowed

British Columbia's power utility says it should have been more proactive about ballooning costs on the massive Site C hydroelectric dam project, partly blaming a failure to budget for "low-probability, high-consequence risks."

BC Hydro says in a "lessons learned report" to the British Columbia Utilities Commission that it's on track to complete the project on the Peace River within a $16 billion budget.

But that's almost double the original 2014 budget of about $8.8 billion, which was increased twice, in 2018 and 2021.

BC Hydro blames the huge overrun on the pandemic, as well as a failure to budget for low-probability risks that included substantial geotechnical problems.

The utility says it should have "ramped up its internal project resources more proactively and sooner."

Site C is the third hydro dam on the Peace River in northeastern B.C. and it provides enough electricity to power about 450,000 homes every year. 

The 224-page report, submitted last Thursday, says future projects should better communicate the "breadth" of risks with the potential for significant impacts on budget and scheduling.

An executive summary says that "consistent with industry best practices" the methodology of the project’s cost-risk analysis meant that unlikely risks were excluded from the original budget. 

"Accordingly, the project contingency and project reserve were both insufficient to absorb the full costs when these high-consequence, low-probability risk events materialized."

It says that while the pandemic was "unforeseen," the potential geotechnical challenges were understood.

Enhancing the dam's right bank foundation accounted for $1.1 billion of the overall budget increase, left bank cracks accounted for $600 million, and construction delays caused by the COVID-19 pandemic accounted for $1.6 billion.

Further costs increases were related to contractor claims, redesigns, and other factors, it says. 

However, the report also says the challenges that sent the budget soaring were met with "ingenuity and determination."

"Overall, BC Hydro reflects on the Site C Project with pride and a commitment to learn and improve," the summary says.

Picture Courtesy: THE CANADIAN PRESS/Jonathan Hayward

MORE National ARTICLES

Joly to meet with U.S. Secretary of State Rubio as tariff threat looms

Joly to meet with U.S. Secretary of State Rubio as tariff threat looms
Foreign Affairs Minister Mélanie Joly is back in Washington, D.C., Wednesday to meet with U.S. Secretary of State Marco Rubio as Canada faces the prospect of devastating tariffs landing as early as Saturday. Joly said Monday that she still believes diplomacy can fend off President Donald Trump's plan to hit Canada with 25 per cent across-the-board duties.

Joly to meet with U.S. Secretary of State Rubio as tariff threat looms

Calgary council approves Green Line, ending heated political battle with province

Calgary council approves Green Line, ending heated political battle with province
The City of Calgary is moving forward with a multi-billion-dollar transit project that was the centre of a months-long battle with the Alberta government. Council had hit pause on the $6.5-billion Green Line project after the province said last fall it wouldn't provide its share of the funding if the downtown section went underground.

Calgary council approves Green Line, ending heated political battle with province

Snowfall warnings for some of Northern BC

Snowfall warnings for some of Northern BC
A series of snowfall and winter storm warnings are covering parts of northern BC. Environment Canada says heavy snow was expected to continue in the Stewart area, north of Prince Rupert, until later today.

Snowfall warnings for some of Northern BC

Invictus Games 2025 medals unveiled in Vancouver

Invictus Games 2025 medals unveiled in Vancouver
Organizers of the 2025 Invictus Games, which kick off next weekend in Vancouver, have unveiled the medals that will be awarded to athletes over the nine days of competition. The charity says in a news release that the 462 medals were designed by four First Nations artists and will be presented at 167 ceremonies throughout the event.

Invictus Games 2025 medals unveiled in Vancouver

BoC cuts key rate by quarter point to 3% as tariffs threat looms

BoC cuts key rate by quarter point to 3% as tariffs threat looms
The Bank of Canada delivered another interest rate cut on Wednesday, reducing its policy rate by a quarter-percentage point to three per cent. But looming U.S. tariffs are weighing on the central bank’s economic outlook.

BoC cuts key rate by quarter point to 3% as tariffs threat looms

SPS charge man for allegedly ramming his way past a police cruiser

SPS charge man for allegedly ramming his way past a police cruiser
Surrey police have charged a 29-year-old man who is alleged to have tried to ram his way past a police cruiser.  It started when officers investigated a report of a suspicious vehicle in a parking lot on Friday.

SPS charge man for allegedly ramming his way past a police cruiser