Sunday, December 21, 2025
ADVT 
National

BC Hydro seeks baseload power boost from stable sources

Darpan News Desk The Canadian Press, 04 Jun, 2025 01:45 PM
  • BC Hydro seeks baseload power boost from stable sources

British Columbia's power utility has begun the process to boost the province's baseload electricity generation capacity in a bid to meet the province's growing demand from residents and industries.

Baseload capacity refers to constant and stable power sources and Energy Minister Adrian Dix said Wednesday that BC Hydro is requesting expressions of interest from companies to provide geothermal or hydroelectric projects to expand long-term power capacity and meet peak demand.

BC Hydro has also launched a second request seeking partners who can deliver "market-ready technologies" for boosting power conservation in homes and buildings across the province.

Dix said both requests are aimed at matching B.C.'s growth potential with stable and affordable electricity supply.

"It is so important to our system," Dix said at a news conference alongside BC Hydro chief executive Chris O'Riley. 

"(It is) important because it allows us to take on relatively low-cost, intermittent energy such as wind and solar, important because it's going to power our economy at a time we have never seen so much demand for electricity and so much potential for growth."

Dix said BC Hydro may explore as part of the request several types of projects including "pumped storage" hydro power generation, a system where water is pumped to an elevated reservoir during times of low electricity demand then released to generate power during peak periods.

The province did not specify how much baseload power generation it wants to add in the new request, and Dix said that was a specific decision because BC Hydro wanted to cast a wide net in terms of possible solutions it might adopt.

"There isn't a number," Dix said about the amount of electricity B.C. is looking for. "The reason for (the) expression of interest, the reason we have a short turnaround, is we want to see what's out there. 

"We believe that BC Hydro needs more firm power. That could be hydro power. That could things such as geothermal power." 

O'Riley said the conservation technology being sought in the second request is also crucial to B.C.'s overall energy picture. 

"We're also focused on energy efficiency because … the cleanest and most cost-effective energy … is power that we don't use," he said. "As part of our expanded $700 million energy efficiency plan, we're looking for partners who can bring market-ready technologies that significantly improve energy efficiency in homes and businesses across B.C. and that will help our customers save energy and money."

The province said it will accept applications on both the baseload power generation and conservation technologies until September.

BC Hydro has been dealing with a long-term drought that forced the province to import electricity last fiscal year.

The Crown utility said 13,600 gigawatt hours of power was imported in 2024 — about 22 per cent of all B.C's power — but that the province has been a net electricity exporter for eight of the last 15 years.

The utility last year issued a call for power from renewable sources, later selecting nine wind and one solar project — but these are distinct from baseload projects because they rely on what BC Hydro calls "uncontrollable conditions."

Dix dismissed the notion that recent drought conditions and B.C. having to import power were factors in the process to look for more baseload power generation capacity, noting that this year's conditions are "looking better than last year" while "still facing the impact" of droughts.

"This call for power … is about the growth of our economy, about the opportunities in mining, about the requests for power that are at an extremely high level," he said. "We've got to build out clean electricity, which is one of our significant economic advantages in B.C.

"We have a lot more people in B.C. than we did … (and) we want to be in a position to build B.C. in the way that we did in the 1960s, which advanced a period of exceptional growth in our economy."

Picture Courtesy: THE CANADIAN PRESS/Darryl Dyck

MORE National ARTICLES

Bank of Canada signals shift in how it sets rates amid tariff uncertainty

Bank of Canada signals shift in how it sets rates amid tariff uncertainty
Tiff Macklem says that means monetary policymakers may be “acting quickly” when it comes to setting interest rates, rather than looking far into the horizon to stay “flexible and adaptable.”

Bank of Canada signals shift in how it sets rates amid tariff uncertainty

Descent warning triggered on Delta plane seconds before it crashed at Pearson: report

Descent warning triggered on Delta plane seconds before it crashed at Pearson: report
A preliminary report into a plane crash at Toronto's Pearson airport last month says the aircraft's alert system issued a warning about the descent rate less than three seconds before touchdown. The Transportation Safety Board of Canada released its report Thursday morning as it continues to investigate the Feb. 17 crash landing that sent 21 people to hospital, noting that it's too early to draw any conclusions.

Descent warning triggered on Delta plane seconds before it crashed at Pearson: report

RCMP in Northwest Territories charge B.C. man in fatal shooting

RCMP in Northwest Territories charge B.C. man in fatal shooting
RCMP say charges have been laid in a shooting that killed one person and injured two others in the Northwest Territories. Officers responded to a home early Saturday morning in the hamlet of Fort Providence, where a 31-year-old man was found dead.

RCMP in Northwest Territories charge B.C. man in fatal shooting

Body of missing Langley senior found months after she went missing: RCMP

Body of missing Langley senior found months after she went missing: RCMP
Mounties in Langley say the body of an 82-year-old woman has been found several months after she went missing. Jane Whitehouse was reported missing on Oct. 25 last year. 

Body of missing Langley senior found months after she went missing: RCMP

Poilievre says he wants to greenlight Ring of Fire mining permits within six months

Poilievre says he wants to greenlight Ring of Fire mining permits within six months
Conservative Leader Pierre Poilievre said Wednesday he'll "set a deadline" to approve all federal permits for mining in northwestern Ontario's Ring of Fire region within six months. Poilievre said that a Conservative government would also commit $1 billion over three years to build a road network to link the mining sites to Ontario's highway network and First Nations communities in the area.

Poilievre says he wants to greenlight Ring of Fire mining permits within six months

Gang police allege Vancouver man ran 'sophisticated' gun importation scheme

Gang police allege Vancouver man ran 'sophisticated' gun importation scheme
A 24-year-old Vancouver man faces several charges after investigators dismantled what they say was a "sophisticated" gun importation operation. The Combined Forces Special Enforcement Unit says the charges come after an investigation that began in June 2023 when packages with gun parts were "intercepted at the border." 

Gang police allege Vancouver man ran 'sophisticated' gun importation scheme