Monday, March 30, 2026
ADVT 
National

BC Hydro seeks baseload power boost from stable sources

Darpan News Desk The Canadian Press, 04 Jun, 2025 01:45 PM
  • BC Hydro seeks baseload power boost from stable sources

British Columbia's power utility has begun the process to boost the province's baseload electricity generation capacity in a bid to meet the province's growing demand from residents and industries.

Baseload capacity refers to constant and stable power sources and Energy Minister Adrian Dix said Wednesday that BC Hydro is requesting expressions of interest from companies to provide geothermal or hydroelectric projects to expand long-term power capacity and meet peak demand.

BC Hydro has also launched a second request seeking partners who can deliver "market-ready technologies" for boosting power conservation in homes and buildings across the province.

Dix said both requests are aimed at matching B.C.'s growth potential with stable and affordable electricity supply.

"It is so important to our system," Dix said at a news conference alongside BC Hydro chief executive Chris O'Riley. 

"(It is) important because it allows us to take on relatively low-cost, intermittent energy such as wind and solar, important because it's going to power our economy at a time we have never seen so much demand for electricity and so much potential for growth."

Dix said BC Hydro may explore as part of the request several types of projects including "pumped storage" hydro power generation, a system where water is pumped to an elevated reservoir during times of low electricity demand then released to generate power during peak periods.

The province did not specify how much baseload power generation it wants to add in the new request, and Dix said that was a specific decision because BC Hydro wanted to cast a wide net in terms of possible solutions it might adopt.

"There isn't a number," Dix said about the amount of electricity B.C. is looking for. "The reason for (the) expression of interest, the reason we have a short turnaround, is we want to see what's out there. 

"We believe that BC Hydro needs more firm power. That could be hydro power. That could things such as geothermal power." 

O'Riley said the conservation technology being sought in the second request is also crucial to B.C.'s overall energy picture. 

"We're also focused on energy efficiency because … the cleanest and most cost-effective energy … is power that we don't use," he said. "As part of our expanded $700 million energy efficiency plan, we're looking for partners who can bring market-ready technologies that significantly improve energy efficiency in homes and businesses across B.C. and that will help our customers save energy and money."

The province said it will accept applications on both the baseload power generation and conservation technologies until September.

BC Hydro has been dealing with a long-term drought that forced the province to import electricity last fiscal year.

The Crown utility said 13,600 gigawatt hours of power was imported in 2024 — about 22 per cent of all B.C's power — but that the province has been a net electricity exporter for eight of the last 15 years.

The utility last year issued a call for power from renewable sources, later selecting nine wind and one solar project — but these are distinct from baseload projects because they rely on what BC Hydro calls "uncontrollable conditions."

Dix dismissed the notion that recent drought conditions and B.C. having to import power were factors in the process to look for more baseload power generation capacity, noting that this year's conditions are "looking better than last year" while "still facing the impact" of droughts.

"This call for power … is about the growth of our economy, about the opportunities in mining, about the requests for power that are at an extremely high level," he said. "We've got to build out clean electricity, which is one of our significant economic advantages in B.C.

"We have a lot more people in B.C. than we did … (and) we want to be in a position to build B.C. in the way that we did in the 1960s, which advanced a period of exceptional growth in our economy."

Picture Courtesy: THE CANADIAN PRESS/Darryl Dyck

MORE National ARTICLES

B.C. shuts door on secondary-suite incentive program over 'uncertain financial times'

B.C. shuts door on secondary-suite incentive program over 'uncertain financial times'
The British Columbia government says it is cancelling an incentive program meant to entice more homeowners to build secondary suites, saying the decision is "due to uncertain financial times."  The government says in a statement that the pilot program won't accept applications after March 31. 

B.C. shuts door on secondary-suite incentive program over 'uncertain financial times'

Ottawa condemns China for executing Canadians as Beijing points to drug crime

Ottawa condemns China for executing Canadians as Beijing points to drug crime
Global Affairs Canada and the Chinese embassy both declined to say how many Canadians were executed or report the names of those killed. Ottawa did confirm they did not include Abbotsford, B.C. native Robert Lloyd Schellenberg, who was sentenced to death for drug smuggling by a Chinese court in 2019.

Ottawa condemns China for executing Canadians as Beijing points to drug crime

Ottawa provides $20M for B.C.'s forest sector amid softwood duties, trade war

Ottawa provides $20M for B.C.'s forest sector amid softwood duties, trade war
The federal government is providing about $20 million in funding to support British Columbia's forestry sector, part of Ottawa's effort to bolster the economy amid the Canada-U. S. trade war. Energy Minister Jonathan Wilkinson says it's more important than ever to support the sector, which is subject to American duties on softwood lumber and now faces the additional threat of steep tariffs from U.S. President Donald Trump.

Ottawa provides $20M for B.C.'s forest sector amid softwood duties, trade war

Commercial truck hits B.C. highway overpass, losing lumber load and snarling traffic

Commercial truck hits B.C. highway overpass, losing lumber load and snarling traffic
British Columbia's Highway Patrol says another commercial truck has hit an overpass in Metro Vancouver, causing no visible damage, but snarling traffic on Wednesday. Police say a load of lumber the tractor trailer was hauling along Highway 99 hit the Blundell Road overpass.

Commercial truck hits B.C. highway overpass, losing lumber load and snarling traffic

Consumers could find 'meaningful savings' as carbon price ends: Desjardins

Consumers could find 'meaningful savings' as carbon price ends: Desjardins
Canadians can expect to feel the absence of the consumer carbon price at the pumps immediately but it may take longer to notice a difference in the price of other goods, a new report released Wednesday suggests. The analysis by Desjardins Economics comes less than a week after Prime Minister Mark Carney and his new Liberal cabinet ordered that the consumer levy be set to zero on April 1.

Consumers could find 'meaningful savings' as carbon price ends: Desjardins

End of consumer carbon tax leaves $1.5-billion hole in B.C. budget

End of consumer carbon tax leaves $1.5-billion hole in B.C. budget
The budget released earlier this month shows the province was forecasting revenue of just over $2.5 billion from the tax in the 2024-25 fiscal year, while the estimated cost of the climate action tax credit was $995 million.

End of consumer carbon tax leaves $1.5-billion hole in B.C. budget