Sunday, May 24, 2026
ADVT 
National

B.C. Students' Space Project Delayed By Oct. Rocket Crash Delayed Again

The Canadian Press, 06 Jan, 2015 10:56 AM
    KAMLOOPS, B.C. — A science project dreamed up by a group of students in central British Columbia that exploded on a rocket launching pad almost two months ago is on hold again.
     
    An unmanned SpaceX rocket was supposed to blast off before sunrise Tuesday but the countdown was halted with just one minute remaining.
     
    Officials said the problem was with motors needed for second-stage rocket thrust steering. If controllers had not aborted the launch, computers would have done so closer to flight time, NASA launch commentator George Diller said.
     
    The soonest SpaceX can try again to send the rocket to the International Space Station is Friday.
     
    Four boys from McGowan Park Elementary School in Kamloops, B.C., had won a contest to have their experiment join 17 other student projects from across North American on a trip to the orbiting station.
     
    But the amateur experiments — along with a payload of supplies destined for the space station — were destroyed on Oct. 28 when a NASA-contracted rocket exploded in a spectacular fireball in eastern Virginia.
     
    If and when the Kamloops students' experiment gets to the station, it will examine how the zero-gravity environment of space affects the growth of crystals.
     
    The students prepared silicon tubes containing solutions that, when mixed, cause crystals to form. On the space station, astronauts would remove small clips keeping the solutions apart. When the tubes returned, the students would analyze the crystals and compare them to crystals grown on Earth.
     
    The projects are part of the Student Spaceflight Experiments Program, which is run by the Arthur C. Clarke Institute for Space Education.

    MORE National ARTICLES

    DFO Investigating After Teeth Removed From Dead Orca On Vancouver Island

    DFO Investigating After Teeth Removed From Dead Orca On Vancouver Island
    COURTENAY, B.C. — The Department of Fisheries and Oceans is investigating after someone removed teeth from a dead killer whale on Vancouver Island.

    DFO Investigating After Teeth Removed From Dead Orca On Vancouver Island

    Harper Does U-turn On Law Gagging Advocacy Groups During Elections

    Harper Does U-turn On Law Gagging Advocacy Groups During Elections
    OTTAWA — Stephen Harper used to contend that money does not influence the outcome of elections. He used to rail against any attempt to limit the amount of money outside advocacy groups could spend during campaigns.

    Harper Does U-turn On Law Gagging Advocacy Groups During Elections

    Workers Injured In A 2011 Refinery Explosion Say They Want Accountability

    Workers Injured In A 2011 Refinery Explosion Say They Want Accountability
    REGINA — Kimberly Janvier says the sounds from a construction site are all it takes to trigger intense memories of that day.  The 36-year-old scaffolder was working at an oil refinery in Regina when a pipe burst and her life changed forever. 

    Workers Injured In A 2011 Refinery Explosion Say They Want Accountability

    No winner for Saturday's Lotto 649 jackpot

    No winner for Saturday's Lotto 649 jackpot
    The jackpot for next Wednesday`s draw will rise to approximately $7 million, and there will also be one guaranteed prize of a million dollars.

    No winner for Saturday's Lotto 649 jackpot

    Wind Turbines Have Little Impact On Property Values, Study Concludes

    Wind Turbines Have Little Impact On Property Values, Study Concludes
    TORONTO — Wind turbines generally have little effect on the value of nearby properties with possibly isolated exceptions, a recent study of thousands of home and farm sales has found.

    Wind Turbines Have Little Impact On Property Values, Study Concludes

    Manitoba Collects Toys, Hosts Dinner For Families Of Missing, Murdered Women

    Manitoba Collects Toys, Hosts Dinner For Families Of Missing, Murdered Women
    WINNIPEG — For Bernadette Smith, Christmas used to be a time for large family gatherings, lots of food and the exchange of gifts.

    Manitoba Collects Toys, Hosts Dinner For Families Of Missing, Murdered Women