Monday, May 25, 2026
ADVT 
National

B.C. Students' Space Project Delayed By Oct. Rocket Crash Delayed Again

The Canadian Press, 06 Jan, 2015 10:56 AM
    KAMLOOPS, B.C. — A science project dreamed up by a group of students in central British Columbia that exploded on a rocket launching pad almost two months ago is on hold again.
     
    An unmanned SpaceX rocket was supposed to blast off before sunrise Tuesday but the countdown was halted with just one minute remaining.
     
    Officials said the problem was with motors needed for second-stage rocket thrust steering. If controllers had not aborted the launch, computers would have done so closer to flight time, NASA launch commentator George Diller said.
     
    The soonest SpaceX can try again to send the rocket to the International Space Station is Friday.
     
    Four boys from McGowan Park Elementary School in Kamloops, B.C., had won a contest to have their experiment join 17 other student projects from across North American on a trip to the orbiting station.
     
    But the amateur experiments — along with a payload of supplies destined for the space station — were destroyed on Oct. 28 when a NASA-contracted rocket exploded in a spectacular fireball in eastern Virginia.
     
    If and when the Kamloops students' experiment gets to the station, it will examine how the zero-gravity environment of space affects the growth of crystals.
     
    The students prepared silicon tubes containing solutions that, when mixed, cause crystals to form. On the space station, astronauts would remove small clips keeping the solutions apart. When the tubes returned, the students would analyze the crystals and compare them to crystals grown on Earth.
     
    The projects are part of the Student Spaceflight Experiments Program, which is run by the Arthur C. Clarke Institute for Space Education.

    MORE National ARTICLES

    Poultry Cull Begins In B.C., 80,000 Birds To Be Euthanized Because Of Avian Flu

    Poultry Cull Begins In B.C., 80,000 Birds To Be Euthanized Because Of Avian Flu
    VANCOUVER — The destruction of as many as 80,000 birds at four poultry farms in British Columbia's Fraser Valley has begun in the effort to stem the spread of avian flu.

    Poultry Cull Begins In B.C., 80,000 Birds To Be Euthanized Because Of Avian Flu

    Sex-assault conviction overturned by court in B.C. 'miscarriage of justice'

    Sex-assault conviction overturned by court in B.C. 'miscarriage of justice'
    A sexual-assault conviction that prosecutors in British Columbia have acknowledged was a "miscarriage of justice" has been overturned by the province's highest court.

    Sex-assault conviction overturned by court in B.C. 'miscarriage of justice'

    Endangered 18-year-old female killer whale found dead off Vancouver Island

    Endangered 18-year-old female killer whale found dead off Vancouver Island
    A female killer whale from a small and endangered group of orcas has been found dead off Vancouver Island.

    Endangered 18-year-old female killer whale found dead off Vancouver Island

    Canada's top 5 banks made $7.4 billion in Q4

    Canada's top 5 banks made $7.4 billion in Q4
    Canada's top banks saw their fourth-quarter profits edge higher this year, but they warned that a slew of headwinds — including the sluggish global economy, a slowdown in consumer lending and volatility on the stock markets — will make the year ahead challenging.

    Canada's top 5 banks made $7.4 billion in Q4

    RCMP officer shot in B.C. during traffic stop has second surgery

    RCMP officer shot in B.C. during traffic stop has second surgery
    An RCMP officer who was critically shot during a traffic stop in Kamloops, B.C., has had a second surgery.

    RCMP officer shot in B.C. during traffic stop has second surgery

    More Ontario Children, Youth Being Treated For Concussions, Study Finds

    More Ontario Children, Youth Being Treated For Concussions, Study Finds
    TORONTO — A study has found that the number of children and youth treated for concussions in both emergency departments and doctors' offices in Ontario has risen significantly.

    More Ontario Children, Youth Being Treated For Concussions, Study Finds