Sunday, May 17, 2026
ADVT 
National

B.C. Students' Space Project Delayed By Oct. Rocket Crash Delayed Again

The Canadian Press, 06 Jan, 2015 10:56 AM
    KAMLOOPS, B.C. — A science project dreamed up by a group of students in central British Columbia that exploded on a rocket launching pad almost two months ago is on hold again.
     
    An unmanned SpaceX rocket was supposed to blast off before sunrise Tuesday but the countdown was halted with just one minute remaining.
     
    Officials said the problem was with motors needed for second-stage rocket thrust steering. If controllers had not aborted the launch, computers would have done so closer to flight time, NASA launch commentator George Diller said.
     
    The soonest SpaceX can try again to send the rocket to the International Space Station is Friday.
     
    Four boys from McGowan Park Elementary School in Kamloops, B.C., had won a contest to have their experiment join 17 other student projects from across North American on a trip to the orbiting station.
     
    But the amateur experiments — along with a payload of supplies destined for the space station — were destroyed on Oct. 28 when a NASA-contracted rocket exploded in a spectacular fireball in eastern Virginia.
     
    If and when the Kamloops students' experiment gets to the station, it will examine how the zero-gravity environment of space affects the growth of crystals.
     
    The students prepared silicon tubes containing solutions that, when mixed, cause crystals to form. On the space station, astronauts would remove small clips keeping the solutions apart. When the tubes returned, the students would analyze the crystals and compare them to crystals grown on Earth.
     
    The projects are part of the Student Spaceflight Experiments Program, which is run by the Arthur C. Clarke Institute for Space Education.

    MORE National ARTICLES

    Second hike in a year for citizenship fees to recoup more of the cost

    Second hike in a year for citizenship fees to recoup more of the cost
    OTTAWA — Resolving to become a Canadian citizen in 2015? It's going to be more expensive.

    Second hike in a year for citizenship fees to recoup more of the cost

    5 people in hospital after crash between car, horse-drawn sleigh in Nova Scotia

    5 people in hospital after crash between car, horse-drawn sleigh in Nova Scotia
    WILMOT, N.S. — Five people are in hospital after a collision between a horse-drawn sleigh and a car in western Nova Scotia.

    5 people in hospital after crash between car, horse-drawn sleigh in Nova Scotia

    Dozens take icy plunge into Nova Scotia waters in annual polar bear dip

    Dozens take icy plunge into Nova Scotia waters in annual polar bear dip
    HALIFAX — People donned tutus and neon Speedos as they plunged into the icy waters of the Atlantic Ocean today for an annual polar bear dip in Nova Scotia.

    Dozens take icy plunge into Nova Scotia waters in annual polar bear dip

    Imam wants radical recruiters of Muslim youth in Canada identified and dealt with

    Imam wants radical recruiters of Muslim youth in Canada identified and dealt with
    CALGARY — Reaching out to talk with Muslim youth who are at risk of being radicalized isn't enough to stop it from happening, say parents, clerics and police.

    Imam wants radical recruiters of Muslim youth in Canada identified and dealt with

    Second-degree murder charge in Kamloops after city's only homicide of 2014

    Second-degree murder charge in Kamloops after city's only homicide of 2014
    KAMLOOPS, B.C. — A 41-year-old man has been charged with second-degree murder in Kamloops, B.C., after the city's only homicide of the year.

    Second-degree murder charge in Kamloops after city's only homicide of 2014

    Gun used in Edmonton mass murders was stolen in Surrey, B.C., in 2006

    Gun used in Edmonton mass murders was stolen in Surrey, B.C., in 2006
    VANCOUVER — Investigators say a gun used in a mass murder in Alberta was stolen in B.C.

    Gun used in Edmonton mass murders was stolen in Surrey, B.C., in 2006