Sunday, May 17, 2026
ADVT 
National

B.C. Students' Space Project Delayed By Oct. Rocket Crash Delayed Again

The Canadian Press, 06 Jan, 2015 10:56 AM
    KAMLOOPS, B.C. — A science project dreamed up by a group of students in central British Columbia that exploded on a rocket launching pad almost two months ago is on hold again.
     
    An unmanned SpaceX rocket was supposed to blast off before sunrise Tuesday but the countdown was halted with just one minute remaining.
     
    Officials said the problem was with motors needed for second-stage rocket thrust steering. If controllers had not aborted the launch, computers would have done so closer to flight time, NASA launch commentator George Diller said.
     
    The soonest SpaceX can try again to send the rocket to the International Space Station is Friday.
     
    Four boys from McGowan Park Elementary School in Kamloops, B.C., had won a contest to have their experiment join 17 other student projects from across North American on a trip to the orbiting station.
     
    But the amateur experiments — along with a payload of supplies destined for the space station — were destroyed on Oct. 28 when a NASA-contracted rocket exploded in a spectacular fireball in eastern Virginia.
     
    If and when the Kamloops students' experiment gets to the station, it will examine how the zero-gravity environment of space affects the growth of crystals.
     
    The students prepared silicon tubes containing solutions that, when mixed, cause crystals to form. On the space station, astronauts would remove small clips keeping the solutions apart. When the tubes returned, the students would analyze the crystals and compare them to crystals grown on Earth.
     
    The projects are part of the Student Spaceflight Experiments Program, which is run by the Arthur C. Clarke Institute for Space Education.

    MORE National ARTICLES

    5.4 Magnitude Earthquake Rattles In Ocean Off Vancouver Island's West Coast; No Damage Reported

    5.4 Magnitude Earthquake Rattles In Ocean Off Vancouver Island's West Coast; No Damage Reported
    VANCOUVER — A 5.4 magnitude earthquake has struck 211 kilometres west of northern Vancouver Island.

    5.4 Magnitude Earthquake Rattles In Ocean Off Vancouver Island's West Coast; No Damage Reported

    Ballard says it won't meet 2014 guidance due to contract breaches in China

    Ballard says it won't meet 2014 guidance due to contract breaches in China
    VANCOUVER — Ballard Power Systems (TSX:BLD) says it will fall short of its guidance for 2014 revenue and adjusted earnings as a result of alleged contract breaches by Azure Hydrogen, which was licensed to assemble Ballard products for the Chinese market.

    Ballard says it won't meet 2014 guidance due to contract breaches in China

    Winnipeg baby left in cold in recycling bin; teen charged: police

    Winnipeg baby left in cold in recycling bin; teen charged: police
    WINNIPEG — A Winnipeg teenager has been charged after police say a 19-month-old girl was found in a dumpster in freezing weather.

    Winnipeg baby left in cold in recycling bin; teen charged: police

    Calgary police probe another shooting; unknown if related to house shootings

    Calgary police probe another shooting; unknown if related to house shootings
    Calgary police are investigating another fatal shooting but say it's not known if the death is related to a New Year's Day shooting that left one person dead and six wounded.

    Calgary police probe another shooting; unknown if related to house shootings

    Canadian exporters to Russia assess fallout of currency crisis, sanctions

    Canadian exporters to Russia assess fallout of currency crisis, sanctions
    OTTAWA — Canadian exporters stung by Russia's currency crisis and its retaliatory sanctions against the West wonder what 2015 will hold for a market filled with promise less than 12 months ago.

    Canadian exporters to Russia assess fallout of currency crisis, sanctions

    Manitoba Premier Greg Selinger enters leadership race that he was forced into

    Manitoba Premier Greg Selinger enters leadership race that he was forced into
    WINNIPEG — Manitoba Premier Greg Selinger is officially launching his campaign to keep his job today.

    Manitoba Premier Greg Selinger enters leadership race that he was forced into