Wednesday, May 27, 2026
ADVT 
National

B.C. Students' Space Project Delayed By Oct. Rocket Crash Delayed Again

The Canadian Press, 06 Jan, 2015 10:56 AM
    KAMLOOPS, B.C. — A science project dreamed up by a group of students in central British Columbia that exploded on a rocket launching pad almost two months ago is on hold again.
     
    An unmanned SpaceX rocket was supposed to blast off before sunrise Tuesday but the countdown was halted with just one minute remaining.
     
    Officials said the problem was with motors needed for second-stage rocket thrust steering. If controllers had not aborted the launch, computers would have done so closer to flight time, NASA launch commentator George Diller said.
     
    The soonest SpaceX can try again to send the rocket to the International Space Station is Friday.
     
    Four boys from McGowan Park Elementary School in Kamloops, B.C., had won a contest to have their experiment join 17 other student projects from across North American on a trip to the orbiting station.
     
    But the amateur experiments — along with a payload of supplies destined for the space station — were destroyed on Oct. 28 when a NASA-contracted rocket exploded in a spectacular fireball in eastern Virginia.
     
    If and when the Kamloops students' experiment gets to the station, it will examine how the zero-gravity environment of space affects the growth of crystals.
     
    The students prepared silicon tubes containing solutions that, when mixed, cause crystals to form. On the space station, astronauts would remove small clips keeping the solutions apart. When the tubes returned, the students would analyze the crystals and compare them to crystals grown on Earth.
     
    The projects are part of the Student Spaceflight Experiments Program, which is run by the Arthur C. Clarke Institute for Space Education.

    MORE National ARTICLES

    Canadian Citizen Stabbed By Local Man In Oil-rich Eastern Part Of Saudi Arabia

    Canadian Citizen Stabbed By Local Man In Oil-rich Eastern Part Of Saudi Arabia
    RIYADH, Saudi Arabia — The official Saudi Press Agency says a Canadian citizen was stabbed by a local man while he shopped in a mall with his family in the country's oil-rich Eastern Province.

    Canadian Citizen Stabbed By Local Man In Oil-rich Eastern Part Of Saudi Arabia

    Gill Rosenberg, Canadian Citizen, Reportedly Captured By ISIS In Syria

    Gill Rosenberg, Canadian Citizen, Reportedly Captured By ISIS In Syria
    An Israeli newspaper report says Islamist websites are claiming extremists have kidnapped an Israeli-Canadian woman who joined Kurdish fighters overseas.

    Gill Rosenberg, Canadian Citizen, Reportedly Captured By ISIS In Syria

    Philippines' Jamie Herrell Wins Miss Earth 2014 Title

    Philippines' Jamie Herrell Wins Miss Earth 2014 Title
    Jamie Herrel of the Philippines was Saturday crowned Miss Earth 2014. The runners-up are Miss USA, who was crowned Miss Air, Miss Venezuela won the Miss Water title and Miss Fire went to Miss Russia.

    Philippines' Jamie Herrell Wins Miss Earth 2014 Title

    Statue Of Indian-origin British Fighter Pilot Unveiled In Kent

    Statue Of Indian-origin British Fighter Pilot Unveiled In Kent
    A statue of Mahinder Singh Pujji, an Indian-origin fighter pilot who had served in Britain's Royal Air Force (RAF) during the Second World War, was unveiled in Kent.

    Statue Of Indian-origin British Fighter Pilot Unveiled In Kent

    $50-million Lotto Max Jackpot To Be Split In Two

    $50-million Lotto Max Jackpot To Be Split In Two
    $50-million Lotto Max Jackpot To Be Split In Two

    $50-million Lotto Max Jackpot To Be Split In Two

    Rehtaeh Parsons Society To Tackle Cyberbullying, Youth Sexual Violence

    Rehtaeh Parsons Society To Tackle Cyberbullying, Youth Sexual Violence
    HALIFAX — The parents of Rehtaeh Parsons have set up a new organization to address the prevalence of cyberbullying, youth sexual violence and the distribution of images among young people.

    Rehtaeh Parsons Society To Tackle Cyberbullying, Youth Sexual Violence