Wednesday, May 27, 2026
ADVT 
National

B.C. Students' Space Project Delayed By Oct. Rocket Crash Delayed Again

The Canadian Press, 06 Jan, 2015 10:56 AM
    KAMLOOPS, B.C. — A science project dreamed up by a group of students in central British Columbia that exploded on a rocket launching pad almost two months ago is on hold again.
     
    An unmanned SpaceX rocket was supposed to blast off before sunrise Tuesday but the countdown was halted with just one minute remaining.
     
    Officials said the problem was with motors needed for second-stage rocket thrust steering. If controllers had not aborted the launch, computers would have done so closer to flight time, NASA launch commentator George Diller said.
     
    The soonest SpaceX can try again to send the rocket to the International Space Station is Friday.
     
    Four boys from McGowan Park Elementary School in Kamloops, B.C., had won a contest to have their experiment join 17 other student projects from across North American on a trip to the orbiting station.
     
    But the amateur experiments — along with a payload of supplies destined for the space station — were destroyed on Oct. 28 when a NASA-contracted rocket exploded in a spectacular fireball in eastern Virginia.
     
    If and when the Kamloops students' experiment gets to the station, it will examine how the zero-gravity environment of space affects the growth of crystals.
     
    The students prepared silicon tubes containing solutions that, when mixed, cause crystals to form. On the space station, astronauts would remove small clips keeping the solutions apart. When the tubes returned, the students would analyze the crystals and compare them to crystals grown on Earth.
     
    The projects are part of the Student Spaceflight Experiments Program, which is run by the Arthur C. Clarke Institute for Space Education.

    MORE National ARTICLES

    Peterborough stands by no-touch policy for crossing guards despite protest

    Peterborough stands by no-touch policy for crossing guards despite protest
    PETERBOROUGH, Ont. — A city northeast of Toronto is standing by a policy that prevents crossing guards from giving or receiving high-fives from children despite complaints from some parents that the ban is "ridiculous."

    Peterborough stands by no-touch policy for crossing guards despite protest

    Quebec ending free and unlimited access to in vitro fertilization program

    Quebec ending free and unlimited access to in vitro fertilization program
    Quebec is putting an end to free and unlimited access to its in vitro fertilization program.

    Quebec ending free and unlimited access to in vitro fertilization program

    CFL commissioner Mark Cohon makes final Grey Cup state of the union address

    CFL commissioner Mark Cohon makes final Grey Cup state of the union address

    VANCOUVER — CFL commissioner Mark Cohon says his departure comes at a time of stability for...

    CFL commissioner Mark Cohon makes final Grey Cup state of the union address

    No simple solutions to revenue shortfall due to falling oil prices: Prentice

    No simple solutions to revenue shortfall due to falling oil prices: Prentice
    CALGARY — Alberta Premier Jim Prentice says there are no simple solutions for the revenue shortfall that will be coming due to plummeting oil prices.

    No simple solutions to revenue shortfall due to falling oil prices: Prentice

    Gas prices tumbling along with crude oil, but lower dollar is a headwind

    Gas prices tumbling along with crude oil, but lower dollar is a headwind
    CALGARY — With the price of crude plunging to its lowest level more than four and a half years, consumers are benefiting at the gas pump, but the savings are being dampened somewhat by a weaker dollar and other factors, according to an energy expert.

    Gas prices tumbling along with crude oil, but lower dollar is a headwind

    Oldest Canadian, Merle Barwis, held title for almost two years; dies at 113

    Oldest Canadian, Merle Barwis, held title for almost two years; dies at 113
    Canada’s oldest person who was known for celebrating her birthday with a cold beer has died just one month and one day shy of her 114th birthday.

    Oldest Canadian, Merle Barwis, held title for almost two years; dies at 113