Friday, December 26, 2025
ADVT 
National

B.C. Students' Space Project Delayed By Oct. Rocket Crash Delayed Again

The Canadian Press, 06 Jan, 2015 10:56 AM
    KAMLOOPS, B.C. — A science project dreamed up by a group of students in central British Columbia that exploded on a rocket launching pad almost two months ago is on hold again.
     
    An unmanned SpaceX rocket was supposed to blast off before sunrise Tuesday but the countdown was halted with just one minute remaining.
     
    Officials said the problem was with motors needed for second-stage rocket thrust steering. If controllers had not aborted the launch, computers would have done so closer to flight time, NASA launch commentator George Diller said.
     
    The soonest SpaceX can try again to send the rocket to the International Space Station is Friday.
     
    Four boys from McGowan Park Elementary School in Kamloops, B.C., had won a contest to have their experiment join 17 other student projects from across North American on a trip to the orbiting station.
     
    But the amateur experiments — along with a payload of supplies destined for the space station — were destroyed on Oct. 28 when a NASA-contracted rocket exploded in a spectacular fireball in eastern Virginia.
     
    If and when the Kamloops students' experiment gets to the station, it will examine how the zero-gravity environment of space affects the growth of crystals.
     
    The students prepared silicon tubes containing solutions that, when mixed, cause crystals to form. On the space station, astronauts would remove small clips keeping the solutions apart. When the tubes returned, the students would analyze the crystals and compare them to crystals grown on Earth.
     
    The projects are part of the Student Spaceflight Experiments Program, which is run by the Arthur C. Clarke Institute for Space Education.

    MORE National ARTICLES

    Vancouver Police Officer Under Investigation For Driving Drunk In Delta

    Vancouver Police Officer Under Investigation For Driving Drunk In Delta
    LADNER, B.C. — The conduct of a Vancouver police officer is being probed after police in Delta, B.C., determined he had consumed alcohol.

    Vancouver Police Officer Under Investigation For Driving Drunk In Delta

    BC Judge Declines To Hear Application To Throw Out Gang Murder Convictions

    BC Judge Declines To Hear Application To Throw Out Gang Murder Convictions
    VANCOUVER — A judge has declined to hear an abuse-of-process application from two gangsters who were seeking to throw out their murder convictions.

    BC Judge Declines To Hear Application To Throw Out Gang Murder Convictions

    Red Chris mine failure would likely be much worse than Mount Polley

    Red Chris mine failure would likely be much worse than Mount Polley
    ISKUT, B.C. — A third-party review into the design of a northwestern B.C. gold and copper mine says it has the potential to cause significantly more environmental damage than the Mount Polley breach.

    Red Chris mine failure would likely be much worse than Mount Polley

    Eaton Centre shooter to undergo psychiatric assessment

    Eaton Centre shooter to undergo psychiatric assessment
    TORONTO — Prosecutors are seeking a psychiatric assessment for the man accused of fatally shooting two people and injuring several others at Toronto's Eaton Centre.

    Eaton Centre shooter to undergo psychiatric assessment

    More women serving on corporate boards, but not yet enough, says study

    More women serving on corporate boards, but not yet enough, says study
    TORONTO — A new study suggests that while number of women on the boards of top Canadian companies is improving, there still is ”significant work to be done.”

    More women serving on corporate boards, but not yet enough, says study

    Mulcair says dismal byelection results don't predict general election outcome

    Mulcair says dismal byelection results don't predict general election outcome
    OTTAWA — Tom Mulcair is shrugging off the NDP's dismal performance in byelections.

    Mulcair says dismal byelection results don't predict general election outcome