Friday, December 26, 2025
ADVT 
National

B.C. Students' Space Project Delayed By Oct. Rocket Crash Delayed Again

The Canadian Press, 06 Jan, 2015 10:56 AM
    KAMLOOPS, B.C. — A science project dreamed up by a group of students in central British Columbia that exploded on a rocket launching pad almost two months ago is on hold again.
     
    An unmanned SpaceX rocket was supposed to blast off before sunrise Tuesday but the countdown was halted with just one minute remaining.
     
    Officials said the problem was with motors needed for second-stage rocket thrust steering. If controllers had not aborted the launch, computers would have done so closer to flight time, NASA launch commentator George Diller said.
     
    The soonest SpaceX can try again to send the rocket to the International Space Station is Friday.
     
    Four boys from McGowan Park Elementary School in Kamloops, B.C., had won a contest to have their experiment join 17 other student projects from across North American on a trip to the orbiting station.
     
    But the amateur experiments — along with a payload of supplies destined for the space station — were destroyed on Oct. 28 when a NASA-contracted rocket exploded in a spectacular fireball in eastern Virginia.
     
    If and when the Kamloops students' experiment gets to the station, it will examine how the zero-gravity environment of space affects the growth of crystals.
     
    The students prepared silicon tubes containing solutions that, when mixed, cause crystals to form. On the space station, astronauts would remove small clips keeping the solutions apart. When the tubes returned, the students would analyze the crystals and compare them to crystals grown on Earth.
     
    The projects are part of the Student Spaceflight Experiments Program, which is run by the Arthur C. Clarke Institute for Space Education.

    MORE National ARTICLES

    Plenty riding on whether high court will hear appeal for off-reserve aboriginals

    Plenty riding on whether high court will hear appeal for off-reserve aboriginals
    OTTAWA — Canada's Metis and non-status Indians will learn Thursday whether the Supreme Court will hear a high-stakes landmark case that could extend the federal government's responsibilities to hundreds of thousands of off-reserve Aboriginal Peoples.

    Plenty riding on whether high court will hear appeal for off-reserve aboriginals

    Former Bloc member Mourani to join New Democrats, but not yet as an MP

    Former Bloc member Mourani to join New Democrats, but not yet as an MP
    OTTAWA — A former Bloc Quebecois MP is joining the federal New Democrats.

    Former Bloc member Mourani to join New Democrats, but not yet as an MP

    Keystone XL pipeline down, but not out, after U.S. Senate vote

    Keystone XL pipeline down, but not out, after U.S. Senate vote
    WASHINGTON — The woman who almost forced U.S. President Barack Obama to make a decision on the Keystone XL pipeline stood quietly on the Senate floor as her plans went down in flames Tuesday.

    Keystone XL pipeline down, but not out, after U.S. Senate vote

    NDP law expert told Liberals misconduct allegation could be assault: sources

    NDP law expert told Liberals misconduct allegation could be assault: sources
    OTTAWA — Craig Scott, a New Democrat MP and former law professor, said to the Liberals that what he was told happened to one of his female colleagues could be defined as an alleged sexual assault, multiple sources have told The Canadian Press.

    NDP law expert told Liberals misconduct allegation could be assault: sources

    Today on the Hill: Veterans meet their minister and Sona faces sentence

    Today on the Hill: Veterans meet their minister and Sona faces sentence
    OTTAWA — Two major events affecting political life in Ottawa are taking place today each about a five-hour drive from Parliament Hill in opposite directions.

    Today on the Hill: Veterans meet their minister and Sona faces sentence

    Contractor who built seniors' home that burned says it didn't meet standards

    Contractor who built seniors' home that burned says it didn't meet standards
    RIVIERE-DU-LOUP, Que. — The contractor who built the seniors' residence that burned last January, killing 32 people, says it did not comply with building-code standards in place at the time of the blaze.

    Contractor who built seniors' home that burned says it didn't meet standards