Friday, December 26, 2025
ADVT 
National

B.C. Students' Space Project Delayed By Oct. Rocket Crash Delayed Again

The Canadian Press, 06 Jan, 2015 10:56 AM
    KAMLOOPS, B.C. — A science project dreamed up by a group of students in central British Columbia that exploded on a rocket launching pad almost two months ago is on hold again.
     
    An unmanned SpaceX rocket was supposed to blast off before sunrise Tuesday but the countdown was halted with just one minute remaining.
     
    Officials said the problem was with motors needed for second-stage rocket thrust steering. If controllers had not aborted the launch, computers would have done so closer to flight time, NASA launch commentator George Diller said.
     
    The soonest SpaceX can try again to send the rocket to the International Space Station is Friday.
     
    Four boys from McGowan Park Elementary School in Kamloops, B.C., had won a contest to have their experiment join 17 other student projects from across North American on a trip to the orbiting station.
     
    But the amateur experiments — along with a payload of supplies destined for the space station — were destroyed on Oct. 28 when a NASA-contracted rocket exploded in a spectacular fireball in eastern Virginia.
     
    If and when the Kamloops students' experiment gets to the station, it will examine how the zero-gravity environment of space affects the growth of crystals.
     
    The students prepared silicon tubes containing solutions that, when mixed, cause crystals to form. On the space station, astronauts would remove small clips keeping the solutions apart. When the tubes returned, the students would analyze the crystals and compare them to crystals grown on Earth.
     
    The projects are part of the Student Spaceflight Experiments Program, which is run by the Arthur C. Clarke Institute for Space Education.

    MORE National ARTICLES

    Magnotta trial hears psychiatrist unable to track down accused's acquaintances

    Magnotta trial hears psychiatrist unable to track down accused's acquaintances
    MONTREAL — A psychiatrist who assessed Luka Rocco Magnotta for criminal responsibility says he wasn't able to interview two people the accused said had a major presence in his life.

    Magnotta trial hears psychiatrist unable to track down accused's acquaintances

    Residential school lawsuits in Newfoundland and Labrador could face delay

    Residential school lawsuits in Newfoundland and Labrador could face delay
    ST. JOHN'S, N.L. — Former Newfoundland and Labrador residential school students suing for an apology and compensation listened today as a federal application was argued that could delay the case for months.

    Residential school lawsuits in Newfoundland and Labrador could face delay

    Jury sees damaged boat at murder trial of lobster fisherman in Cape Breton

    Jury sees damaged boat at murder trial of lobster fisherman in Cape Breton
    PORT HAWKESBURY, N.S. — The damaged boat that Phillip Boudreau was on before he disappeared in a Cape Breton harbour was shown to the jury on Tuesday at the second-degree murder trial of a man who has pleaded not guilty in his slaying.

    Jury sees damaged boat at murder trial of lobster fisherman in Cape Breton

    Manitoba moves to get children under government care out of hotels

    Manitoba moves to get children under government care out of hotels
    WINNIPEG — The Manitoba government is taking steps to reduce the number of children in care housed in hotels.

    Manitoba moves to get children under government care out of hotels

    Alberta RCMP say natural gas pipeline intentionally shot with high-powered rifle

    Alberta RCMP say natural gas pipeline intentionally shot with high-powered rifle
    HINTON, Alta. — RCMP in Alberta say they are looking for a person who intentionally shot a natural gas pipeline.

    Alberta RCMP say natural gas pipeline intentionally shot with high-powered rifle

    Parole board keeps travel ban outside of Canada on for Robert Latimer

    SASKATOON — The Parole Board of Canada says a condition that bans Robert Latimer from leaving the country without permission will not be lifted.

    Parole board keeps travel ban outside of Canada on for Robert Latimer