Saturday, December 27, 2025
ADVT 
National

B.C. Students' Space Project Delayed By Oct. Rocket Crash Delayed Again

The Canadian Press, 06 Jan, 2015 10:56 AM
    KAMLOOPS, B.C. — A science project dreamed up by a group of students in central British Columbia that exploded on a rocket launching pad almost two months ago is on hold again.
     
    An unmanned SpaceX rocket was supposed to blast off before sunrise Tuesday but the countdown was halted with just one minute remaining.
     
    Officials said the problem was with motors needed for second-stage rocket thrust steering. If controllers had not aborted the launch, computers would have done so closer to flight time, NASA launch commentator George Diller said.
     
    The soonest SpaceX can try again to send the rocket to the International Space Station is Friday.
     
    Four boys from McGowan Park Elementary School in Kamloops, B.C., had won a contest to have their experiment join 17 other student projects from across North American on a trip to the orbiting station.
     
    But the amateur experiments — along with a payload of supplies destined for the space station — were destroyed on Oct. 28 when a NASA-contracted rocket exploded in a spectacular fireball in eastern Virginia.
     
    If and when the Kamloops students' experiment gets to the station, it will examine how the zero-gravity environment of space affects the growth of crystals.
     
    The students prepared silicon tubes containing solutions that, when mixed, cause crystals to form. On the space station, astronauts would remove small clips keeping the solutions apart. When the tubes returned, the students would analyze the crystals and compare them to crystals grown on Earth.
     
    The projects are part of the Student Spaceflight Experiments Program, which is run by the Arthur C. Clarke Institute for Space Education.

    MORE National ARTICLES

    Wallet stolen on camping trip in 1979 returned to woman in Kamloops, B.C.

    Wallet stolen on camping trip in 1979 returned to woman in Kamloops, B.C.
    KAMLOOPS, B.C. — When Martha Shepherd answered the phone, the last thing she expected to hear was that someone found her wallet — 35 years after her purse was stolen.

    Wallet stolen on camping trip in 1979 returned to woman in Kamloops, B.C.

    Record Number Of Foreign Student Study At US Colleges; Students From China Fuel The Growth

    Record Number Of Foreign Student Study At US Colleges; Students From China Fuel The Growth
    WASHINGTON — The number of foreign exchange students studying at U.S. colleges and universities is at a record high, with nearly one-third coming from China.

    Record Number Of Foreign Student Study At US Colleges; Students From China Fuel The Growth

    Magnotta Can't Explain Why He Was Wearing Lin's Clothing In Hours After Slaying

    Magnotta Can't Explain Why He Was Wearing Lin's Clothing In Hours After Slaying
    MONTREAL — Luka Rocco Magnotta told a psychiatrist he didn't know why he was wearing Jun Lin's clothing after the Chinese student's slaying and dismemberment, jurors heard Monday.

    Magnotta Can't Explain Why He Was Wearing Lin's Clothing In Hours After Slaying

    CRTC Asks How Much Violators Should Pay

    CRTC Asks How Much Violators Should Pay
    OTTAWA — Canadians are being asked for their thoughts about how violators should be penalized for contravening the new voter contact registry.

    CRTC Asks How Much Violators Should Pay

    Inquest begins into fire that killed 32 people at Quebec seniors' residence

    Inquest begins into fire that killed 32 people at Quebec seniors' residence
    RIVIERE-DU-LOUP, Que. — A coroner's inquest has begun into the fire that killed 32 people at a seniors' residence in eastern Quebec last January.

    Inquest begins into fire that killed 32 people at Quebec seniors' residence

    Gaglardi's Jet And Other Flight Legends On Display At BC Aviation Museum

    Gaglardi's Jet And Other Flight Legends On Display At BC Aviation Museum
    SIDNEY, B.C. — A shiny, chrome-coated Beechcraft 18 aircraft that was once used by former provincial cabinet minister Phil Gaglardi to inspect the province's highways is one of the historic exhibits at British Columbia's Aviation Museum.

    Gaglardi's Jet And Other Flight Legends On Display At BC Aviation Museum