Sunday, December 28, 2025
ADVT 
National

B.C. Students' Space Project Delayed By Oct. Rocket Crash Delayed Again

The Canadian Press, 06 Jan, 2015 10:56 AM
    KAMLOOPS, B.C. — A science project dreamed up by a group of students in central British Columbia that exploded on a rocket launching pad almost two months ago is on hold again.
     
    An unmanned SpaceX rocket was supposed to blast off before sunrise Tuesday but the countdown was halted with just one minute remaining.
     
    Officials said the problem was with motors needed for second-stage rocket thrust steering. If controllers had not aborted the launch, computers would have done so closer to flight time, NASA launch commentator George Diller said.
     
    The soonest SpaceX can try again to send the rocket to the International Space Station is Friday.
     
    Four boys from McGowan Park Elementary School in Kamloops, B.C., had won a contest to have their experiment join 17 other student projects from across North American on a trip to the orbiting station.
     
    But the amateur experiments — along with a payload of supplies destined for the space station — were destroyed on Oct. 28 when a NASA-contracted rocket exploded in a spectacular fireball in eastern Virginia.
     
    If and when the Kamloops students' experiment gets to the station, it will examine how the zero-gravity environment of space affects the growth of crystals.
     
    The students prepared silicon tubes containing solutions that, when mixed, cause crystals to form. On the space station, astronauts would remove small clips keeping the solutions apart. When the tubes returned, the students would analyze the crystals and compare them to crystals grown on Earth.
     
    The projects are part of the Student Spaceflight Experiments Program, which is run by the Arthur C. Clarke Institute for Space Education.

    MORE National ARTICLES

    Brampton Mayor Susan Fennell To Undergo Spinal Surgery

    Brampton Mayor Susan Fennell To Undergo Spinal Surgery
    BRAMPTON, Ont. - Outgoing Brampton Mayor Susan Fennell is set to undergo urgent spinal surgery, according to a statement issued by her office.

    Brampton Mayor Susan Fennell To Undergo Spinal Surgery

    Card Game App Maker Who Faced Lawsuit Folds And Changes Name Of Download

    Card Game App Maker Who Faced Lawsuit Folds And Changes Name Of Download
    A Saskatchewan programmer says it's cheaper for him to simply call his Kaiser card game app something else rather than fight a lawsuit over the name.

    Card Game App Maker Who Faced Lawsuit Folds And Changes Name Of Download

    Proposed B.C. LNG project worth $40 billion

    Proposed B.C. LNG project worth $40 billion
    VICTORIA - A major player in British Columbia's liquefied natural gas sweepstakes has plans to spend up to $40 billion to build a proposed  export facility on the province's northern coast that could generate up to $39 billion in tax revenues over its lifespan.

    Proposed B.C. LNG project worth $40 billion

    Collision Between Train And Car Kills Abbotsford Man, Cuts Power

    Collision Between Train And Car Kills Abbotsford Man, Cuts Power
    A 36-year-old Abbotsford, B.C., man is dead after a train slammed into his car early Saturday. Const. Ian MacDonald with Abbotsford Police says several train cars were derailed by the collision, which happened just before 3 a.m.

    Collision Between Train And Car Kills Abbotsford Man, Cuts Power

    Gurupurab Radiothon raises $1.6 million for hospitals in Surrey and Calgary

    Gurupurab Radiothon raises $1.6 million for hospitals in Surrey and Calgary
    The South Asian communities of both Surrey and Calgary gave generously to two major hospitals on November 6, celebrating the birthday (Gurupurab) of Shri Guru Nanak Dev ji, the founder of the Sikh faith. The Radiothons were organized by RED FM, which operates two ethnic radio stations in Surrey and one in Calgary.

    Gurupurab Radiothon raises $1.6 million for hospitals in Surrey and Calgary

    Search Resumes In B.C. River For Missing Alberta Man Last Seen In Truck

    Search Resumes In B.C. River For Missing Alberta Man Last Seen In Truck
    TERRACE, B.C. — Recovery efforts are underway in Terrace, B.C., as searchers take advantage of better weather in an effort to find a missing Alberta man who was last seen in a truck in the Skeen River.

    Search Resumes In B.C. River For Missing Alberta Man Last Seen In Truck